|
---|
Category:Slides and Viewgraphs
MONTHYEARML24310A0572024-10-29029 October 2024 HI-STAR 100MB Pre-Submittal Presentation to NRC - Non Proprietary ML24276A1722024-08-26026 August 2024 HI-STAR 80 Pre-submittal Presentation to NRC - Non Proprietary ML24199A0812024-06-30030 June 2024 Enclosure 2: HI-STAR 330 Pre-submittal Presentation to the U.S. Nuclear Regulatory Commission - Public Session ML24157A0522024-06-17017 June 2024 Enclosure 2: HI-STORM 100 Amendment 19 Pre-submittal Presentation to the U.S. Nuclear Regulatory Commission - Public Slides ML24116A2932024-04-29029 April 2024 Pre-Submittal Meeting on April 29, 2024 - Palisades Nuclear Plant Power Operations Quality Assurance Program Manual ML24086A5822024-04-0303 April 2024 Construction Permit Application: Initial Environmental & Site Characterization ML24074A3302024-03-18018 March 2024 March 18, 2024 Pre-submittal Meeting for Proposed Emergency Plan at the Palisades Nuclear Plant (Presentation) ML24036A1082024-02-0606 February 2024 Pre-submittal Meeting for Palisades Nuclear Plant Power Operations Technical Specifications Administrative Controls and Quality Assurance Program (Presentation) ML23297A2612023-10-25025 October 2023 CBS Pec Presentation Slides ML23234A2652023-08-29029 August 2023 Handout for Public Meeting with Holtec on HI-STORM Umax Amendment No. 3 Resubmittal (August 29, 2023) ML23235A1802023-08-29029 August 2023 Public Meeting 08/29/23 - Palisades Nuclear Plant - Return to Power Operations - Exemption to CFR 50.82(a)(2) ML23150A2292023-06-0202 June 2023 Handout for Public Meeting with Holtec on HI-STORM Umax Amendment No. 3 (June 2, 2023) ML23139A1922023-05-24024 May 2023 Slides for Public Meeting on 5/24/23 ML23117A3712023-05-0202 May 2023 NEI Lessons Learned Meeting Slides, May 2, 2023 ML22335A5572022-11-22022 November 2022 HI-STAR Pbt NRC Meeting Nov 22 2022 - Public Session Slides ML22307A2032022-11-0202 November 2022 HI-STORM FW Amendment 10 Affidavit ML22307A2042022-11-0202 November 2022 HI-STORM FW Amendment 10 Non-Proprietary Pre-submittal Slides ML22187A2702022-07-0606 July 2022 International, HI-STORM 100 Amendment 18 Rsi Clarification Meeting ML22046A2422022-02-10010 February 2022 Slides - NRC Meeting to Discuss Rsis for HI-STAR Pbt ML21298A2222021-10-25025 October 2021 HI-STORM Amd. 18 Pre-submittal Slides ML21252A4902021-08-31031 August 2021 HI-STAR Pbt Tpbar Pre-Application Meeting 31 Aug 2021 Non-Proprietary 082721 (003) ML21216A0632021-08-0404 August 2021 Presentation Slides - August 4, 2021, Public Meeting Between Holtec International and NRC Staff to Discuss Proposed Responses to NRC Requests for Additional Information - Holtec HI-STORE CISF Review ML21215A0852021-08-0303 August 2021 Presentation Slides - August 3, 2021, Public Meeting Between Holtec International and NRC Staff to Discuss Proposed Responses to NRC Requests for Additional Information - Holtec HI-STORE CISF Review ML21214A0792021-08-0202 August 2021 Presentation Slides - August 2, 2021, Partially Closed Meeting Between Holtec International and NRC Staff to Discuss Proposed Responses to NRC Requests for Additional Information - Holtec HI-STORE CISF Review ML21188A0442021-07-0707 July 2021 Consideration of Extreme Environmental Phenomena Short Term During Operations and Transient Loading Events Presentation Slides ML21183A1462021-06-28028 June 2021 Enclosure 2: Publicly Available Presentation ML21105A3702021-04-20020 April 2021 Handout for Pre-Application Meeting with Holtec on HI-STORM FW Amendment No. 7 (April 20, 2021) ML21097A2452021-04-13013 April 2021 Nrc/Nei Workshop Master Slides April 13, 2021 ML21053A0212021-03-10010 March 2021 Presentation Slides Regarding Holtec Draft Moe Topical Report (3-10-2021) ML21035A2862021-02-11011 February 2021 M210211: Slides - Discussion of Nrc'S Regulatory Framework for Dry Cask Storage and Transportation of Spent Nuclear Fuel and Related Research Activities (Holtec) ML20342A0022020-12-0808 December 2020 NRC License Transfer Application Pre-Submittal Meeting ML20063M0152020-03-0303 March 2020 HI-STORM 100 Renewal Presubmittal Meeting (Holtec Slides, 1-15-20) ML19289A0042019-10-17017 October 2019 Presentation Material for 10/17/19 Pre-Submittal Meeting Entergy to Holtec Proposed License Transfer Application ML19009A3432019-01-15015 January 2019 Holtec Slides PSDAR Meeting 1-15-19 ML18291B2302018-10-17017 October 2018 Enclosure 3: Handout - Holtec Presentation on HI-STAR 100 CoC Renewal (Memorandum to M. Layton Summary of Sept. 12, 2018, Meeting with Holtec International, Inc. to Discuss the Upcoming Submittal of the Application for Renewal If the Storag ML18262A1352018-09-25025 September 2018 NRC License Transfer Application 9/25/2018 Pre-Submittal Meeting Presentation Slides 2024-08-26
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
www.holtec.com
HI-STORM FW Amd 10 Pre-submittal Meeting
Non-Proprietar y Session Proposed Changes in Amendment 10
HI-STORM FW Extended Version Higher thermal heat load Thermal Topical Report incorporation Shielding MOE topical report incorporation
www.holtec.com l Pa g e 2 HI-STORM FW Extended Version
New version of the HI-STORM FW Overpack which is designed to minimize the necessary land to store spent fuel Stores the same MPCs as existing HI-STORM FW license No new transfer cask needed Only change is to the overpack The design life of the HI-STORM FW extended configuration is 60 years, which the same as the standard HI-STORM FW system.
Application for 20 year license
www.holtec.com l Pa g e 3 HI-STORM FW Extended Version Structural analyses follow the same methodologies and acceptance criteria previously used in the HI-STORM F W sy s t e m System is bolted to the ISFSI Pad Shielding analysis follows the same methodologies previously used with specific modeling considerations related to the overpack design Thermal analysis uses the same model and acceptance criteria as current FSAR Heat load patterns are identical to current CoC No change in analysis needed for loading since HI -TRAC, MPC, and patterns remain the same
www.holtec.com l Pa g e 4 Higher Thermal Heat Load Patterns
New heat load patterns will be introduced for MPC -
37 and MPC-89 The total heat load is approximately in the range of 60-62 kW The maximum heat load per storage cell in the range of 4.5 -5.0 kW for MPC-37 and 1.7 -2.2 kW for MPC-89
www.holtec.com l Pa g e 5 Incorporation of Thermal Topical Report
Thermal topical report (TR) provides flexibility in heat load patterns The thermal topical report methodology will be incorporated into the CoC and FSAR
www.holtec.com l Pa g e 6 Shielding MOE Topical Report Incorporation
Working on resolving the outstanding questions from public meeting The methodology outlined in that topical report is important to make the thermal approach useful Holtec plans on incorporating that topical report into this amendment Schedules appear that the topical report could be approved well before this HI-STORM FW amendment
www.holtec.com l Pa g e 7 Schedule
After this meeting, will incorporate any NRC feedback Planned submittal for January 2023 Will request a standard 2 year review period
www.holtec.com l Pa g e 8 Thank You
Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104 Tel: (856) 797- 0900 www.holtec.com
www.holtec.com l Pa g e 9