MONTHYEARML22304A0532022-10-31031 October 2022 Request for Renewal of the CoC No. 9168 for the Model No. 8-120B Package/Change in Address Project stage: Request ML22314A1152022-11-17017 November 2022 Enclosure 1 CoC No. 9168, Rev No. 25 Letter to A. Gelfond re-Rev No. 25 of CoC No. 9168 for the Model No. 8-120B Transportation Package Project stage: Other ML22314A1122022-11-17017 November 2022 Revision No. 25 of Certificate of Compliance No. 9168 for the Model No. 8-120B Transportation Package Project stage: Request ML22314A1162022-11-17017 November 2022 Letter to A. Gelfond Re Rev No. 25 of CoC No. 9168 for the Model No. 8-120B Transportation Package Project stage: Other ML22314A1142022-11-17017 November 2022 Enclosure 2 SER for Review of Rev No. 25 of the CoC No. 9168 for the Model No. 8-120B Transportation Package Project stage: Approval 2022-10-31
[Table View] |
|
---|
Category:Letter
MONTHYEARML23191A0502023-07-0505 July 2023 Notification of Use of Radioactive Materials Design Package USA/9168/B(U)-96 ML23026A1272023-01-26026 January 2023 Energysolutions - 10CFR 71.95 Event Report - Docket 71-9168, Certificate of Compliance USA/9168/B(U)-96, 8-120B Transport Package ML22314A1162022-11-17017 November 2022 Letter to A. Gelfond Re Rev No. 25 of CoC No. 9168 for the Model No. 8-120B Transportation Package ML22304A0532022-10-31031 October 2022 Request for Renewal of the CoC No. 9168 for the Model No. 8-120B Package/Change in Address NL-18-0506, Failure to Observe the Certificate of Compliance Condition of the 8-120B Cask Pre-Shipment Leak Test2018-04-16016 April 2018 Failure to Observe the Certificate of Compliance Condition of the 8-120B Cask Pre-Shipment Leak Test ML16028A2952016-01-29029 January 2016 10 CFR 71.95 Notification Associated with the Failure to Observe Certificate of Compliance Condition of the 8-120B Secondary Lid Test Port Configuration PLA-7414, Redacted - Susquehanna, Units 1 and 2 - Submittal of 10 CFR 71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 91682015-11-19019 November 2015 Redacted - Susquehanna, Units 1 and 2 - Submittal of 10 CFR 71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 9168 ML15321A4542015-11-13013 November 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask JAFP-15-0129, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask2015-11-0606 November 2015 Submittal of 10 CFR 71.95 Report Involving 8-120B Cask L-15-299, Submittal of 10 CFR 71.95 Report on the 8-120B Cask2015-11-0202 November 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask NL-15-2010, E.I. Hatch - Submits 10 CFR 71.95 Report on Non-Conformance Involving Radwaste Cask 8-120B2015-11-0202 November 2015 E.I. Hatch - Submits 10 CFR 71.95 Report on Non-Conformance Involving Radwaste Cask 8-120B ML15300A1902015-10-27027 October 2015 Energy Solutions Letter ES-CD-O-2015-006, 10 CFR 71.95 Notification Associated with the Failure to Observe Certificate of Compliance Condition of the 8-120B Secondary Lid Test Port Configuration, Dated September 21,2015 ZS-2015-0156, Zionsolutions, LLC - Submittal of 10 CFR 71.95 Report on the 8-120B Cask2015-10-26026 October 2015 Zionsolutions, LLC - Submittal of 10 CFR 71.95 Report on the 8-120B Cask ML15313A1642015-10-0808 October 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask DCL-15-102, 10 CFR 71.95 Report Regarding Energy Solutions' Model 8-120B Shipping Cask2015-08-24024 August 2015 10 CFR 71.95 Report Regarding Energy Solutions' Model 8-120B Shipping Cask NL-15-1461, Submittal of 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B2015-08-21021 August 2015 Submittal of 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B PLA-7374, Submittal of 10 CFR71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 91682015-08-20020 August 2015 Submittal of 10 CFR71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 9168 ZS-2015-0131, Zionsolutions, LLC - Submittal of10 CFR 71.95 Report on the 8-120B Cask2015-08-18018 August 2015 Zionsolutions, LLC - Submittal of10 CFR 71.95 Report on the 8-120B Cask ML15246A1452015-08-11011 August 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask ML15229A1732015-08-11011 August 2015 CFR71.95 Report - Failure to Observe Certificate of Compliance #9168 Conditions for the 8-120B Cask ZS-2014-0271, Zionsolutions' 10 CFR 71.95 Report of Non-Compliance with Certificate of Compliance No. 9168, Revision No. 20 - Cask 8-120B2014-08-18018 August 2014 Zionsolutions' 10 CFR 71.95 Report of Non-Compliance with Certificate of Compliance No. 9168, Revision No. 20 - Cask 8-120B ML14087A0992013-10-17017 October 2013 10 CFR 71.95 Report - 8-120B Cask Certificate of Compliance Noncompliance Due to an Inadequate Vendor Leak Test Procedure CNL-13-101, 10 CFR 71.95 Report of Non-Compliance with Certificate of Compliance 9168 - Cask 8-120B2013-10-15015 October 2013 10 CFR 71.95 Report of Non-Compliance with Certificate of Compliance #9168 - Cask 8-120B PNP 2013-077, 10 CFR 71.95 Report - 8-120B Cask Certificate of Compliance Noncompliance Due to an Inadequate Vendor Leak Test Procedure2013-10-10010 October 2013 10 CFR 71.95 Report - 8-120B Cask Certificate of Compliance Noncompliance Due to an Inadequate Vendor Leak Test Procedure JAFP-13-0134, 10 CFR 71.95 Report on Failure to Observe Certificate of Compliance Conditions for Radwaste Model 8-120B Cask Vent Port Leak Test Hold Time2013-10-10010 October 2013 10 CFR 71.95 Report on Failure to Observe Certificate of Compliance Conditions for Radwaste Model 8-120B Cask Vent Port Leak Test Hold Time ML13295A3282013-10-0808 October 2013 Attachment 1, Energysolutions Letter CD13-0232 - 10 CFR 71.95 Report on the 8-120B Cask and Attachment 2, List of Shipments from PNPS Using 8-120B Cask ML13295A3272013-10-0808 October 2013 CFR 71.95 Report Issues Involving Radwaste Cask 8-120B L-MT-13-095, Non-Compliance with Energysolutions Model 8-120B Cask Certificate of Compliance2013-10-0404 October 2013 Non-Compliance with Energysolutions Model 8-120B Cask Certificate of Compliance NL-13-133, 10 CFR 71.95 Report on Failure to Observe Certificate of Compliance Conditions for Radwaste Model 8-120B Cask Vent Port Leak Test Hold Time2013-10-0202 October 2013 10 CFR 71.95 Report on Failure to Observe Certificate of Compliance Conditions for Radwaste Model 8-120B Cask Vent Port Leak Test Hold Time DCL-13-094, and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask2013-09-30030 September 2013 and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask GNRO-2013/00077, 10 CFR 71.95 Report on Issues Involving Radwaste Cask 8-120B2013-09-27027 September 2013 10 CFR 71.95 Report on Issues Involving Radwaste Cask 8-120B ML13267A1852013-09-23023 September 2013 Report in Accordance with 10 CFR 71.95 Related to the Pressure Drop Testing of the Energysolutions 8-120B Shipping Cask L-2013-258, 10 CFR 71.95 - Cask 8-120B - 60 Day Report2013-09-16016 September 2013 10 CFR 71.95 - Cask 8-120B - 60 Day Report PLA-7080, Non-Compliance with Model 8-120B Cask Certificate of Compliance No. 91682013-09-0909 September 2013 Non-Compliance with Model 8-120B Cask Certificate of Compliance No. 9168 NL-13-1898, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B2013-08-30030 August 2013 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B ML13273A6912013-08-20020 August 2013 Redacted - Letter from R. Dale Roberts 10 CFR 71.95 Report on the 8-120B Cask ML13247A0362013-08-20020 August 2013 Letter from R. Dale Roberts 10 CFR 71.95 Report on the 8-120B Cask ZS-2012-0215, Zionsolutions, LLC, Request to Register as a User of the CNS 8-120B Radioactive Materials Shipping Cask2012-04-30030 April 2012 Zionsolutions, LLC, Request to Register as a User of the CNS 8-120B Radioactive Materials Shipping Cask ML0906804042009-02-25025 February 2009 Sacramento Municipal Utility District - Request That the NRC Continue QA Program Approval to Allow Continued Use the NRC-Approved Model No. CNS 8-120B Transportation Package ML0731801472007-11-0707 November 2007 11/7/2007 M. Debose, Ltr. User Registration 2023-07-05
[Table view] |
Text
October 31, 2022 ESCD/NRC 2 2-003 Docket No. 71-9168 ATTN: Document Control Desk Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Request for Renewal of the CoC No. 9168 for the Model No. 8-120B Package/Change in address
Reference:
Certificate of Compliance 9168, Docket No. 71-9168, Revision 24.
Dear Director,
EnergySolutions, as the holder of the referenced 8-120B Transportation Package Certificate of Compliance (CoC) No. 9168, which currently expires on December 31, 2022, hereby requests that the CoC be renewed to ensure continued use of the packag ing. It is requested that the renewed CoC is issued to the following company name/a ddress: EnergySolutions, 740 Osborn Road, Barnwell, SC 29812.
EnergySolutions has reviewed the applicable Safety Analysis Report sections on operating procedures, acceptance tests, and maintenance programs and determined that they are complete and accurat e and do not require revision. Therefore, there are no changes to the application cited in the current CoC.
We are requesting renewal of the 8 -120B CoC ahead of the existing CoC expiration date due necessity to update the Certificate of Competent Authority (issued by the US Department of Transportation) along with obtaining endorsement of the 8-120B CoC by Canadian Nuclear Safety Commission (CNSC).
This letter is submitted electronically via the NRC Electronic Information Exchange (EIE) system with an electronic copy to be sent to Mr. Pierre Saverot.
Should you or any member of your staff have questions, please contact me at (803)587-9117.
Sincerely,
Aleksandr Gelfond Director of Engineering/Licensing, Cask Division