Email - Draft Safety Evaluation Associated with Bechtel Quality Assurance Program for Nuclear Power Plants Topical Report, BQ-TOP-1, 2007 Edition, Revision 004
ML22291A466
Person / Time
Site: 99901365
Issue date: 11/08/2022
From: Lois James
Licensing Processes Branch
To: Rezk T
Bechtel Power Corp
Lois James, NRR/DORL/LLPB, 301-415-3306
Shared Package
ML22291A465 List:
References
BQ-TOP-1, BQ-TOP-1, Rev. 4, BQ-TOP-1, Revision 4, EPID: L-2022-TOP-0037
Download: ML22291A466 (2)


Text

From:

Lois James To:

Rezk, Tamer Cc:

RidsNrrOd Resource; RidsNrrLADHarrison Resource; RidsNrrDorlLlpb Resource; RidsACRS_MailCTR Resource; Kerri Kavanagh; Yiu Law; Lois James

Subject:

Draft Safety Evaluation Associated with Bechtel Quality Assurance Program for Nuclear Power Plants Topical Report, BQ-TOP-1, 2007 Edition, Revision 004 (EPID L-2022-TOP-0037)

Date:

Tuesday, November 8, 2022 2:24:00 PM Tamer Rezk Manager of Quality Assurance Bechtel Power Corporation 12011 Sunset Hills Road, Suite 110 Virginia, 20190

Subject:

Draft Safety Evaluation Associated with Bechtel Quality Assurance Program for Nuclear Power Plants Topical Report, BQ-TOP-1, 2007 Edition, Revision 004 (EPIDL-2022-TOP-0037)

Dear Mr. Rezk,

By letter dated June 6, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22158A012), Bechtel Power Corporation (Bechtel) submitted Bechtel Quality Assurance Program for Nuclear Power Plants Topical Report, BQ-TOP-1, 2007 Edition, Revision 004, to the U.S. Nuclear Regulatory Commission (NRC) for review and approval. Bechtel Topical Report BQ-TOP-1, Revision 004, establishes the Quality Assurance Program requirements for work performed by or for Bechtel on nuclear power plants designed and/or constructed in accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants. The NRC staff evaluation is provided in the draft SE.

A copy of the draft SE has been placed in the box.com folder and you have been given access to the folder. The draft SE is being provided for a proprietary information review. If Bechtel provides comments on other areas, the NRC staff will exercise its discretion on whether to address those comments.

Pursuant to 10 CFR 2.390, we have determined that the draft SE may contain proprietary information. If you believe that any information in the draft SE is proprietary, please identify such information line-by-line and define the basis pursuant to the criteria of 10CFR2.390.

Use double brackets and yellow highlight to identify any ((proprietary information)). After 90working days, the draft SE will be made publicly available, if appropriate.

Your response must be via a letter from an authorized individual. In addition, please provide an electronic redline/strikeout Word version of the SE either via email or the box.com folder. It helps expedite the NRC staff response to comments if Bechtel provides in the formal transmittal and in a separate Word file, a table with the following columns: Comment No.,

Page No., and Line No., Comment Type (if comments other than proprietary information are provided (i.e.,clarity, accuracy)), Suggested Revision, and a blank column NRC Disposition.

However, Bechtel may provide its comments in any format it chooses. The final SE will be issued after making any necessary changes.

Note that at this stage of the process, the NRC staff has completed its review of the submitted information and will not entertain technical arguments. The NRC staff conclusions will not

ML22291A465 (pkg) (nonpublic); ML22291A466 (email) (public);

ML22291A467 (draftSE) (nonpublic) *via email NRR-106 OFFICE NRR/DORL/LLPB/PM NRR/DORL/LLPB/LA NRR/DRO/IQVB/BC OGC (NLO on draft SE)

NAME LJames DHarrison KKavanagh*

BAyersman DATE 10/18/2022 10/21/22 10/18/2022 11/07/2022 OFFICE DORL/LLPB/BC (A)

DORL/LLPB/PM

NAME NOtto LJames

DATE 11/07/2022 11/08/2022