ML22287A172

From kanterella
Jump to navigation Jump to search
Applicants' Certification of Initial Mandatory Disclosures
ML22287A172
Person / Time
Site: Palisades, Big Rock Point  File:Consumers Energy icon.png
Issue date: 10/14/2022
From: Leidich A, Doris Lewis, Lovett A, Tompkins J
Balch & Bingham, LLP, Entergy Nuclear Operations, Entergy Nuclear Palisades, Holtec Decommissioning International, Holtec, Pillsbury, Winthrop, Shaw, Pittman, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-155-LT-2, 50-255-LT, 72-007-LT, 72-043-LT-2, ASLBP 22-974-01-LT-BD01, License Transfer, RAS 56474
Download: ML22287A172 (7)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of: Docket Nos. 50-255-LT

) 50-155-LT-2 Entergy Nuclear Operations, Inc., ) 72-007-LT Entergy Nuclear Palisades, LLC, ) 72-043-LT-2 Holtec International, and )

Holtec Decommissioning International, LLC ) ASLBP No. 22-974-01-LT-BD01

)

(Palisades Nuclear Plant and Big Rock Point Site) )

)

CERTIFICATION OF INITIAL MANDATORY DISCLOSURES PURSUANT TO 10 C.F.R. § 2.336 Pursuant to 10 C.F.R. § 2.336 and the scheduling and case management order regarding mandatory disclosures dated August 31, 2022, Entergy Nuclear Operations, Inc., Entergy Nuclear Palisades, LLC, Holtec International, and Holtec Decommissioning International, LLC (Applicants) have made, via email to counsel for the Michigan Attorney General, their initial mandatory disclosures with respect to admitted portions of the Attorney Generals Contention MI-1. Attached are the affidavits required by § 2.336(d) for the Entergy and Holtec parties.

Applicants have been conservative in identifying and producing certain documents in their initial disclosures. By identifying or producing documents in their disclosures, Applicants do not necessarily concede that the documents are in fact relevant or material to the admitted contentions.

Respectfully submitted,

/Executed in accord with § 2.304(d)/ /Signed electronically by Jason Tompkins/

Anne R. Leidich Jason B. Tompkins David R. Lewis Alan D. Lovett PILLSBURY WINTHROP SHAW BALCH & BINGHAM LLP PITTMAN LLP 1710 Sixth Avenue North 1200 Seventeenth Street, NW Birmingham, AL 35203-2015 Washington, DC 20036 (205) 226-8743 Telephone: 202-663-8707 (205) 226-8769 anne.leidich@pillsburylaw.com jtompkins@balch.com david.lewis@pillsburylaw.com alovett@balch.com Counsel for Entergy Nuclear Operations, Counsel for Holtec International and Holtec Inc. and Entergy Nuclear Palisades, LLC Decommissioning International, LLC Dated: October 14, 2022 2

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of: Docket Nos. 50-255-LT

) 50-155-LT-2 Entergy Nuclear Operations, Inc., ) 72-007-LT Entergy Nuclear Palisades, LLC, ) 72-043-LT-2 Holtec International, and )

Holtec Decommissioning International, LLC ) ASLBP No. 22-974-01-LT-BD01

)

(Palisades Nuclear Plant and Big Rock Point Site) )

)

AFFIDAVIT OF JASON DAY CERTIFICATION OF INITIAL DISCLOSURES I, Jason Day, hereby state as follows:

I am General Counsel of Holtec Decommissioning International, LLC (HDI),

representing Holtec International and HDI (collectively Holtec) in this proceeding. My business address is 1 Holtec Boulevard, Camden, NJ 08104. I am authorized to provide this certification, pursuant to 10 C.F.R. § 2.336(c), on behalf of Holtec.

To the best of my knowledge, information and belief, Holtecs initial disclosures in the above-captioned proceeding contain all materials required to be disclosed by 10 C.F.R.

§ 2.336(a), as modified by the Boards Mandatory Disclosures Order,1 that were identified as relevant to the admitted contentions through a search of the information and documentation reasonably available to Holtec.

1 Order (Protocols Governing Mandatory Disclosures) (August 31, 2022).

3

Further, to the best of my knowledge, information, and belief, and based on representations of personnel who were instructed to perform a diligent search, these disclosures are accurate and complete as of this date.

I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information, and belief.

Executed in Accord with 10 C.F.R. 2.304(d)

Jason Day General Counsel Holtec Decommissioning International Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104 Tel. (856) 797-0900 Ext. 3688 Email: j.day@holtec.com Executed in Camden, NJ this 14th day of October, 2022 4

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of: Docket Nos. 50-255-LT

) 50-155-LT-2 Entergy Nuclear Operations, Inc., ) 72-007-LT Entergy Nuclear Palisades, LLC, ) 72-043-LT-2 Holtec International, and )

Holtec Decommissioning International, LLC ) ASLBP No. 22-974-01-LT-BD01

)

(Palisades Nuclear Plant and Big Rock Point Site) )

)

AFFIDAVIT OF SUSAN H. RAIMO CERTIFICATION OF INITIAL DISCLOSURES I, Susan H. Raimo, hereby state as follows:

I am Associate General Counsel with Entergy Services, LLC, representing Entergy Nuclear Palisades, LLC and Entergy Nuclear Operations, Inc. (Entergy) in this proceeding.

My business address is 101 Constitution Ave., NW, Suite 200 East, Washington, D.C. 20001. I am authorized to provide this certification, pursuant to 10 C.F.R. § 2.336(c), on behalf of Entergy.

To the best of my knowledge, information and belief, Entergys initial disclosures in the above-captioned proceeding contain all materials required to be disclosed by 10 C.F.R. § 2.336(a), as modified by the Boards Mandatory Disclosures Order,2 that were identified as relevant to the admitted contentions through a search of the information and documentation reasonably available to Entergy.

2 Order (Protocols Governing Mandatory Disclosures) (August 31, 2022).

5

Further, to the best of my knowledge, information, and belief, and based on representations of personnel who were instructed to perform a diligent search, these disclosures are accurate and complete as of this date.

I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information, and belief.

Executed in Accord with 10 C.F.R. 2.304(d)

Susan H. Raimo, Esq.

Associate General Counsel Entergy Services, LLC 101 Constitution Avenue, N.W., Suite 200 East Washington, D.C. 20001 Tel. 202-530-7330 Email: sraimo@entergy.com Executed in Washington, D.C.

this 14th day of October, 2022 6

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of: Docket Nos. 50-255-LT

) 50-155-LT-2 Entergy Nuclear Operations, Inc., ) 72-007-LT Entergy Nuclear Palisades, LLC, ) 72-043-LT-2 Holtec International, and )

Holtec Decommissioning International, LLC ) ASLBP No. 22-974-01-LT-BD01

)

(Palisades Nuclear Plant and Big Rock Point Site) )

)

CERTIFICATE OF SERVICE I hereby certify that the foregoing Certification of Initial Mandatory Disclosures has been served through the E-filing system on the participants in the above-captioned proceeding, this 14th day of October, 2022.

Respectfully submitted,

/Signed electronically by Jason Tompkins/

Jason B. Tompkins BALCH & BINGHAM LLP 1710 Sixth Avenue North Birmingham, AL 35203-2015 (205) 226-8743 jtompkins@balch.com Dated: October 14, 2022 7