ML22286A119

From kanterella
Jump to navigation Jump to search
SMR, LLC, Submittal of Additional Preapplication Meeting Materials for October 18, 2022
ML22286A119
Person / Time
Site: 99902049
Issue date: 10/13/2022
From: Hawkins J
Holtec, SMR
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML22286A118 List:
References
160-USNRC-025
Download: ML22286A119 (1)


Text

SMR, LLC. A Holtec International Company Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797 -0900 Fax(856)797-0909 October 13, 2022 U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001

Subject:

SMR, LLC Submittal of Additional Preapplication Meeting Materials for October 18, 2022 (Project No. 99902049)

SMR, LLC is pleased to submit documentation for a preapplication meeting regarding the control rod drive system (CRDS) to support the construction permit application for the SMR-160 design on October 18, 2022. contains the proprietary version of the presentation. Enclosure 2 contains the non-proprietary version. SMR, LLC requests that Enclosure 1 be withheld from public disclosure in accordance with 10 CFR 2.390 and an Affidavit is also included with this letter as Enclosure 3.

If you have any questions or require any additional information, please contact Justin Hawkins, SMR-160 Director of Licensing, at j.hawkins@holtec.com, (0) 856-797-0900 x3452, or (C) 609-941-5765.

Respectfully,

~II~

Justin Hawkins Director of Licensing, SMR, LLC

Enclosures:

1. SMR, LLC Meeting Presentation Materials for October 18, 2022 (P)
2. SMR, LLC Meeting Presentation Materials for October 18, 2022
3. Affidavit Pursuant to 10 CFR 2.390 to Withhold Information from Public Disclosure CC:

T. Marcille (SMR, LLC, Vice President of Reactor Technologies)

J. Fleming (Holtec International, LLC, VP of Licensing, Regulatory Affairs & PSA)

R. Trotta (SMR, LLC, Director of SMR-160)

M. Dudek (USNRC, DNRL, NRLB, Branch Chief)

C. Lauran (USNRC, DRNL, NRLB, Senior Project Manager)

D. Murray (USNRC, DRNL, NRLB, Senior Project Manager)

G. Cranston (USNRC, DRNL, NRLB, Senior Project Manager)

Transmittal No. 160-USNRC-025 Page I of I