ML22259A124
| ML22259A124 | |
| Person / Time | |
|---|---|
| Issue date: | 09/08/2022 |
| From: | Kenneth Kolaczyk NRC/NRR/DRO/IRAB |
| To: | |
| Kenneth Kolaczyk, NRR/DRO/IRAB | |
| Shared Package | |
| ML22259A115 | List: |
| References | |
| Download: ML22259A124 (12) | |
Text
Disclaimer slide This training session is being recorded for future use in the NRCs knowledge management program. The recorded contents of the session, including any questions posted by audience members, will be preserved in accordance with the NRCs record management program and are subject to FOIA disclosure. Please refrain from including any sensitive information (i.e., SUNSI) in any questions that you may ask.
Please leave your chat box open to view all questions and answers posed during the session.
1
Agenda RI/SRI 2-Year Detail to NRR/DRO (R2D2)
INPO Interactions
Resident Inspector 2-Year Detail to DRO Program (R2D2)
September 1, 2022 LISA REGNER, NRR/DRO/IOEB
R2D2 What? RI/SRI 2-Year Detail to NRR/DRO Why? Expertise exchange between HQ and regional inspectors Who? RI/SRIs expanding to other inspectors How? Posted on the Inspection Opportunity Portal Contacts? Lisa Regner, Tom Hipschman, Phil McKenna Resident Inspector 2 Year Details to DRO (R2D2) Talking Points
R2D2 Positions 5
Two positions in each of three branches in NRR/DRO:
- Reactor Inspection Branch (IRIB)
- Reactor Assessment Branch (IRAB)
- Generic Communications and Operating Experience Branch (IOEB)
One GG-13 and one GG-14 position in each branch Current availability:
- IRIB: GG-13 and GG-14 positions
- IRAB: GG-14 position
- IOEB: GG-13 position
Staged Requests 6
Stage 4 Broader solicitation of 2-year detail Stage 3 Program office endorsed regional office case-by-case exceptions Stage 2 Identify RIs/SRIs within two years before or after end-of-time at a site Stage 1 Identify RIs/SRIs within one year before or after end-of-time at a site
Questions 7
Institute of Nuclear Power Operations (INPO) Interactions September 1, 2022
INPO/NRC Interactions 9
Complementary relationship - cooperative but independent Dictated by a Memorandum of Agreement MOA provides guidelines for relationship NRC agrees to protect INPOs proprietary, confidential information NRC observations of INPO activities /
INPO observation of NRC activities
- Must be in advance
- Obtain concurrence from the licensee
- For INPO observations by NRC: not on your own plant or in your region
- For NRC observations by INPO: NRR coordinates
References ISA-17 INPO Interactions (IMC 1245 App A)
IMC 0611 Power Reactor Inspection Reports, Sections 13.01, 14.10 IMC 0301 Coordination of NRC Visits INPO Interactions Sharepoint Site OEDO Procedure - Interactions with INPO INPO MOU - ADAMS ML20125A374 INPO Affidavit - ADAMS ML20275A367
Questions 11
12