ML22259A124

From kanterella
Jump to navigation Jump to search
KM Session September 1 2022 Cleankskrev (1)
ML22259A124
Person / Time
Issue date: 09/08/2022
From: Kenneth Kolaczyk
NRC/NRR/DRO/IRAB
To:
Kenneth Kolaczyk, NRR/DRO/IRAB
Shared Package
ML22259A115 List:
References
Download: ML22259A124 (12)


Text

Disclaimer slide This training session is being recorded for future use in the NRCs knowledge management program. The recorded contents of the session, including any questions posted by audience members, will be preserved in accordance with the NRCs record management program and are subject to FOIA disclosure. Please refrain from including any sensitive information (i.e., SUNSI) in any questions that you may ask.

Please leave your chat box open to view all questions and answers posed during the session.

1

Agenda RI/SRI 2-Year Detail to NRR/DRO (R2D2)

INPO Interactions

Resident Inspector 2-Year Detail to DRO Program (R2D2)

September 1, 2022 LISA REGNER, NRR/DRO/IOEB

R2D2 What? RI/SRI 2-Year Detail to NRR/DRO Why? Expertise exchange between HQ and regional inspectors Who? RI/SRIs expanding to other inspectors How? Posted on the Inspection Opportunity Portal Contacts? Lisa Regner, Tom Hipschman, Phil McKenna Resident Inspector 2 Year Details to DRO (R2D2) Talking Points

R2D2 Positions 5

Two positions in each of three branches in NRR/DRO:

  • Reactor Inspection Branch (IRIB)
  • Reactor Assessment Branch (IRAB)
  • Generic Communications and Operating Experience Branch (IOEB)

One GG-13 and one GG-14 position in each branch Current availability:

  • IRIB: GG-13 and GG-14 positions
  • IRAB: GG-14 position
  • IOEB: GG-13 position

Staged Requests 6

Stage 4 Broader solicitation of 2-year detail Stage 3 Program office endorsed regional office case-by-case exceptions Stage 2 Identify RIs/SRIs within two years before or after end-of-time at a site Stage 1 Identify RIs/SRIs within one year before or after end-of-time at a site

Questions 7

Institute of Nuclear Power Operations (INPO) Interactions September 1, 2022

INPO/NRC Interactions 9

Complementary relationship - cooperative but independent Dictated by a Memorandum of Agreement MOA provides guidelines for relationship NRC agrees to protect INPOs proprietary, confidential information NRC observations of INPO activities /

INPO observation of NRC activities

  • Must be in advance
  • Obtain concurrence from the licensee
  • For INPO observations by NRC: not on your own plant or in your region
  • For NRC observations by INPO: NRR coordinates

References ISA-17 INPO Interactions (IMC 1245 App A)

IMC 0611 Power Reactor Inspection Reports, Sections 13.01, 14.10 IMC 0301 Coordination of NRC Visits INPO Interactions Sharepoint Site OEDO Procedure - Interactions with INPO INPO MOU - ADAMS ML20125A374 INPO Affidavit - ADAMS ML20275A367

Questions 11

12