ML22258A313
"Draft Meeting" is not in the list (Request, Draft Request, Supplement, Acceptance Review, Meeting, Withholding Request, Withholding Request Acceptance, RAI, Draft RAI, Draft Response to RAI, ...) of allowed values for the "Project stage" property.
| ML22258A313 | |
| Person / Time | |
|---|---|
| Site: | SHINE Medical Technologies |
| Issue date: | 09/27/2022 |
| From: | Lance Rakovan NRC/NMSS/DREFS/ELRB |
| To: | Tanya Smith NRC/NMSS/DREFS/ELRB |
| Rakovan L | |
| Shared Package | |
| ML22258A318 | List: |
| References | |
| EPID L-2022-NEW-0004 | |
| Download: ML22258A313 (2) | |
Text
MEMORANDUM TO:
Theodore Smith, Chief Environmental Review License Renewal Branch Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards FROM:
Lance Rakovan, Senior Project Manager Environmental Review License Renewal Branch Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards
SUBJECT:
MEETING
SUMMARY
- PUBLIC MEETING TO DISCUSS THE DRAFT ENVIRONMENTAL IMPACT STATEMENT SUPPLEMENT RELATED TO THE OPERATING LICENSE FOR THE SHINE MEDICAL ISOTOPE PRODUCTION FACILITY (EPID NO.: L-2022-NEW-0004)
On July 27, 2022, the U.S. Nuclear Regulatory Commission staff conducted a public meeting to gather comments on the draft supplement to the environmental statement on the construction permit related to the operating license application for the SHINE Medical Isotope Production Facility. Enclosed is the meeting summary. If you have any questions or comments, please contact me via email at Lance.Rakovan@nrc.gov.
Docket No. 50-608
Enclosures:
1.
Meeting Summary 2.
List of Attendees 3.
NRC slide presentation 4.
Meeting transcript cc: w/enclosures:
see next page CONTACT:
Lance J. Rakovan, NMSS/REFS 301-415-2589 September 27, 2022 Signed by Rakovan, Lance on 09/27/22
ML22258A313 OFFICE PM:ELRB:REFS LA:REFS/ERMB BC:ELRB:REFS NE/PM:ELRB:REFS NAME LRakovan AWalker-Smith TSmith LRakovan DATE 09/16/2022 09/19/2022 09/27/2022 09/27/2022