International, HI-STORM FW Amendment 7 Certificate of Compliance Appendix B, Changed Pages
ML22258A256
Person / Time
Site: 07201032
Issue date: 09/15/2022
From:
Holtec
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML22258A250 List:
References
5018097
Download: ML22258A256 (6)


Text

Certificate of Compliance No. 1032 Amendment No. 57 Appendix B iii Table 2.4-1 Polynomial Functions for Minimum Burnup as a Function of Initial Enrichment..2-5441 Table 2.4-2 Burnup Credit Configurations..2-5542 Table 2.4-3 In-Core Operating Requirements.................................................. 2-5643 Table 2.5-1 Burnup and Cooling Time Fuel Qualification Requirements for MPC-32ML............................................................................................. 2-5844 Table 2.5-2 Burnup and Cooling Time Fuel Qualification Requirements for MPC-37 and MPC-89.................................................................................. 2-5845 Table 2.5-3 Burnup and Cooling Time Fuel Qualification Requirements for MPC-37P and MPC-44.............................................................................. 2-59 Table 2.5-4 Alternative Burnup and Cooling Time Fuel Qualification Requirements for MPC-37P..................................................................................... 2-61 Table 2.5-5 Alternative Burnup and Cooling Time Fuel Qualification Requirements for MPC-37

.......................................................................................................... 2-62 Table 2.5-6 Burnup and Cooling Time Fuel Qualification Requirements for Assembly Class 10X10J Loaded According to Table 2.3-2A

.......................................................................................................... 2-63 3.0 DESIGN FEATURES............................................................................................. 3-1 3.1 Site.................................................................................................................... 3-1 3.2 Design Features Important for Criticality Control............................................... 3-1 3.3 Codes and Standards........................................................................................ 3-2 3.4 Site Specific Parameters and Analyses........................................................... 3-11 3.5 Combustible Gas Monitoring During MPC Lid Welding and Cutting................ 3-14 Table 3-1 List of ASME Code Alternatives for Multi-Purpose Canisters (MPCs)..... 3-4 Table 3-2 REFERENCE ASME CODE PARAGRAPHS FOR HI-STORM FW OVERPACK and HI-TRAC VW TRANSFER CASK, PRIMARY LOAD BEARING PARTS................................................................................ 3-10 Holtec Letter 5018097 Attachment 5 Page 1 of 6

Approved Contents 2.0 Certificate of Compliance No.1032 Amendment No. 76 Appendix B 2-57 2.5 Burnup and Cooling Time Qualification Requirements 2.5.1 Burnup and cooling time limits for fuel assemblies authorized for loading into the MPC-32ML are provided in Table 2.5-1. Burnup and cooling time limits for fuel assemblies authorized for loading according to only the alternative loading patterns shown in Figures 2.30-1 through 2.3-9 (MPC-37) and Figures 2.3-10 through 2.3-13 (MPC-89) are provided in Table 2.5-2. Burnup and cooling time combinations in Table 2.5-2 also apply for 10x10J fuel loaded according to heat load regions shown in Tables 2.3-2A, 2.3-2B and 2.3-4.

The burnup and cooling time for every fuel loaded into the MPC-32 ML must satisfy the following equation:

Ct = A Bu3 + BBu2 + C Bu + D

where, Ct

= Minimum cooling time (years)

Bu

= Assembly-average burnup (MWd/mtU)

A,B,C,D =Polynomial coefficients listed in the above tTables 2.5-1 and 2.5-2 Minimum cooling time must also meet limits specified in Table 2.1-1. If the calculated Ct is less than the cooling time limit in Table 2.1-1, the minimum cooling time in Table 2.1-1 is used.

2.5.2 Burnup and cooling time limits for fuel assemblies authorized for loading into the MPC-37P and MPC-44 are provided in Table 2.5-3.

The burnup and cooling time for every fuel assembly loaded into the MPC-37P and MPC-44 must satisfy the following equation:

Ct = A Bu4 + B Bu3 + C Bu2 + D Bu + E

where, Ct

= Minimum cooling time (years),

Bu

= Assembly-average burnup (MWd/mtU),

A, B, C, D, E

= Polynomial coefficients listed in Table 2.5-3.

2.5.3 Alternative burnup and cooling time limits for fuel assemblies authorized for loading into the MPC-37P and MPC-37 are provided in Table 2.5-4 and Table 2.5-5.

2.5.4 Burnup and cooling time limits for Assembly Class 10x10J loaded according to Tables 2.3-2A, 2.3-2B and 2.3-4 are provided in Table 2.5-6.

Holtec Letter 5018097 Attachment 5 Page 2 of 6

Approved Contents 2.0 Certificate of Compliance No.1032 Amendment No. 76 Appendix B 2-58 TABLE 2.5-1 BURNUP AND COOLING TIME FUEL QUALIFICATION REQUIREMENTS FOR MPC-32ML A

B C

D 6.7667E-14

-36736E-09 8.1319E-05 2.7951E+00 TABLE 2.5-2 BURNUP AND COOLING TIME FUEL QUALIFICATION REQUIREMENTS FOR MPC-37 AND MPC-89 Cell Decay Heat Load Limit (kW)

Polynomial Coefficients A

B C

D (Note 1)

MPC-37 0.85 1.68353E-13

-9.65193E-09 2.69692E-04 2.95915E-01 0.85 < decay heat 3.5 1.19409E-14

-1.53990E-09 9.56825E-05

-3.98326E-01 MPC-89 (Note 2) 0.32 1.65723E-13

-9.28339E-09 2.57533E-04 3.25897E-01 0.32 < decay heat 0.5 3.97779E-14

-2.80193E-09 1.36784E-04 3.04895E-01 0.5 < decay heat 0.75 1.44353E-14

-1.21525E-09 8.14851E-05 3.31914E-01 0.75 < decay heat 1.1

-7.45921E-15 1.09091E-09

-1.14219E-05 9.76224E-01 1.1 < decay heat 1.45 3.10800E-15

-7.92541E-11 1.56566E-05 6.47040E-01 1.45 < decay heat 1.6

-8.08081E-15 1.23810E-09

-3.48196E-05 1.11818E+00 NOTES:

1.
1. For BLEU fuel, coefficient D is increased by 1.
2.

For calculation of the minimum cooling time for 10x10J fuel that is loaded in accordance with Table 2.3-2A, 2.3-2B and 2.3-4 or Figures 2.3-10 through 2.3-13, thean assembly-average burnup must be increased by 10,000 MWd/mtU and 5,000 MWd/mtU, respectively.

1.

Holtec Letter 5018097 Attachment 5 Page 3 of 6

Approved Contents 2.0 Certificate of Compliance No.1032 Amendment No. 76 Appendix B 2-60 TABLE 2.5-4 ALTERNATIVE BURNUP AND COOLING TIME FUEL QUALIFICATION REQUIREMENTS FOR THE MPC-37P Cell Location (see Figure 2.1-4)

Maximum

Burnup, MWd/mtU Minimum Cooling Time, Years 2-2, 2-4 through 2-9, 2-11 55000 1.6 60000 3.5 2-1, 2-3, 2-10, 2-12 55000 1.8 60000 3.5 3-4, 3-5, 3-12, 3-13 55000 2

60000 6

3-2, 3-6 through 3-11, 3-15 45000 3.5 50000 5

55000 6

60000 10 3-1, 3-3, 3-14, 3-16 50000 11 1-2, 1-4, 1-5, 1-6, 1-8 15000 3.5 50000 5

55000 10 60000 13 Note: Cell Locations 1-1, 1-3, 1-7 and 1-9 need to remain empty Holtec Letter 5018097 Attachment 5 Page 4 of 6

Approved Contents 2.0 Certificate of Compliance No.1032 Amendment No. 76 Appendix B 2-61 TABLE 2.5-5 ALTERNATIVE BURNUP AND COOLING TIME FUEL QUALIFICATION REQUIREMENTS FOR THE MPC-37 Cell Location (see Figure 2.1-

1)

Maximum

Burnup, MWd/mtU Minimum Cooling Time, Years 1-1 through 1-9 50000 5

55000 6

60000 10 2-1 through 2-12 55000 5

60000 6

3-1 through 3-16 50000 3.5 55000 5

60000 6

Holtec Letter 5018097 Attachment 5 Page 5 of 6

Approved Contents 2.0 Certificate of Compliance No.1032 Amendment No. 76 Appendix B 2-62 TABLE 2.5-6 BURNUP AND COOLING TIME FUEL QUALIFICATION REQUIREMENTS FOR ASSEMBLY CLASS 10X10J LOADED ACCORDING TO TABLE 2.3-2A Region Maximum

Burnup, MWd/mtU Minimum Cooling Time, Years 2

5000 1.2 10000 1.4 20000 2.0 30000 2.4 40000 3.0 50000 3.5 60000 5.0 70000 6.0 1,3 5000 1.8 10000 2.2 20000 2.8 30000 3.5 40000 5.0 50000 7.0 60000 9.0 70000 13.0 Holtec Letter 5018097 Attachment 5 Page 6 of 6