ML22252A258
| ML22252A258 | |
| Person / Time | |
|---|---|
| Site: | Hermes File:Kairos Power icon.png |
| Issue date: | 08/18/2022 |
| From: | Hastings P Kairos Power |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML22252A257 | List: |
| References | |
| KP-NRC-2208-006 | |
| Download: ML22252A258 (1) | |
Text
KP-NRC-2208-006 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 August 18, 2022 Docket No. 50-7513 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Transmittal of Changes to Preliminary Safety Analysis Report Table 4.2-5
References:
- 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), September 29, 2021 (ML21272A376)
- 2. Kairos Power, LLC, Fuel Qualification Methodology for Fluoride Salt-Cooled High Temperature Reactor (KP-FHR), Revision 2, July 5, 2022 (ML22186A213)
In September 2021, Kairos Power submitted a Preliminary Safety Analysis Report (PSAR) (Reference 1) as part of the Construction Permit Application (CPA) for the Hermes non-power reactor. This letter transmits changes to the pages of the PSAR to reflect changes made in the Fuel Qualification Topical Report (Reference 2). Changes to the pages of the PSAR are provided in Enclosure 1. Kairos Power requests NRC review of these changes as part of the continued review of the Hermes CPA.
If you have any questions or need any additional information, please contact James Tomkins at tomkins@kairospower.com or (805)-215-6129, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on August 18, 2022 Sincerely, Peter Hastings, PE Vice President, Regulatory Affairs and Quality
Enclosure:
Changes to PSAR Table 4.2-5 xc (w/enclosure):
William Kennedy, Acting Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, NRR Advanced Reactor Licensing Branch