Kairos Power LLC, Atlas Fuel Fabrication Facility Schedule Update
ML22252A167
Person / Time
Site: 07007034
Issue date: 09/08/2022
From: Hastings P
Kairos Power
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML22252A166 List:
References
KP-NRC-2209-007
Download: ML22252A167 (4)


Text

KP-NRC-2209-007 September 8, 2022 Docket Number: 7007034 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Kairos Power LLC Atlas Fuel Fabrication Facility Schedule Update

References:

1. Letter, Kairos Power LLC to Document Control Desk, Intent to Submit Application for a Fuel Fabrication Facility, October 26, 2021, ML21300A406
2. Letter, Kairos Power LLC to Document Control Desk, Atlas Fuel Fabrication Facility Schedule Input, March 3, 2022, ML22062B673 (Proprietary)

In Reference 1, Kairos Power indicated its intent to apply for a 10 CFR Part 70 possession and use license associated with a Category II fuel fabrication facility expected to be located near the Hermes reactor site in Oak Ridge, Tennessee. The Atlas facility will manufacture TRISO based fuel. In Reference 2, Kairos Power provided updated schedule information in response to a request by the NRC staff for programmatic input.

Additional schedule details are provided in Enclosure 1 to this letter. Consequent to the proprietary details in Enclosure 1, the Atlas facility is not expected to be required to support the Hermes non-power reactor. Kairos Power intends to continue pre-application discussions with the NRC staff, including discussion of the details in Enclosure 1.

Kairos Power requests the information in Enclosure 1 be withheld from public disclosure in its entirety.

An affidavit supporting the withholding request is provided in Enclosure 2.

If you have any questions or need any additional information, please contact James Tomkins at tomkins@kairospower.com or (805) 215-6129, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.

Sincerely, Peter Hastings, PE Vice President, Regulatory Affairs and Quality Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211

KP-NRC-2209-007

Enclosures:

1) Update to Atlas Fuel Fabrication Facility Plans and Schedule (Proprietary)
2) Affidavit Supporting Request for Withholding from Public Disclosure (10 CFR 2.390) xc (w/enclosure):

Jacob Zimmerman, Chief, NMSS Fuel Facility Licensing Branch Thomas Boyce, Acting Branch Chief, NMSS Fuel Facility Licensing Branch Jonathan Rowley, Project Manager, NMSS Fuel Facility Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor and Licensing Branch Tamsen Dozier, Environmental Project Manager, NMSS Environmental Review Branch

KP-NRC-2209-007 Enclosure 2 Kairos Power LLC Affidavit and Request for Withholding from Public Disclosure (10 CFR 2.390)

I, Peter Hastings, hereby state:

1. I am Vice President, Regulatory Affairs and Quality, at Kairos Power LLC (Kairos), and as such I have been authorized by Kairos to review information sought to be withheld from public disclosure in connection with the development, testing, licensing, and deployment of the Kairos reactor and its associated structures, systems, and components, and to apply for its withholding from public disclosure on behalf of Kairos.
2. The information sought to be withheld, in its entirety, is contained in Kairos Enclosure 1 to this letter.
3. I am making this request for withholding, and executing this affidavit in support thereof, pursuant to the provisions of 10 CFR 2.390(b)(1).
4. I have personal knowledge of the criteria and procedures utilized by Kairos in designating information as a trade secret, privileged, or as confidential commercial or financial information.

Some examples of information Kairos considers proprietary and eligible for withholding under

§2.390(a)(4) include:

a. Information which discloses process, method, or apparatus, including supporting data and analyses, where prevention of its use by Kairos competitors without license or contract from Kairos constitutes a competitive economic advantage over other companies in the industry;
b. Information, which if used by a competitor, would reduce his expenditure of resources or improve his competitive position in design, manufacture, shipment, installation, assurance of quality;
c. Information which reveals cost or price information, production capacities, budget levels, or commercial strategies of Kairos, its customers, its partners, or its suppliers;
d. Information which reveals aspects of past, present, or future Kairos or customer funded development plans or programs, of potential commercial value to Kairos;
e. Information which discloses patentable subject matter for which it may be desirable to obtain patent protection; and/or
f. Information obtained through Kairos actions which could reveal additional insights into reactor system development, testing, qualification processes, and/or regulatory proceedings, and which are not otherwise readily obtainable by a competitor.
5. Kairos information contained in Enclosure 1 to this letter contains details of Kairos schedules for a licensing a fuel fabrication facility, including information on commercial arrangements currently

KP-NRC-2209-007 under evaluation by Kairos. These details are commercially sensitive and could provide a competitor with a commercial advantage if the information were to be revealed publicly.

6. Pursuant to the provisions of §2.390(b)(4), the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld:
a. The information sought to be withheld from public disclosure is owned and has been held in confidence by Kairos.
b. The information is of a type customarily held in confidence by Kairos and not customarily disclosed to the public. Kairos has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitute Kairos policy and provide the rational basis required.
c. The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR 2.390, it is to be received in confidence by the Commission.
d. This information is not readily available in public sources.
e. Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Kairos, because it would enhance the ability of competitors to provide similar products and services by reducing their expenditure of resources using similar project methods, equipment, testing approach, contractors, or licensing approaches. This information is the result of considerable expense to Kairos and has great value in that it will assist Kairos in providing products and services to new, expanding markets not currently served by the company.
f. The information could reveal or could be used to infer price information, cost information, budget levels, or commercial strategies of Kairos.
g. Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Kairos of a competitive advantage.
h. Unrestricted disclosure would jeopardize the position of Kairos in the world market, and thereby give a market advantage to the competition in those countries.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on: September 8, 2022 Peter Hastings Vice President, Regulatory Affairs and Quality