September 8 2022 NRC Public Meeting with Steam Generator Task Force - NRC Presentation Final
ML22245A082
Person / Time
Issue date: 09/08/2022
From:
Office of Nuclear Reactor Regulation
To:
Terry L
References
Download: ML22245A082 (9)


Text

NRC Feedback on EPRI Integrity Assessment Guideline Appendix G Implementation NRC Meeting with Industry Steam Generator Task Force (SGTF)

September 8, 2022

Background

  • Technical specifications require a steam generator tube inspection report (SGTIR) be submitted to the NRC
  • Appendix G in Revision 5 of EPRI Steam Generator Integrity Assessment Guideline (IAG) provides a template for the SGTIR

- Plants adopting Technical Specifications Task Force- 577 (TSTF-577)1 shall include the additional information in the template

- For plants not adopting TSTF-577, the IAG recommends considering use of the template 1 Or converting to Revision 5 of Standard Technical Specifications 2

Purpose

  • NRC is receiving SGTIRs based on the IAG Appendix G template
  • NRC staff wanted to highlight some particularly good examples of information provided in recent SGTIR submittals 3

Tubes With Increased Degradation Susceptibility

  • Appendix G highlights multiple sub-populations of tubes as examples:

- Section 1

  • Tube sub-populations with increased degradation susceptibility (e.g., tubes with potential high residual stress (- two sigma), other areas based on growth rates or design features)

- Section 3

  • Periphery tubes in the high-flow region
  • Potential high residual stress tubes
  • Hot-leg dents/dings greater than 5 volts 4

4

Template: 4. The nondestructive examination techniques utilized for each degradation mechanism found, page G-4 5

5

Template: 4. The nondestructive examination techniques utilized for each degradation mechanism found, page G-4 6

6

Well Written Example

- Detailed explanation about the definitions of dents and dings, in both the historical and current use context

- Feed regulating valve disc stack photograph 7

7

Summary

  • Use of IAG Revision 5 Appendix G Template has resulted in more comprehensive SGTIRs
  • This presentation highlighted examples of well written SGTIRs 8

8

Questions 9