ML22243A254
ML22243A254 | |
Person / Time | |
---|---|
Site: | Hermes File:Kairos Power icon.png |
Issue date: | 08/31/2022 |
From: | Hastings P Kairos Power |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML22243A253 | List: |
References | |
KP-NRC-2208-015 | |
Download: ML22243A254 (4) | |
Text
KPNRC2208015 August 31, 2022 Docket No. 507513 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 205550001
Subject:
Kairos Power LLC Transmittal of Response to NRC Question on Salt Spill from Chapters 4 and 13 Audit on Hermes Preliminary Safety Analysis Report
References:
- 1. Audit Plan, Nuclear Regulatory Commission, Plan for an Audit of the Hermes Construction Permit Preliminary Safety Analysis Report Chapters 4 and 13, February 23, 2022 (ML22041B665)
This letter transmits a response to NRC question on salt spills provided as part of the Chapters 4 and 13 audit (Reference 1) on the Kairos Power Hermes Test Reactor Preliminary Safety Analysis Report. Kairos Power requests NRC review of the response in support of continued review of the Hermes nonpower test reactor construction permit application.
The attached response is considered proprietary, and Kairos Power requests it be withheld from public disclosure in its entirety in accordance with the provisions of 10 CFR 2.390. Enclosure 1 provides the proprietary response. An affidavit supporting the withholding request is provided in Enclosure 2.
Additionally, the information indicated as proprietary has also been determined to contain Export Controlled Information. This information must be protected from disclosure pursuant to the requirements of 10 CFR 810.
If you have any questions or need any additional information, please contact Delaney Simmons at simmons@kairospower.com or at (605) 8385132, or Darrell Gardner at gardner@kairospower.com or (704) 7691226.
Peter Hastings, PE Vice President, Regulatory Affairs and Quality Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211
KPNRC2208015 Page 2
Enclosures:
- 1) Kairos Power Response to NRC Question on Salt Spills (Proprietary)
- 2) Kairos Power LLC Affidavit and Request for Withholding from Public Disclosure (10 CFR 2.390) xc (w/enclosure):
William Kennedy, Acting Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch
KPNRC2208015 Enclosure 2 Kairos Power LLC Affidavit and Request for Withholding from Public Disclosure (10 CFR 2.390)
I, Darrell Gardner, hereby state:
- 1. I am Senior Director, Licensing, at Kairos Power LLC (Kairos), and as such I have been authorized by Kairos to review information sought to be withheld from public disclosure in connection with the development, testing, licensing, and deployment of the Kairos reactor and its associated structures, systems, and components, and to apply for its withholding from public disclosure on behalf of Kairos.
- 2. The information sought to be withheld, in its entirety, is contained in Kairos Enclosure 1 to this letter.
- 3. I am making this request for withholding, and executing this affidavit in support thereof, pursuant to the provisions of 10 CFR 2.390(b)(1).
- 4. I have personal knowledge of the criteria and procedures utilized by Kairos in designating information as a trade secret, privileged, or as confidential commercial or financial information.
Some examples of information Kairos considers proprietary and eligible for withholding under
§2.390(a)(4) include:
- a. Information which discloses process, method, or apparatus, including supporting data and analyses, where prevention of its use by Kairos competitors without license or contract from Kairos constitutes a competitive economic advantage over other companies in the industry;
- b. Information, which if used by a competitor, would reduce his expenditure of resources or improve his competitive position in design, manufacture, shipment, installation, assurance of quality;
- c. Information which reveals cost or price information, production capacities, budget levels, or commercial strategies of Kairos, its customers, its partners, or its suppliers;
- d. Information which reveals aspects of past, present, or future Kairos or customer funded development plans or programs, of potential commercial value to Kairos;
- e. Information which discloses patentable subject matter for which it may be desirable to obtain patent protection; and/or
- f. Information obtained through Kairos actions which could reveal additional insights into reactor system development, testing, qualification processes, and/or regulatory proceedings, and which are not otherwise readily obtainable by a competitor.
- 5. Kairos information contained in Enclosure 1 to this letter contains details of Kairos salt spill analysis methodology for a Kairos Power fluoride saltcooled hightemperature reactor. These details could provide a competitor with a commercial advantage if the information were to be revealed publicly.
- 6. Pursuant to the provisions of §2.390(b)(4), the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld:
- a. The information sought to be withheld from public disclosure is owned and has been held in confidence by Kairos.
KPNRC2208015
- b. The information is of a type customarily held in confidence by Kairos and not customarily disclosed to the public. Kairos has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitute Kairos policy and provide the rational basis required.
- c. The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR 2.390, it is to be received in confidence by the Commission.
- d. This information is not readily available in public sources.
- e. Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Kairos, because it would enhance the ability of competitors to provide similar products and services by reducing their expenditure of resources using similar project methods, equipment, testing approach, contractors, or licensing approaches. This information is the result of considerable expense to Kairos and has great value in that it will assist Kairos in providing products and services to new, expanding markets not currently served by the company.
- f. The information could reveal or could be used to infer price information, cost information, budget levels, or commercial strategies of Kairos.
- g. Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Kairos of a competitive advantage.
- h. Unrestricted disclosure would jeopardize the position of Kairos in the world market, and thereby give a market advantage to the competition in those countries.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on: August 31, 2022 Darrell Gardner Senior Director, Licensing