ML22243A137
| ML22243A137 | |
| Person / Time | |
|---|---|
| Site: | Hermes File:Kairos Power icon.png |
| Issue date: | 08/30/2022 |
| From: | Hastings P Kairos Power |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML22243A136 | List: |
| References | |
| KP‐NRC‐2208‐013 | |
| Download: ML22243A137 (4) | |
Text
KPNRC2208013
KairosPowerLLC
www.kairospower.com 707WTowerAve,SuiteA 5201HawkingDrSE,UnitA 2115RexfordRd,Suite325 Alameda,CA94501 Albuquerque,NM87106 Charlotte,NC28211
August30,2022 DocketNo.507513
USNuclearRegulatoryCommission ATTN:DocumentControlDesk Washington,DC205550001
Subject:
KairosPowerLLC
TransmittalofChangestoKPFHRCoreDesignandAnalysisMethodologyTechnical Report,KPTR017P
References:
- 1. Letter,KairosPowerLLCtoDocumentControlDesk,SubmittalofthePreliminary SafetyAnalysisReportfortheKairosPowerFluorideSaltCooled,HighTemperature NonPowerReactor(Hermes),September29,2021(ML21272A376)
- 2. AuditPlan,NuclearRegulatoryCommission,KairosPower,LLC-PlanforanAuditof TheHermesConstructionPermitPreliminarySafetyAnalysisReportChapters4and 13,February23,2022(ML22041B665)
InSeptember2021,KairosPowersubmittedaPreliminarySafetyAnalysisReport(PSAR)(Reference1)as partoftheConstructionPermitApplication(CPA)fortheHermesnonpowerreactor.Thissubmittalalso includedaCoreDesignandAnalysisMethodologyTechnicalReport(KPTR017P).Thislettertransmits changestotheCoreDesignandAnalysisMethodologyTechnicalReporttoaddressNRCfeedback receivedaspartoftheChapter4and13audit(Reference2).
Portionsofthetechnicalreportareconsideredproprietary,andKairosPowerrequeststhoseportionsbe withheldfrompublicdisclosureintheirentiretyinaccordancewiththeprovisionsof10CFR2.390. providesthechangestotheproprietaryportionsofthetechnicalreportandEnclosure2 providesthechangestothenonproprietaryportionsofthetechnicalreport.Anaffidavitsupportingthe withholdingrequestisprovidedinEnclosure3.KairosPowerrequestsNRCreviewofthesechangesas partofthecontinuedreviewoftheHermesCPA.
Additionally,theinformationindicatedasproprietaryhasalsobeendeterminedtocontainExport ControlledInformation.Thisinformationmustbeprotectedfromdisclosurepursuanttothe requirementsof10CFR810.
Ifyouhaveanyquestionsorneedanyadditionalinformation,pleasecontactJamesTomkinsat tomkins@kairospower.comor(805)2156129orDarrellGardneratgardner@kairospower.comor (704)7691226.
KPNRC2208013 Page2
Ideclareunderpenaltyofperjurythattheforegoingistrueandcorrect.
ExecutedonAugust30,2022
Sincerely,
PeterHastings,PE VicePresident,RegulatoryAffairsandQuality
Enclosures:
1.ChangestoProprietaryPortionsofKPTR017P,Revision0(Proprietary) 2.ChangestoNonProprietaryPortionsofKPTR017P,Revision0(Nonproprietary) 3.KairosPowerLLCAffidavitandRequestforWithholdingfromPublicDisclosure(10 CFR2.390)
xc(w/enclosure):
WilliamKennedy,ActingChief,NRRAdvancedReactorLicensingBranch BenjaminBeasley,ProjectManager,NRRAdvancedReactorLicensingBranch EdwardHelvenston,ProjectManager,NRRAdvancedReactorLicensingBranch SamuelCuadradodeJesus,ProjectManager,NRRAdvancedReactorLicensingBranch
KPNRC2208013
KairosPowerLLCAffidavitandRequestfor WithholdingfromPublicDisclosure(10CFR2.390)
I,DarrellGardner,herebystate:
- 1.
IamSeniorDirector,Licensing,atKairosPowerLLC(Kairos),andassuchIhavebeenauthorized byKairostoreviewinformationsoughttobewithheldfrompublicdisclosureinconnectionwith thedevelopment,testing,licensing,anddeploymentoftheKairosreactoranditsassociated structures,systems,andcomponents,andtoapplyforitswithholdingfrompublicdisclosureon behalfofKairos.
- 2.
Theinformationsoughttobewithheld,initsentirety,iscontainedinKairosEnclosure1tothis letter.
- 3.
Iammakingthisrequestforwithholding,andexecutingthisaffidavitinsupportthereof,pursuant totheprovisionsof10CFR2.390(b)(1).
- 4.
IhavepersonalknowledgeofthecriteriaandproceduresutilizedbyKairosindesignating informationasatradesecret,privileged,orasconfidentialcommercialorfinancialinformation.
SomeexamplesofinformationKairosconsidersproprietaryandeligibleforwithholdingunder
§2.390(a)(4)include:
- a.
Informationwhichdisclosesprocess,method,orapparatus,includingsupportingdataand analyses,wherepreventionofitsusebyKairoscompetitorswithoutlicenseorcontractfrom Kairosconstitutesacompetitiveeconomicadvantageoverothercompaniesintheindustry;
- b.
Information,whichifusedbyacompetitor,wouldreducehisexpenditureofresourcesor improvehiscompetitivepositionindesign,manufacture,shipment,installation,assuranceof quality;
- c.
Informationwhichrevealscostorpriceinformation,productioncapacities,budgetlevels,or commercialstrategiesofKairos,itscustomers,itspartners,oritssuppliers;
- d.
Informationwhichrevealsaspectsofpast,present,orfutureKairosorcustomerfunded developmentplansorprograms,ofpotentialcommercialvaluetoKairos;
- e.
Informationwhichdisclosespatentablesubjectmatterforwhichitmaybedesirableto obtainpatentprotection;and/or
- f.
InformationobtainedthroughKairosactionswhichcouldrevealadditionalinsightsinto reactorsystemdevelopment,testing,qualificationprocesses,and/orregulatoryproceedings, andwhicharenototherwisereadilyobtainablebyacompetitor.
- 5.
KairosinformationcontainedinEnclosure1tothislettercontainsdetailsofKairoscoredesign analysismethodologyforaKairosPowerfluoridesaltcooledhightemperaturereactor.These detailscouldprovideacompetitorwithacommercialadvantageiftheinformationweretobe revealedpublicly.
KPNRC2208013
- 6.
Pursuanttotheprovisionsof§2.390(b)(4),thefollowingisfurnishedforconsiderationbythe Commissionindeterminingwhethertheinformationsoughttobewithheldfrompublicdisclosure shouldbewithheld:
- a.
Theinformationsoughttobewithheldfrompublicdisclosureisownedandhasbeenheldin confidencebyKairos.
- b.
TheinformationisofatypecustomarilyheldinconfidencebyKairosandnotcustomarily disclosedtothepublic.Kairoshasarationalbasisfordeterminingthetypesofinformation customarilyheldinconfidencebyitand,inthatconnection,utilizesasystemtodetermine whenandwhethertoholdcertaintypesofinformationinconfidence.Theapplicationofthat systemandthesubstanceofthatsystemconstituteKairospolicyandprovidetherational basisrequired.
- c.
TheinformationisbeingtransmittedtotheCommissioninconfidenceand,underthe provisionsof10CFR2.390,itistobereceivedinconfidencebytheCommission.
- d.
Thisinformationisnotreadilyavailableinpublicsources.
- e.
Publicdisclosureofthisproprietaryinformationislikelytocausesubstantialharmtothe competitivepositionofKairos,becauseitwouldenhancetheabilityofcompetitorsto providesimilarproductsandservicesbyreducingtheirexpenditureofresourcesusingsimilar projectmethods,equipment,testingapproach,contractors,orlicensingapproaches.This informationistheresultofconsiderableexpensetoKairosandhasgreatvalueinthatitwill assistKairosinprovidingproductsandservicestonew,expandingmarketsnotcurrently servedbythecompany.
- f.
Theinformationcouldrevealorcouldbeusedtoinferpriceinformation,costinformation, budgetlevels,orcommercialstrategiesofKairos.
- g.
Eachcomponentofproprietaryinformationpertinenttoaparticularcompetitiveadvantage ispotentiallyasvaluableasthetotalcompetitiveadvantage.Ifcompetitorsacquire componentsofproprietaryinformation,anyonecomponentmaybethekeytotheentire puzzle,therebydeprivingKairosofacompetitiveadvantage.
- h.
UnrestricteddisclosurewouldjeopardizethepositionofKairosintheworldmarket,and therebygiveamarketadvantagetothecompetitioninthosecountries.
Ideclareunderpenaltyofperjurythattheforegoingistrueandcorrect.
Executedon:August30,2022
DarrellGardner SeniorDirector,Licensing