ML22242A017

From kanterella
Jump to navigation Jump to search
GEH Morris Operation Preamble-Order for Subsequent Renewed License SNM-2500
ML22242A017
Person / Time
Site: 07200001
Issue date: 11/22/2022
From: Yoira Diaz-Sanabria
Storage and Transportation Licensing Branch
To:
GE Hitachi Nuclear Energy
K BANOVAC NMSS/DFM/STLB 3014157116
Shared Package
ML22234A256 List:
References
Download: ML22242A017 (3)


Text

GE-HITACHI NUCLEAR ENERGY AMERICAS, LLC DOCKET NO. 72-1 MORRIS OPERATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION SUBSEQUENT RENEWED MATERIALS LICENSE NO. SNM-2500 Subsequent Renewed License No. SNM-2500

1. The U.S. Nuclear Regulatory Commission (Commission), having previously made the findings set forth in License No. SNM-2500 issued on May 4, 1982, and renewed on December 21, 2004, has now found that:

A. The application to subsequently renew License No. SNM-2500 filed by GE-Hitachi Nuclear Energy Americas, LLC complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in Chapter 1 of Title 10 of the Code of Federal Regulations (10 CFR);

B. Actions have been identified and have been or will be taken for (i) managing the effects of aging during the period of extended operation that could adversely affect structures, systems, and components important to safety, and (ii) evaluation of time-limited aging analyses, such that there is reasonable assurance that the activities authorized by the subsequent renewed license will continue to be conducted in accordance with the current licensing bases; C. There is reasonable assurance that (i) the activities authorized by this subsequent renewed license can be conducted without endangering the health and safety of the public, and (ii) such activities will be conducted in compliance with the Commission's regulations; D. The subsequent renewal of this license will not be inimical to the common defense and security; and E. After weighing the environmental, economical, technical, and other benefits of the facility against environmental and other costs, and considering available alternatives, the subsequent renewal of this license is in accordance with 10 CFR Part 51 and 10 CFR Part 72 and all applicable requirements have been satisfied.

2

2. This subsequent renewed license is effective as of the date of its issuance and shall expire at midnight on May 31, 2042.

FOR THE U.S. NUCLEAR REGULATORY COMMISSION Signed by Diaz-Sanabria, Yoira on 11/22/22 Yoira K. Diaz-Sanabria, Chief Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards

Enclosure:

Subsequent Renewed License Date of Issuance:

November 22, 2022

ML22234A256; ML22242A017 OFFICE NMSS/DFM/STLB NMSS/DFM/MSB NMSS/REFS/FAB NMSS/DFM/IOB NAME KBanovac KB JWise JW MHenderson MH MLearn ML DATE Aug 23, 2022 Sep 1, 2022 Sep 1, 2022 Aug 23, 2022 OFFICE NMSS/DFM/STLB OEDO NMSS/REFS/FAB NRR/DEX/ESEB NAME KBanovac KB ARivera-Varona AR FMiller FM JColaccino JC DATE Sep 2, 2022 Sep 19, 2022 Sep 8, 2022 Sep 15, 2022 OGC/GCRPS OFFICE NMSS/DFM/STLB NMSS/DFM/STLB

/HLWFCNS/NLO NAME WWheatley WW ACoggins AC YDiaz-Sanabria YD DATE Sep 20, 2022 Nov 8, 2022 Nov 22, 2022