ML22241A087

From kanterella
Jump to navigation Jump to search
Cover Letter
ML22241A087
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/30/2022
From: Clark J
Security Performance Evaluation Branch
To: Dean S
Southern Nuclear Operating Co
Shared Package
ML22241A088 List:
References
IR 2022420
Download: ML22241A087 (3)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION August 30, 2022 Mr. Sonny Dean Site Vice President Southern Nuclear Operating Co., Inc.

Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT UNIT 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000424/2022420 AND 05000425/2022420

Dear Mr. Dean:

On August 12, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant Unit 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low security significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Vogtle Electric Generating Plant Unit 1 and 2.

The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: [H.9] - Training.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Vogtle Electric Generating Plant Unit 1 and 2.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION S. Dean 2 accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, Signed by Clark, Jefferson on 08/30/22 Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81

Enclosure:

As stated cc w/o encl: Distribution via LISTSERV cc: Charles Workman, Site Security Manager clworkma@southernco.com OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

ML22241A088; ML22241A087 NSIR/DSO/SPEB NSIR/DSO/SPEB NSIR/DSO/SPEB OFFICE R-II/DRS/PSB

/ETB /ETB /ETA NAME PCoughlin PC JBerry JB RPatterson RP JClark JC DATE Aug 29, 2022 Aug 29, 2022 Aug 30, 2022 Aug 30, 2022