ML22237A325

From kanterella
Jump to navigation Jump to search
Kairos Power LLC, Transmittal of Changes to Preliminary Safety Analysis Report Chapters 3, 4, 5, 9 and 14
ML22237A325
Person / Time
Site: Hermes
Issue date: 08/25/2022
From: Hastings P
Kairos Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML22237A324 List:
References
KP‐NRC‐2208‐010
Download: ML22237A325 (2)


Text

KPNRC2208010 August 25, 2022 Docket No. 507513 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 205550001

Subject:

Kairos Power LLC Transmittal of Changes to Preliminary Safety Analysis Report Chapters 3, 4, 5, 9 and 14

References:

1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride SaltCooled, High Temperature NonPower Reactor (Hermes), September 29, 2021 (ML21272A376)
2. Audit Plan, Nuclear Regulatory Commission, Kairos Power, LLC - Plan for a General Audit of The Hermes Constructure Permit Application, February 10, 2022 (ML22039A336)

In September 2021, Kairos Power submitted a Preliminary Safety Analysis Report (PSAR) (Reference 1) as part of the Construction Permit Application (CPA) for the Hermes nonpower reactor. This letter transmits changes to the pages of the PSAR to address NRC feedback received on Chapters 4 and 5 in the PSAR General Audit (Reference 2). Changes to the pages of the PSAR are provided in Enclosure 1.

Kairos Power requests NRC review of these changes as part of the continued review of the Hermes CPA.

If you have any questions or need any additional information, please contact Nicole Schlichting at schlichting@kairospower.com or (980) 2159252 or Darrell Gardner at gardner@kairospower.com or (704) 7691226.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on August 25, 2022 Sincerely, Peter Hastings, PE Vice President, Regulatory Affairs and Quality

Enclosures:

Changes to PSAR Chapters 3, 4, 5, 9 and 14 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211

KPNRC2208010 Page 2 xc (w/enclosure):

William Kennedy, Acting Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch