ML22236A518

From kanterella
Jump to navigation Jump to search
8-23-22 Memo Transmitting the Public Meeting Summary to Discuss Topical Report TR-121172, Revision 0, Carbon Free Power Project Nuclear Quality Assurance Program Description
ML22236A518
Person / Time
Issue date: 08/30/2022
From: Carolyn Lauron
NRC/NRR/DNRL/NRLB
To: Michael Dudek
NRC/NRR/DNRL/NRLB
Carolyn Lauron-NRR/DNRL/NRLB 3014152736
Shared Package
ML22236A512 List:
References
Download: ML22236A518 (5)


Text

August 30, 2022 MEMORANDUM TO: Michael I. Dudek, Chief New Reactor Licensing Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation FROM: Carolyn Lauron, Sr. Project Manager /RA/

New Reactor Licensing Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation

SUBJECT:

U.S. NUCLEAR REGULATORY COMMISSION

SUMMARY

OF THE AUGUST 23, 2022, OBSERVATION PUBLIC MEETING TO DISCUSS TOPICAL REPORT TR-121172, REVISION 0, CARBON FREE POWER PROJECT NUCLEAR QUALITY ASSURANCE PROGRAM DESCRIPTION, REVISION 002 The U.S. Nuclear Regulatory Commission (NRC) held an observation public meeting on August 23, 2022, to discuss the NuScale Power, LLC (NuScale), submittal of Topical Report (TR)-121172, Revision 0, Carbon Free Power Project (CFPP) Nuclear Quality Assurance Program Description, Revision 002, on behalf of CFPP, LLC. The purpose of the meeting was to obtain clarifying information regarding the TR submitted on July 26, 2022.1 This virtual meeting had attendees from the NRC, NuScale, CFPP, and CFPP contractors.

No members of the public participated in the meeting.

CONTACT: Carolyn Lauron, NRR/DNRL 301-415-2736 1

NuScale Power, LLC, Submittal of Topical Report TR-121172, Revision 0, on behalf of CFPP, LLC for Carbon Free Power Project (CFPP) Nuclear Quality Assurance Program Description, Revision 002, dated July 26, 2022. Agencywide Document Access and Management System (ADAMS) Accession No. ML22207A859.

M. Dudek 2 The NRC issued the public meeting notice on August 12, 2022, and posted it on the NRC public website.2 There were no presentation slides for the meeting.

Enclosed are the meeting agenda (Enclosure 1), list of participants for the meeting (Enclosure 2), and a summary of the meeting (Enclosure 3).

Docket No. 99902052

Enclosures:

1. Meeting Agenda
2. List of Attendees
3. Summary of Meeting 2

U.S. NRC, 8/23/2022 Notice of Preapplication Meeting with NuScale Power, LLC, regarding the Topical Report on the Carbon Free Power Project (CFPP) Limited Scope Quality Assurance Program Description in support of the CFPP Combined License Application, dated August 12, 2022. (ML22228A079.)

PKG: ML22236A512 Memo: ML22236A518 : ML22236A520, Enclosure 2: ML22236A519, Enclosure 3: ML22236A566

  • via email NRR-106 OFFICE NRR/DNRL/NRLB NRR/DNRL/NRLB NRR/DRO/IQVB NRR/DNRL/NRLB NAME CLauron SGreen KKavanagh* OTabatabai DATE 08/23/2022 08/24/2022 08/29/2022 08/29/2022 OFFICE NRR/DNRL/NRLB NAME CLauron DATE 08/29/2022 Carbon Free Power Project Preapplication Mailing List (Revised 08/17/2022) cc:

Mason Baker Chief Legal Officer and General Counsel, UAMPS 155 North 400 West, Suite 480 Salt Lake City, UT 84103 Matthew Featherston COLA Licensing Lead, Fluor 100 Fluor Daniel Drive, Center 1 Greenville, SC 29607 Mr. Scott Head Regulatory Affairs Manager, CFPP, LLC 155 North 400 West, Suite 480 Salt Lake City, UT 84103 Shawn Hughes Project Director, CFPP, LLC 155 North 400 West, Suite 480 Salt Lake City, UT 84103 Glenn J. Neises Nuclear Director, Burns & McDonnell 9400 Ward Parkway Kansas City, MO 64114 John Volkoff NuScale Power, LLC Carbon Free Power Project 155 North 400 West, Suite 480 Salt Lake City, UT 84103 Eric Woods COLA Project Manager, Fluor 1 Fluor Daniel Drive Sugar Land, TX 77478 Page 1 of 2

Carbon Free Power Project Preapplication Mailing List Email eric.woods@fluorgov.com (Eric Woods) gneises@burnsmcd.com (Glenn J. Neises) jvolkoff@nuscalepower.com (John Volkoff) kperkins@nuscalepower.com (Kyra Perkins)

LicensingCFPP@nuscalepower.com (CFPP Licensing mailbox for all correspondence) mason@uamps.com (Mason Baker)

Matthew.Featherston@fluorgov.com (Matthew Featherson) sbaughn@nuscalepower.com (Susan Baugh) scott.head@cfppllc.com (Scott Head) shawn@cfppllc.com (Shawn Hughes) tcohen@nuscalepower.com (Tamela Cohen)

Page 2 of 2