ML22231B230

From kanterella
Jump to navigation Jump to search
Kairos Power LLC, Reponses to NRC Requests for Confirmation of Information Hermes Preliminary Safety Analysis Report, Section 9.1
ML22231B230
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 08/19/2022
From:
Kairos Power
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22231B228 List:
References
KP-NRC-2208-007
Download: ML22231B230 (3)


Text

KP-NRC-2208- 007

Enclosure 1 Response to PSAR 9.1 RCI (Non-Proprietary)

KairosPowerHermesTestReactor PreliminarySafetyAnalysisReport ResponsestoRequestsforConfirmatoryInformation

ChemistryControlSystem

RCI01

KPFHRPDC70,"Reactorcoolantpuritycontrol,"requiresthesystemtomaintainthepurityofthereactor coolantwithinspecifieddesignlimits.

InordertodemonstratehowthedesignbasesforthechemistrycontrolsystemsatisfyPDC70,confirm thefollowinginformationforSection9.1.1:

WillinformationintheFSARshowtheselectedlocation(s)forcoolantchemistrysamplingtobeawell mixed,representativesampleofthecoolant?

KairosPowerResponse:

Yes,informationprovidedwiththeapplicationforanoperatinglicensewillshowtheselectedlocation(s) forcoolantchemistrysamplingtobewellmixed,representativesamplesofthecoolant.

InertGasSystem

RCI02

KPFHRPDC70,"Reactorcoolantpuritycontrol,"requiresthatcoolantpuritylimitsbebasedon considerationofairormoistureingressduetoacovergasleak.

Inordertodemonstratehowthedesignbasesfortheinertgassystem(IGS)satisfyPDC70,confirmthe followinginformationforSection9.1.2:

WilltheIGSbecapableofmeasuringbothairandmoisturecontentofthecovergas?

KairosPowerResponse:

Yes,theIGSwillbecapableofmeasuringboththeairandmoisturecontentofthecovergas.

1of2 RCI03

KPFHRPDC70,"Reactorcoolantpuritycontrol,"requiresthatcoolantpuritylimitsbebasedon considerationofairormoistureingressduetoacovergasleak.

Inordertodemonstratehowthedesignbasesfortheinertgassystem(IGS)satisfyPDC70,confirmthe followinginformationforSection9.1.2:

CantheentiretyoftheIGSbeperiodicallycheckedforleakage?

KairosPowerResponse:

Yes,theentiretyoftheIGScanbeperiodicallycheckedforleakage.

RCI04

InordertoclarifythedesignbasesoftheIGS,confirmthefollowinginformationforSection9.1.2:

IstheIGSneededtocontrolthe'hotcell'temperaturestatedinChapter13,TableA51,"KeyInput ParametersforPebbleHandlingandStorageSystemMalfunctionEvent?"

KairosPowerResponse:

No,theIGSisnotneededtocontrolthehotcelltemperaturereferencedintheanalysisofthePHSS MalfunctionEvent.

2of2