ML22229A095

From kanterella
Jump to navigation Jump to search
Biennial 10 CFR 50.59 and 10 CFR 72.48 Summary Reports
ML22229A095
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 08/17/2022
From: Fleming J
Holtec Decommissioning International
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
HDI-IPEC-22-060
Download: ML22229A095 (1)


Text

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-IPEC-22-060 10 CFR 50.59 (d)(2) 10 CFR 72.48 (d)(2)

August 17, 2022 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Indian Point Energy Center Facility License No. DPR-05, DPR-26 and DPR-64 NRC Docket Nos. 50-03, 50-247, and 50-286

Subject:

Biennial 10 CFR 50.59 and 10 CFR 72.48 Summary Reports As required by 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2), Holtec Decommissioning International, LLC (HDI) provides the following summary report of completed changes, tests, and experiments at the Indian Point Energy Center (IPEC) for the period of April 30, 2020 to May 1, 2022.

There were no 10 CFR 50.59 evaluations completed during the reporting period.

There were no 10 CFR 72.48 evaluations completed during the reporting period.

This letter contains no new regulatory commitments.

If you have any questions or need further information, please contact Mr. Walter Wittich, IPEC Licensing at 914-254-7212, or me at (856) 797-0900, ext. 3578.

Sincerely, Jean A. Fleming Vice President, Licensing, Regulatory Affairs and PSA Holtec Decommissioning International, LLC cc:

NRC Senior Project Manager, NRC NMSS NRC Region l Regional Administrator NRC Senior Regional Inspector, Indian Point Energy Center New York State Liaison Officer Designee, NYSERDA New York State (NYS) Public Service Commission Jean A. Fleming Digitally signed by Jean A.

Fleming Date: 2022.08.17 09:10:13 -04'00'