ML22216A210
From kanterella
Jump to navigation
Jump to search
Letter Sequence Other | |
---|---|
EPID:L-2022-LRO-0059, (Open) | |
Initiation
Administration Questions
Results
Other: ML22216A204, ML22216A210, ML22216A216, ML22216A218, ML22216A221, ML22216A223 | |
MONTHYEARML22216A2231990-09-0101 September 1990
[Table View]2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 5 of 5_Redacted Project stage: Other ML22216A2182005-01-0101 January 2005 2 to Updated Safety Analysis Report, Appendix D, TMI-2 Requirements _Redacted Project stage: Other ML22216A2102009-01-0101 January 2009 2 to Updated Safety Analysis Report Chapter 6, Engineered Safety Features_Redacted Project stage: Other ML22216A2162011-01-0101 January 2011 2 to Updated Safety Analysis Report, App. F, Fire Prot. Safe Shutdown Analysis_Redacted Project stage: Other ML22216A2042014-01-0101 January 2014 Updated Safety Analysis Report (Usar), Revision 22, Chapter 15, Accident Analyses_Redacted Project stage: Other ML22216A2212022-05-19019 May 2022 2 to Updated Safety Analysis Report, Appendix E, Figures Part 1 of 2_Redacted Project stage: Other 2009-01-01 |
ML22216A210 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 01/01/2009 |
From: | Constellation Energy Company |
To: | Division of Operating Reactor Licensing |
Arora S, NRR/DORL/LPL3 | |
References | |
EPID L-2022-LRO-0059 | |
Download: ML22216A210 (590) | |
Similar Documents at Clinton | |
---|---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML24092A3452024-04-0101 April 2024
[Table view]Updated Safety Analysis Report (Usar), Revision 23 ML22216A2212022-05-19019 May 2022 2 to Updated Safety Analysis Report, Appendix E, Figures Part 1 of 2_Redacted ML22111A2152022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML22111A2002022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 4 of 5 ML22111A1962022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22111A2162022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix a, Glossary ML22111A1922022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22111A2182022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix C, Computer Programs RS-22-048, 2 to Updated Safety Analysis Report, B 2.0 Safety Limits (Sls)2022-03-31031 March 2022 2 to Updated Safety Analysis Report, B 2.0 Safety Limits (Sls) ML22111A2142022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML22111A2082022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22111A2102022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 12, Radiation Protection ML22111A1912022-03-31031 March 2022 2 to Updated Safety Analysis Report, USAR Cover and List of Effective Pages (Loep) ML22111A1982022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures Part 2 of 5 ML22111A2022022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 4, Reactor ML22111A1942022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Figures, Part 1 of 2 ML22111A1952022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Figures, Part 2 of 2 ML22111A1932022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Site Characteristics ML22111A2072022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems ML22111A1992022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 3 of 5 ML22111A2222022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix E, Figures Part 2 of 2 ML22111A2052022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 7, Instrument and Control Systems ML22111A2122022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML22111A2172022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix B, Construction Material Standards and Quality Control Procedures ML22111A1972022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 1 of 5 ML22111A2032022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22111A2202022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix E, Fire Protection Evaluation Report ML22111A1902022-03-31031 March 2022 Submittal of Revision 22 to Updated Safety Analysis Report, Letter and Attachments A-F ML22111A2092022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22111A2062022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 8, Electric Power ML22111A2242022-03-31031 March 2022 2 to Updated Safety Analysis Report, Clinton Power Station Operational Requirements Manual (Orm) ML22111A2112022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML20105A2502020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.3-1, Part 1 of 5 ML20105A2672020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML20105A2712020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix C, Computer Programs ML20105A2732020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix E, Fire Protection Evaluation Report ML20105A2642020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML20105A2612020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML20105A2702020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix B, Construction Material Standards and Quality Control Procedures ML20105A2652020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML20105A2682020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML20105A2592020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 8, Electric Power RS-20-028, 1 to Updated Safety Analysis Report, CPS Tsb2020-03-31031 March 2020 1 to Updated Safety Analysis Report, CPS Tsb ML20105A2492020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML20105A2752020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix E, Figures Part 2 of 2 ML20105A2512020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 2 of 5 ML20105A2522020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 3 of 5 ML20105A2532020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 4 of 5 ML20105A2692020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix a, Glossary ML20105A2622020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management 2024-04-01 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML22216A210&oldid=3723387"