ML22210A317

From kanterella
Jump to navigation Jump to search
Kairos Power, LLC - Transmittal of Changes to Preliminary Safety Analysis Report Chapters 4 and 6
Date released: 08/01/2022 Download: ML22210A317


Enclosure 1: Changes to PSAR Chapter 4 and Chapter 6
ML22210A319
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 07/29/2022
From:
Kairos Power
To:
Office of Nuclear Reactor Regulation
References
KP‐NRC‐2207‐009
Download: ML22210A319 (5)
Kairos Power, LLC - Transmittal of Changes to Preliminary Safety Analysis Report Chapters 4 and 6
ML22210A318
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 07/29/2022
From: Hastings P
Kairos Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
KP-NRC-2207-009
Download: ML22210A318 (2)