ML22196A024

From kanterella
Jump to navigation Jump to search
NAC International, Inc., Final Safety Analysis Report, Amendment 11 Supplement, Revision 22B
ML22196A024
Person / Time
Site: 07201031
Issue date: 07/15/2022
From:
NAC International
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML22196A022 List:
References
ED20220101
Download: ML22196A024 (15)


Text

July 2022 Revision 22B MAGNASTOR (Modular Advanced Generation Nuclear All-purpose STORage)

FINAL SAFETY ANALYSIS REPORT Amendment 11 Supplement Docket No. 72-1031 Atlanta Corporate Headquarters: 3930 East Jones Bridge Road, Norcross, Georgia 30092 USA Phone 770-447-1144, Fax 770-447-1797, www.nacintl.com to ED20220101 Page 1 of 3 Enclosure 1 List of Changes for MAGNASTOR FSAR, Amendment 11 Supplement Revision 22B (Docket No 72-1031)

NAC International July 2022 to ED20220101 Page 2 of 3 List of Changes for the MAGNASTOR FSAR, Revision 22B Note: The List of Effective Pages and the Chapter Table of Contents, List of Figures, and List of Tables have been revised accordingly to reflect the list of changes detailed below.

Chapter 1 No changes.

Chapter 2 No changes.

Chapter 3 No changes.

Chapter 4 No changes.

Chapter 5 No changes.

Chapter 6 No changes.

Chapter 7 No changes.

Chapter 8 No changes.

Chapter 9 No changes.

Chapter 10 Page 10.2-3, modified the sixth row of Table 10.2-1 where indicated.

to ED20220101 Page 3 of 3 Chapter 11 No changes.

Chapter 12 No changes.

Chapter 13 No changes.

Chapter 14 No changes Chapter 15 No changes to ED20220101 Page 1 of 1 Enclosure 2 FSAR Changed Pages and LOEP Docket No. 72-1031 MAGNASTOR FSAR, Amendment 11 Supplement Revision 22B (Docket No 72-1031)

NAC International July 2022

July 2022 Revision 22B MAGNASTOR (Modular Advanced Generation Nuclear All-purpose STORage)

FINAL SAFETY ANALYSIS REPORT Docket No. 72-1031 Atlanta Corporate Headquarters: 3930 East Jones Bridge Road, Norcross, Georgia 30092 USA Phone 770-447-1144, Fax 770-447-1797, www.nacintl.com

MAGNASTOR System FSAR July 2022 Docket No. 72-1031 Revision 22B List of Effective Pages Chapter 1 Page 2.4-6 .............................. Revision 5 Page 1-i ............................. Revision 20A Page 2.4-7 .............................. Revision 9 Page 1-1 ................................. Revision 1 Page 2.5-1 .............................. Revision 0 Page 1.1-1 thru 1.1-6......... Revision 20A Page 2.6-1 thru 2.6-2.............. Revision 0 Page 1.2-1 thru 1.2-2......... Revision 20A Page 1.3-1 .............................. Revision 5 Chapter 3 Page 1.3-2 ......................... Revision 20A Page 3-i .................................. Revision 6 Page 1.3-3 .............................. Revision 5 Page 3-ii thru 3-x .............. Revision 20A Page 1.3-4 thru 1.3-10....... Revision 20A Page 3-1 ................................. Revision 0 Page 1.3-11 thru 1.3-13 .......... Revision 5 Page 3.1-1 .............................. Revision 9 Page 1.3-14 thru 1.3-21 ..... Revision 20A Page 3.1-2 .............................. Revision 0 Page 1.4-1 ......................... Revision 20A Page 3.1-3 thru 3.1-6......... Revision 20A Page 1.5-1 .............................. Revision 9 Page 3.2-1 thru 3.2-6......... Revision 20A Page 1.6-1 .............................. Revision 9 Page 3.3-1 .............................. Revision 0 Page 1.6-2 .............................. Revision 0 Page 3.4-1 .............................. Revision 2 Page 1.7-1 .............................. Revision 0 Page 3.4-2 ......................... Revision 20A Page 1.7-2 .............................. Revision 2 Page 3.4-3 .............................. Revision 6 Page 1.8-1 thru 1.8-2......... Revision 20A Page 3.4-4 .............................. Revision 1 Page 3.4-5 .............................. Revision 5 26 drawings (see Section 1.8) Page 3.4-6 thru 3.4-14............ Revision 3 Page 3.4-15 ....................... Revision 20A Chapter 2 Page 3.4-16 thru 3.4-42.......... Revision 3 Page 2-i thru 2-ii ............... Revision 20A Page 3.4-43 thru 3.4-57.......... Revision 9 Page 2-1 ............................ Revision 20A Page 3.4-58 thru 3.4-77..... Revision 20A Page 2.1-1 .............................. Revision 5 Page 3.5-1 .............................. Revision 5 Page 2.1-2 .............................. Revision 0 Page 3.5-2 thru 3.5-4.............. Revision 9 Page 2.1-3 .............................. Revision 5 Page 3.5-5 thru 3.5-26............ Revision 6 Page 2.1-4 .............................. Revision 8 Page 3.5-27 ....................... Revision 20A Page 2.1-5 .............................. Revision 5 Page 3.5-28 thru 3.5-30.......... Revision 8 Page 2.2-1 ......................... Revision 20A Page 3.6-1 thru 3.6-2.............. Revision 5 Page 2.2-2 ..........................Revision 21B Page 3.6-3 thru 3.6-4.............. Revision 9 Page 2.2-3 thru 2.2-4......... Revision 20A Page 3.6-5 thru 3.6-19............ Revision 6 Page 2.2-5 ..........................Revision 21B Page 3.7-1 .............................. Revision 5 Page 2.2-6 thru 2.2-7......... Revision 20A Page 3.7-2 thru 3.7-3.............. Revision 9 Page 2.2-8 ..........................Revision 21B Page 3.7-4 thru 3.7-56............ Revision 6 Page 2.2-9 ......................... Revision 20A Page 3.7-57 ....................... Revision 20A Page 2.3-1 thru 2.3-4.............. Revision 0 Page 3.7-58 ............................ Revision 6 Page 2.3-5 .............................. Revision 5 Page 3.7-59 thru 3.7-61.......... Revision 8 Page 2.3-6 thru 2.3-8.............. Revision 0 Page 3.7-62 thru 3.7-64.......... Revision 6 Page 2.4-1 .............................. Revision 0 Page 3.7-65 ............................ Revision 8 Page 2.4-2 .............................. Revision 2 Page 3.7-66 ............................ Revision 6 Page 2.4-3 thru 2.4-4.............. Revision 5 Page 3.7-67 thru 3.7-68.......... Revision 8 Page 2.4-5 .............................. Revision 0 Page 3.7-69 ............................ Revision 6 Page 1 of 7

MAGNASTOR System FSAR July 2022 Docket No. 72-1031 Revision 22B List of Effective Pages (contd)

Page 3.7-70 thru 3.7-72 .......... Revision 8 Page 3.10.8-3 thru 3.10.8-8.... Revision 0 Page 3.7-72 thru 3.7-81 .......... Revision 6 Page 3.10.9-1 ......................... Revision 6 Page 3.7-73 thru 3.7-79 .......... Revision 6 Page 3.10.9-2 ......................... Revision 4 Page 3.7-80 ............................ Revision 8 Page 3.10.9-3 thru 3.10.9-11.. Revision 0 Page 3.7-81 ............................ Revision 6 Page 3.10.10-1 thru 3.10.10-8 Revision 5 Page 3.8-1 thru 3.8-10............ Revision 0 Page 3.11.1 ........................ Revision 20A Page 3.9-1 .............................. Revision 0 Page 3.11.1-1 .................... Revision 20A Page 3.9-2 .............................. Revision 1 Page 3.11.2-1 thru Page 3.9-3 .............................. Revision 9 3.11.2-26 ..................... Revision 20A Page 3.10-1 ............................ Revision 0 Page 3.11.3-1 thru Page 3.10.1-1 ......................... Revision 5 3.11.3-27 ..................... Revision 20A Page 3.10.1-2 thru 3.10.1-4.... Revision 2 Page 3.11.3-28 ...................Revision 21B Page 3.10.1-5 ......................... Revision 1 Page 3.11.3-29 .................. Revision 20A Page 3.10.1-6 thru 3.10.1-32.. Revision 5 Page 3.10.2-1 thru 3.10.2-6.... Revision 4 Chapter 4 Page 3.10.2-7 thru Page 4-i .................................. Revision 9 3.10.2-44 ..................... Revision 20A Page 4-ii ............................ Revision 20A Page 3.10.3-1 thru 3.10.3-2.... Revision 8 Page 4-iii ................................ Revision 9 Page 3.10.3-3 ......................... Revision 0 Page 4-iv thru 4-v...............Revision 21B Page 3.10.3-4 thru 3.10.3-23.. Revision 1 Page 4-vi thru 4-vii ........... Revision 20A Page 3.10.3-24 ....................... Revision 8 Page 4-1 ................................. Revision 0 Page 3.10.3-25 thru 3.10.3-38 Revision 1 Page 4.1-1 thru 4.1-4......... Revision 20A Page 3.10.4-1 thru 3.10.4-2.... Revision 1 Page 4.1-5 thru 4.1-8.............. Revision 7 Page 3.10.4-3 thru 3.10.4-9.... Revision 0 Page 4.2-1 .............................. Revision 0 Page 3.10.4-10 ....................... Revision 1 Page 4.3-1 .............................. Revision 0 Page 3.10.4-11 thru 3.10.4-14 Revision 0 Page 4.4-1 ......................... Revision 20A Page 3.10.5-1 ......................... Revision 1 Page 4.4-2 thru 4.4-3.............. Revision 5 Page 3.10.5-2 ......................... Revision 2 Page 4.4-4 thru 4.4-7.............. Revision 8 Page 3.10.5-3 ......................... Revision 9 Page 4.4-8 thru 4.4-10............ Revision 5 Page 3.10.5-4 thru Page 4.4-11 ............................ Revision 7 3.10.5-13 ..................... Revision 20A Page 4.4-12 ....................... Revision 20A Page 3.10.6-1 thru 3.10.6-2.... Revision 5 Page 4.4-13 thru 4.4-20.......... Revision 7 Page 3.10.6-3 ......................... Revision 4 Page 4.4-21 thru 4.4-22.......... Revision 9 Page 3.10.6-4 thru 3.10.6-6.... Revision 5 Page 4.4-23 thru 4.4-25.......... Revision 7 Page 3.10.6-7 thru 3.10.6-10.. Revision 4 Page 4.4-26 thru 4.4-27.......... Revision 8 Page 3.10.6-11 thru 3.10.6-13 Revision 2 Page 4.4-28 thru 4.4-31.......... Revision 7 Page 3.10.6.14 thru 3.10.6-16 Revision 4 Page 4.4-32 ............................ Revision 9 Page 3.10.6-17 thru 3.10.6-18 Revision 2 Page 4.4-33 thru 4.4-36.......... Revision 8 Page 3.10.6-19 ....................... Revision 4 Page 4.4-37 thru 4.4-63.......... Revision 7 Page 3.10.6-20 thru 3.10.6-21 Revision 2 Page 4.4-64 ............................ Revision 8 Page 3.10.6-22 thru 3.10.6-34 Revision 4 Page 4.4-65 thru 4.4-71.......... Revision 7 Page 3.10.7-1 thru 3.10.7-2.... Revision 0 Page 4.5-1 ......................... Revision 20A Page 3.10.8-1 ......................... Revision 4 Page 4.5-2 .............................. Revision 7 Page 3.10.8-2 ......................... Revision 2 Page 4.5-3 thru 4.5-4.............. Revision 9 Page 2 of 7

MAGNASTOR System FSAR July 2022 Docket No. 72-1031 Revision 22B List of Effective Pages (contd)

Page 4.6-1 ......................... Revision 20A Page 5-iii ........................... Revision 20A Page 4.6-2 thru 4.6-4.............. Revision 7 Page 5-iv ................................ Revision 5 Page 4.7-1 .............................. Revision 0 Page 5-v ................................. Revision 1 Page 4.7-2 .............................. Revision 9 Page 5-vi ................................ Revision 5 Page 4.8-1 .............................. Revision 0 Page 5-vii ............................... Revision 8 Page 4.8.1-1 thru 4.8.1-10...... Revision 0 Page 5-viii .............................. Revision 5 Page 4.8.2-1 thru 4.8.2-8........ Revision 0 Page 5-ix ................................ Revision 9 Page 4.8.3-1 thru 4.8.3-2........ Revision 0 Page 5-x thru 5-xi.............. Revision 20A Page 4.8.3-3 thru 4.8.3-4........ Revision 1 Page xii thru xiv ..................... Revision 9 Page 4.8.3-5 ........................... Revision 0 Page xv .............................. Revision 20A Page 4.8.3-6 thru 4.8.3-9........ Revision 1 Page 5-1 thru 5-2............... Revision 20A Page 4.9-1 .............................. Revision 9 Page 5.1-1 thru 5.1-13....... Revision 20A Page 4.9.1-1 ......................... Revision 10 Page 5.2-1 thru 5.2-12............ Revision 5 Page 4.9.2-1 thru 4.9.2-4...... Revision 10 Page 5.3-1 thru 5.3-2.............. Revision 5 Page 4.9.3-1 ........................... Revision 8 Page 5.3-3 .............................. Revision 0 Page 4.9.3-2 ......................... Revision 10 Page 5.3-4 thru 5.3-5.............. Revision 1 Page 4.9.3-3 ........................... Revision 3 Page 5.3-6 .............................. Revision 0 Page 4.9.4-1 ........................... Revision 8 Page 5.4-1 thru 5.4-5.............. Revision 0 Page 4.10-1 ............................ Revision 9 Page 5.5-1 .............................. Revision 0 Page 4.10.1-1 thru 4.10.1-5.... Revision 9 Page 5.5-2 thru 5.5-3.............. Revision 8 Page 4.10.2-1 thru 4.10.2-5.... Revision 9 Page 5.5-4 thru 5.5-5.............. Revision 5 Page 4.11-1 ........................Revision 21B Page 5.5-6 .............................. Revision 0 Page 4.11.1-1 thru Page 5.5-7 thru 5.5-10............ Revision 1 4.11.1-49 ......................Revision 21B Page 5.5-11 thru 5.5-13.......... Revision 0 Page 4.11.2-1 .....................Revision 21B Page 5.5-14 ............................ Revision 8 Page 4.11.2-2 .................... Revision 20A Page 5.5-15 ............................ Revision 1 Page 4.11.2-3 thru Page 5.5-16 thru 5.5-20.......... Revision 5 4.11.2-4 ........................Revision 21B Page 5.6-1 thru 5.6-2.............. Revision 0 Page 4.11.2-5 thru Page 5.6-3 .............................. Revision 1 4.11.2-6 ....................... Revision 20A Page 5.6-4 .............................. Revision 8 Page 4.11.2-7 thru Page 5.6-5 thru 5.6-6.............. Revision 5 4.11.2-8 ........................Revision 21B Page 5.6-7 .............................. Revision 1 Page 4.11.2-9 thru Page 5.6-8 .............................. Revision 5 4.11.2-11 ..................... Revision 20A Page 5.6-9 .............................. Revision 1 Page 4.11.2-12 ...................Revision 21B Page 5.6-10 thru 5.6-13.......... Revision 0 Page 4.11.3-1 thru Page 5.7-1 thru 5.7-2.............. Revision 0 4.11.3-2 ........................Revision 21B Page 5.7-3 .............................. Revision 9 Page 4.11.4-1 thru Page 5.8-1 .............................. Revision 0 4.11.4-3 ........................Revision 21B Page 5.8.1-1 thru 5.8.1-4........ Revision 0 Page 4.11.5-1 .....................Revision 21B Page 5.8.2-1 ........................... Revision 0 Page 5.8.2-2 thru 5.8.2-5........ Revision 1 Chapter 5 Page 5.8.2-6 ........................... Revision 0 Page 5-i ............................. Revision 20A Page 5.8.2-7 thru 5.8.2-13...... Revision 1 Page 5-ii ................................. Revision 9 Page 5.8.3-1 ........................... Revision 5 Page 3 of 7

MAGNASTOR System FSAR July 2022 Docket No. 72-1031 Revision 22B List of Effective Pages (contd)

Page 5.8.3-2 ........................... Revision 1 Page 5.8.11-1 thru 5.8.11-3.... Revision 1 Page 5.8.3-3 ........................... Revision 5 Page 5.8.12-1 ......................... Revision 8 Page 5.8.3-4 ........................... Revision 8 Page 5.8.12-2 thru 5.8.12-16.. Revision 5 Page 5.8.3-5 ........................... Revision 5 Page 5.8.13-1 thru 5.8.13-6.... Revision 5 Page 5.8.3-6 thru 5.8.3-17...... Revision 1 Page 5.9-1 .............................. Revision 7 Page 5.8.3-18 thru 5.8.3-19.... Revision 5 Page 5.9.1-1 ........................... Revision 7 Page 5.8.3-20 thru 5.8.3-23.... Revision 1 Page 5.9.2-1 ........................... Revision 7 Page 5.8.3-24 thru 5.8.3-31.... Revision 5 Page 5.9.3-1 thru 5.9.3-5........ Revision 7 Page 5.8.3-32 ......................... Revision 8 Page 5.9.4-1 thru 5.9.4-2........ Revision 7 Page 5.8.3-33 ......................... Revision 5 Page 5.9.5-1 thru 5.9.5-2........ Revision 7 Page 5.8.4-1 ........................... Revision 5 Page 5.9.6-1 thru 5.9.6-4........ Revision 7 Page 5.8.4-2 ........................... Revision 7 Page 5.9.7-1 thru 5.9.7-23...... Revision 7 Page 5.8.4-3 thru 5.8.4-17...... Revision 0 Page 5.9.8-1 ........................... Revision 7 Page 5.8.4-18 thru 5.8.4-29.... Revision 9 Page 5.9.8-2 thru 5.9.8-28...... Revision 9 Page 5.8.4-30 ......................... Revision 0 Page 5.9.9-1 thru 5.9.9-6........ Revision 7 Page 5.8.5-1 ........................... Revision 5 Page 5.10-1 ............................ Revision 7 Page 5.8.5-2 thru 5.8.5-3........ Revision 7 Page 5.10.1-1 ......................... Revision 7 Page 5.8.5-4 ........................... Revision 8 Page 5.10.2-1 ......................... Revision 7 Page 5.8.5-5 thru 5.8.5-6........ Revision 5 Page 5.10.3-1 thru 5.10.3-3.... Revision 7 Page 5.8.5-7 ........................... Revision 0 Page 5.10.4-1 ......................... Revision 7 Page 5.8.5-8 thru 5.8.5-9........ Revision 8 Page 5.10.5-1 thru 5.10.5-4.... Revision 7 Page 5.8.6-1 ........................... Revision 7 Page 5.10.6-1 ......................... Revision 7 Page 5.8.6-2 thru 5.8.6-6........ Revision 5 Page 5.10.6-2 thru 5.10.6-25.. Revision 9 Page 5.8.6-7 ........................... Revision 7 Page 5.11.1-1 thru 5.11.1-6.... Revision 9 Page 5.8.7-1 thru 5.8.7-2........ Revision 7 Page 5.11.2-1 ......................... Revision 9 Page 5.8.7-3 ........................... Revision 0 Page 5.11.3-1 thru 5.11.3-4.... Revision 9 Page 5.8.7-4 ........................... Revision 8 Page 5.11.4-1 thru 5.11.4-8.... Revision 9 Page 5.8.7-5 ........................... Revision 7 Page 5.11.5-1 thru 5.11.5-2.... Revision 9 Page 5.8.8-1 ........................... Revision 8 Page 5.11.6-1 ......................... Revision 9 Page 5.8.8-2 thru 5.8.8-4........ Revision 0 Page 5.11.7-1 thru 5.11.7-2.... Revision 9 Page 5.8.8-5 thru 5.8.8-12...... Revision 1 Page 5.11.8-1 thru 5.11.8-11.. Revision 9 Page 5.8.8-13 thru 5.8.8-23.... Revision 0 Page 5.11.9-1 ......................... Revision 9 Page 5.8.8-24 thru 5.8.8-34.... Revision 1 Page 5.11.10-1 thru Page 5.8.8-35 thru 5.8.8-56.... Revision 0 5.11.10-10 ........................ Revision 9 Page 5.8.8-57 thru 5.8.8-65.... Revision 5 Page 5.11.11-1 thru Page 5.8.8-66 thru 5.8.8-79.... Revision 8 5.11.11-41 ........................ Revision 9 Page 5.8.8-80 thru 5.8.8-115.. Revision 5 Page 5.12-1 ....................... Revision 20A Page 5.8.9-1 ........................... Revision 7 Page 5.12.1-1 .................... Revision 20A Page 5.8.9-2 ........................... Revision 0 Page 5.12.2-1 thru Page 5.8.9-3 thru 5.8.9-54...... Revision 9 5.12.2-4 ....................... Revision 20A Page 5.8.9-55 ......................... Revision 1 Page 5.12.3-1 .................... Revision 20A Page 5.8.9-56 ......................... Revision 7 Page 5.12.4-1 thru Page 5.8.9-57 thru 5.8.9-69.... Revision 9 5.12.4-11 ..................... Revision 20A Page 5.8.10-1 thru 5.8.10-5.... Revision 0 Page 5.12.5-1 .................... Revision 20A Page 4 of 7

MAGNASTOR System FSAR July 2022 Docket No. 72-1031 Revision 22B List of Effective Pages (contd)

Page 5.12.6-1 .................... Revision 20A Page 6.7.1-4 ........................... Revision 2 Page 5.12.7-1 .................... Revision 20A Page 6.7.1-5 thru 6.7.1-37...... Revision 0 Page 5.13-1 ....................... Revision 20A Page 6.7.2-1 thru 6.7.2-2........ Revision 0 Page 5.13.1-1 thru Page 6.7.2-3 ........................... Revision 5 5.13.1-4 ....................... Revision 20A Page 6.7.2-4 thru 6.7.2-5........ Revision 0 Page 5.13.2-1 thru Page 6.7.3-1 thru 6.7.3-27...... Revision 5 5.13.2-2 ....................... Revision 20A Page 6.7.4-1 thru Page 5.13.3-1 thru 6.7.4-26 ....................... Revision 20A 5.13.3-3 ....................... Revision 20A Page 6.7.5-1 ...................... Revision 20A Page 5.14-1 ....................... Revision 20A Page 6.7.5-2 thru 6.7.5-7........ Revision 0 Page 5.14.1-1 .................... Revision 20A Page 6.7.6-1 thru 6.7.6-4... Revision 20A Page 5.14.2-1 .................... Revision 20A Page 6.7.6-5 ........................... Revision 2 Page 5.14.3-1 .................... Revision 20A Page 6.7.6-6 thru Page 5.14.4-1 thru 6.7.6-12 ....................... Revision 20A 5.14.4-10 ..................... Revision 20A Page 6.7.6-13 thru 6.7.6-16.... Revision 2 Page 5.14.5-1 thru Page 6.7.6-17 thru 5.14.5-3 ....................... Revision 20A 6.7.6-23 ....................... Revision 20A Page 5.14.6-1 .................... Revision 20A Page 6.7.6-24 ......................... Revision 7 Page 5.14.7-1 .................... Revision 20A Page 6.7.6-25 .................... Revision 20A Page 6.7.6-26 ......................... Revision 2 Chapter 6 Page 6.7.6-27 thru Page 6-i thru 6-vi .............. Revision 20A 6.7.6-31 ....................... Revision 20A Page 6-1 ................................. Revision 0 Page 6.7.7-1 thru 6.7.7-34. Revision 20A Page 6.1-1 thru 6.1-19....... Revision 20A Page 6.7.8-1 thru 6.7.8-3........ Revision 5 Page 6.2-1 .............................. Revision 5 Page 6.7.8-4 ........................... Revision 7 Page 6.2-2 thru 6.2-5.............. Revision 0 Page 6.7.8-5 thru 6.7.8-80...... Revision 5 Page 6.3-1 thru 6.3-3......... Revision 20A Page 6.7.8-81 thru 6.7.8-83.... Revision 7 Page 6.3-4 thru 6.3-8.............. Revision 0 Page 6.7.8-84 ......................... Revision 5 Page 6.3-9 .............................. Revision 2 Page 6.7.8-85 thru 6.7.8-87.... Revision 7 Page 6.4-1 .............................. Revision 0 Page 6.7.8-88 thru 6.7.8-89.... Revision 5 Page 6.4-2 .............................. Revision 2 Page 6.7.8-90 ......................... Revision 7 Page 6.4-3 .............................. Revision 5 Page 6.7.9-1 thru 6.7.9-9... Revision 20A Page 6.4-4 thru 6.4-7......... Revision 20A Page 6.7.10-1 thru Page 6.4-8 thru 6.4-10............ Revision 5 6.7.10-2 ....................... Revision 20A Page 6.4-11 ....................... Revision 20A Page 6.5-1 ......................... Revision 20A Chapter 7 Page 6.5-2 .............................. Revision 0 Page 7-i ................................. Revision 5 Page 6.5-3 thru 6.5-4......... Revision 20A Page 7-1 ................................. Revision 0 Page 6.5-5 thru 6.5-7.............. Revision 0 Page 7.1-1 thru 7.1-3......... Revision 20A Page 6.5-8 ......................... Revision 20A Page 7.1-4 .............................. Revision 7 Page 6.6-1 ......................... Revision 20A Page 7.1-5 .............................. Revision 5 Page 6.7-1 .............................. Revision 0 Page 7.1-6 .............................. Revision 2 Page 6.7.1-1 thru 6.7.1-2........ Revision 5 Page 7.2-1 .............................. Revision 8 Page 6.7.1-3 ........................... Revision 0 Page 7.2-2 .............................. Revision 0 Page 5 of 7

MAGNASTOR System FSAR July 2022 Docket No. 72-1031 Revision 22B List of Effective Pages (contd)

Page 7.3-1 .............................. Revision 0 Page 7.4-1 .............................. Revision 0 Chapter 9 Page 9-i ............................. Revision 20A Chapter 8 Page 9-1 thru 9-2.................... Revision 2 Page 8-i .................................. Revision 8 Page 9.1-1 thru 9.1-20....... Revision 20A Page 8-ii ................................. Revision 5 Page 9.2-1 thru 9.2-16....... Revision 20A Page 8-1 ................................. Revision 0 Page 9.3-1 thru 9.3-18....... Revision 20A Page 8.1-1 .............................. Revision 5 Page 9.4-1 thru 9.4-6......... Revision 20A Page 8.1-2 ......................... Revision 20A Page 8.1-3 .............................. Revision 6 Chapter 10 Page 8.1-4 ......................... Revision 20A Page 10-i ........................... Revision 20A Page 8.2-1 .............................. Revision 1 Page 10-1 ............................... Revision 0 Page 8.3-1 .............................. Revision 5 Page 10.1-1 ............................ Revision 5 Page 8.3-2 thru 8.3-8.............. Revision 1 Page 10.1-2 ............................ Revision 6 Page 8.3-9 thru 8.3-14............ Revision 5 Page 10.1-3 thru 10.1-4.......... Revision 2 Page 8.3-15 thru 8.3-16 ..... Revision 20A Page 10.1-5 ............................ Revision 9 Page 8.3-17 ............................ Revision 5 Page 10.1-6 thru 10.1-23... Revision 20A Page 8.4-1 .............................. Revision 0 Page 10.2-1 thru 10.2-2.......... Revision 9 Page 8.5-1 ......................... Revision 20A Page 10.2-3 ........................Revision 22B Page 8.5-2 .............................. Revision 6 Page 10.3-1 ............................ Revision 0 Page 8.6-1 .............................. Revision 1 Page 10.3-2 ............................ Revision 1 Page 8.6-2 thru 8.6-3.............. Revision 8 Page 8.7-1 .............................. Revision 2 Chapter 11 Page 8.7-2 .............................. Revision 0 Page 11-i ........................... Revision 20A Page 8.8-1 .............................. Revision 2 Page 11-1 .......................... Revision 20A Page 8.8-2 .............................. Revision 3 Page 11.1-1 thru 11.1-2.......... Revision 0 Page 8.8-3 .............................. Revision 0 Page 11.2-1 ....................... Revision 20A Page 8.8-4 .............................. Revision 3 Page 11.3-1 ............................ Revision 0 Page 8.9-1 .............................. Revision 0 Page 11.3-2 thru 11.3-3..... Revision 20A Page 8.10-1 ............................ Revision 0 Page 11.3-4 ............................ Revision 0 Page 8.10-2 thru 8.10-3..... Revision 20A Page 11.3-5 thru 11.3-6..... Revision 20A Page 8.10-4 thru 8.10-6.......... Revision 1 Page 11.4-1 ............................ Revision 0 Page 8.10-7 ............................ Revision 8 Page 11.5-1 ............................ Revision 0 Page 8.11-1 thru 8.11-2.......... Revision 0 Page 8.11-3 ............................ Revision 8 Chapter 12 Page 8.12-1 thru 8.12-2.......... Revision 0 Page 12-i ........................... Revision 20A Page 8.12-3 ....................... Revision 20A Page 12-1 ............................... Revision 0 Page 8.13-1 ............................ Revision 8 Page 12.1-1 ....................... Revision 20A Page 8.13-2 thru 8.13-6.......... Revision 0 Page 12.1-2 ............................ Revision 5 Page 8.13-7 ............................ Revision 8 Page 12.1-3 thru 12.1-7..... Revision 20A Page 8.13-8 ............................ Revision 6 Page 12.1-8 ............................ Revision 8 Page 8.13-9 ............................ Revision 8 Page 12.1-9 thru 12.1-10........ Revision 5 Page 8.13-10 thru 8.13-17...... Revision 6 Page 12.2-1 ............................ Revision 0 Page 8.13-18 thru 8.13-40...... Revision 8 Page 12.2-2 thru 12.2-4..... Revision 20A Page 6 of 7

MAGNASTOR System FSAR July 2022 Docket No. 72-1031 Revision 22B List of Effective Pages (contd)

Page 12.2-5 ............................ Revision 4 Page 12.2-6 ............................ Revision 0 Page 12.2-7 thru 12.2-21 ... Revision 20A Page 12.3-1 thru 12.3-2.......... Revision 0 Chapter 13 Page 13-i ................................ Revision 0 Page 13-1 ............................... Revision 0 Page 13A-i ............................. Revision 0 Page 13A-1............................. Revision 0 Page 13B-i.............................. Revision 0 Page 13B-1 ............................. Revision 0 Page 13C-i.............................. Revision 1 Page 13C-1 ............................. Revision 5 Page 13C-2 thru 13C-3 ..... Revision 20A Page 13C-4 thru 13C-9 .......... Revision 0 Page 13C-10 ........................... Revision 7 Page 13C-11 thru 13C-13 . Revision 20A Page 13C-14 ........................... Revision 1 Page 13C-15 thru 13C-16 . Revision 20A Page 13C-17 thru 13C-18 ...... Revision 9 Page 13C-19 thru 13C-20 ...... Revision 5 Page 13C-21 ...................... Revision 20A Page 13C-22 ........................... Revision 1 Page 13C-23 thru 13C-24 ...... Revision 5 Page 13C-25 thru 13C-27 ...... Revision 2 Chapter 14 Page 14-i ................................ Revision 0 Page 14-1 thru 14-2................ Revision 0 Page 14.1-1 thru 14.1-7.......... Revision 0 Page 14.2-1 ............................ Revision 0 Chapter 15 Page 15-i ................................ Revision 0 Page 15-1 ............................... Revision 0 Page 15.1-1 ............................ Revision 0 Page 15.2-1 thru 15.2-4.......... Revision 0 Page 15.3-1 ............................ Revision 0 Page 7 of 7

MAGNASTOR System FSAR July 2022 Docket No. 72-1031 Revision 22B Table 10.2-1 MAGNASTOR Maintenance Program Schedule Task Frequency Visual inspection and repair or recoating of concrete cask concrete and accessible coated Annually during storage operations carbon steel surfaces Visual inspection of concrete cask identification Annually markings Load testing and/or visual and dimensional Annually while transfer cask is in operation, or inspection of the transfer cask prior to returning to service Visual inspection and repair or recoating of MTC1 transfer cask exposed carbon steel Annually while transfer cask is in operation, or surfaces, except on sliding surfaces (does not prior to returning the transfer cask to service apply to MTC2 or PMTC)

Visual inspection of MTC1 transfer cask exposed carbon steel surfaces and temporary Quarterly while transfer cask is in operation, or repair of coating surfaces using site-approved prior to returning the transfer cask to service materials (does not apply to MTC2, PMTC or LMTC)

Visual examination of welds of PMTC neutron Annually while PMTC is in operation, or prior to shield and expansion tanks returning the transfer cask to service Visual examination of welds of LMTC neutron Annually while LMTC is in operation, or prior to shield and expansion tanks returning the transfer cask to service Functional check of transfer cask sliding parts to Each use verify adequate lubrication Functional check of transfer cask inflatable Each use seals to confirm operability Visual inspection of the concrete cask lift lug Prior to each installation bolts - if applicable NAC International 10.2-3