ML22195A285
| ML22195A285 | |
| Person / Time | |
|---|---|
| Site: | 07003103 |
| Issue date: | 07/15/2022 |
| From: | Robert Williams NRC/RGN-II/DFFI |
| To: | Lorskulsint P URENCO USA |
| References | |
| IR 2022401\\ | |
| Download: ML22195A285 (3) | |
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Mr. Paul Lorskulsint Chief Nuclear Officer Urenco USA P.O. Box 1789 Eunice, NM 88231
SUBJECT:
LOUISIANA ENERGY SERVICES - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 07003103/2022401
Dear Mr. Lorskulsint:
On June 16, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Louisiana Energy Services and discussed the results of this inspection with Karen Fili and other members of your staff. The results of this inspection are documented in the enclosed report.
One Severity Level IV violation is documented in this report. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Louisiana Energy Services.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the July 15, 2022
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION P. Lorskulsint 2
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely, Robert E. Williams, Jr., Chief Projects Branch 1 Division of Fuel Facility Inspection Docket No. 07003103 License No. SNM-2010
Enclosure:
As stated cc w/o encl: Distribution via LISTSERV Signed by Williams, Robert on 07/15/22
ML22195A285 (Cover letter)
Cover Letter Only:
x SUNSI Review x Non-Sensitive Sensitive x Publicly Available Non-Publicly Available OFFICE RII/DFFI RII/DFFI RII/DFFI NAME M.Romano N.Pitoniak R.Williams DATE 07/14/2022 07/14/2022 07/14/2022