MEMORANDUM TO:
William Jessup, Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:
Lucieann Vechioli, Project Manager Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF THE JUNE 27, 2022, PUBLIC MEETING TO DISCUSS THE U.S. NUCLEAR REGULATORY COMMISSION COMMENTS ON THE SECOND REVISION OF THE WHITE PAPER, PHYSICAL PROTECTION SYSTEM APPROACH, REVISION 2 (EPID L-2022-LRO-0006)
On June 27, 2022, an observation public meeting was held to discuss the U.S. Nuclear Regulatory Commission (NRC) staffs comments on Revision 2 of the X Energy, LLC (X-energy)s Xe-100 White Paper, Physical Protection System Approach, which was submitted to the NRC on April 8, 2022. The NRC staff provided their initial comments to the industry on June 7, 2022. These documents can be found in Agency Documents Access and Management System (ADAMS) at ML22098A228 and ML22159A229, respectively.
The public meeting notice and agenda, dated June 15, 2022, are available at ML22166A308.
The Enclosure provides the list of meeting attendees.
Meeting Summary After introductions, the opening remarks included X-energy representatives stating that the subject white paper was developed early in the licensing process at the pre-application phase and with the purpose of satisfying one of the Advanced Reactors Demonstration Program requirements. X-energy has made significant progress on addressing several important areas such as the development of a site-specific template. X-energy representatives stated that they plan to incorporate the NRC staffs feedback in a subsequent topical report (TR). Tom Braudt, X-energy, mentioned that they are working on identifying the exemptions that are planned to be requested and will be mentioned in the upcoming submittals related to the security plans.
CONTACT: Lucieann Vechioli, NRR/DANU 301-415-6035 August 3, 2022 Signed by Vechioli, Lucieann on 08/03/22
W. Jessup 2
X-energy intends to continue to engage with the NRC staff on security and several other topics as part of the pre-application activities for the Xe-100 design. X-energy plans to submit a TR related to physical protection in the near future for NRC review.
During the open question and answer portion of the meeting, a member of the public noted that the link for the white paper was not properly linked in the NRC webpage for X-energy. The NRC staff took the action to resolve the issue.
Project No. 99902071
Enclosure:
List of Attendees
ML22189A210 NRC-001 OFFICE NRR/DANU/UAL1/PM NRR/DANU/UAL1/LA NSIR/DPCP/RSB/BC NAME LVechioli DGreene ABowers DATE 7/12/2022 7/14/2022 8/2/2022 OFFICE NRR/DANU/UAL1/BC NRR/DANU/UAL1/PM NAME WJessup LVechioli DATE 8/2/2022 8/3/2022
Enclosure List of Attendees PUBLIC MEETING TO DISCUSS THE NRC COMMENTS ON THE SECOND REVISION OF THE WHITE PAPER, PHYSICAL PROTECTION SYSTEM APPROACH, REVISION 2 Monday, June 27, 2022 Name Organization Lucieann Vechioli-Feliciano U.S. Nuclear Regulatory Commission (NRC)
Judy Petrucelli NRC Beth Reed NRC Steven Vitto NRC Charles Teal NRC Thomas Braudt X Energy, LLC Anthony Qualantone X Energy, LLC Ingrid Nordby X Energy, LLC Travis Chapman X Energy, LLC Brandon Hartle X Energy, LLC Gerard Couture X Energy, LLC Ian Davis X Energy, LLC Barry Westreich self John Pfabe self Joseph Rivers self Michelle Byman self Rani Franovich Breakthrough Institute Eric Thornsbury self