July 6, 2022 Mr. Wyatt Padgett Compliance and Licensing Manager Louisiana Energy Services dba Urenco USA (UUSA)

Urenco USA P.O. Box 1789 Eunice, NM 88231

SUBJECT:

URENCO USA - INSPECTION SCHEDULE FOR CALENDAR YEAR 2023

Dear Mr. Padgett:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the Urenco USA facility in calendar year 2023. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or reactive inspections are not included in the schedule.

If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Leonard Pitts at (404) 997-4708 with any questions or concerns you may have regarding this letter or the inspection schedule.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Leonard Pitts, Acting Branch Chief Projects Branch 1 Division of Fuel Facility Inspection Docket No. 07003103 License No. SNM-2010

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV

W. Padgett 2

SUBJECT:

URENCO USA - INSPECTION SCHEDULE FOR CALENDAR YEAR 2023 DISTRIBUTION:

A. Masters, RII/DFFI A. Rivera-Varona, NMSS/DFM J. Zimmerman, NMSS/DFM K. Everly, NSIR/DSO S. Bazian, NSIR/DSO L. Pitts, RII/DFFI M. Bartlett, NMSS R. Williams, RII/DFFI

2023 U.S. NUCLEAR REGULATORY COMMISSION INSPECTION/ACTIVITY PLAN FOR URENCO USA Number of Dates Description/Inspection Procedures (IPs)

Inspectors February 13 - 16 2 Operational Safety 1 (IP 88020)

April 3 - 6 1 Nuclear Criticality Safety 1 (IP 88015)

April 24 - 27 3 Corrective Action Program (IP 88161)

August 28 - 31 1 Operational Safety 2 (IP 88020)

October 23 - 26 1 Nuclear Criticality Safety 2 (IP 88015)

Access Authorization (IP 81815)

December 11 - 14 3 Information Security (IP 81820)

December 18 - 21 1 Plant Modifications - Annual (IP 88070)

To Be Determined 3 Evaluation of Exercises and Drills (IP 88051)