July 6, 2022 Ms. Kelly L. Fitch Regulatory Manager American Centrifuge Operating, LLC 3930 U.S. Route 23 South P. O. Box 628 Mail Stop 7560 Piketon, OH 45661

SUBJECT:

AMERICAN CENTRIFUGE OPERATING, LLC - INSPECTION SCHEDULE FOR CALENDAR YEAR 2023

Dear Ms. Fitch:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the CENTRUS facilities in calendar year 2023. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or reactive inspections are not included in the schedule.

If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Leonard Pitts at (404) 997-4708 with any questions or concerns you may have regarding this letter or the inspection schedule.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Leonard Pitts, Acting Branch Chief Projects Branch 1 Division of Fuel Facility Inspection Docket No. 07007004 License No. SNM-2011

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV

K. Fitch 2

SUBJECT:

AMERICAN CENTRIFUGE OPERATING, LLC - INSPECTION SCHEDULE FOR CALENDAR YEAR 2023 DISTRIBUTION:

A. Masters, RII/DFFI A. Rivera-Varona, NMSS/DFM J. Zimmerman, NMSS/DFM K. Everly, NSIR/DSO S. Bazian, NSIR/DSO L. Pitts, RII/DFFI R. Williams, RII/DFFI Y. Faraz, NMSS/DFM

2023 U.S. NUCLEAR REGULATORY COMMISSION INSPECTION/ACTIVITY PLAN FOR CENTRUS CENTRUS Headquarters Dates January 26 Number of Inspectors 2 IP 81815, Access Authorization Inspection Procedures (IPs)

IP 81820, Information Security CENTRUS - American Centrifuge Plant Dates July 10 - 13 Number of Inspectors 3 IP 81815, Access Authorization Inspection Procedures IP 81820, Information Security CENTRUS - Technology and Manufacturing Center Dates November 13 - 16 Number of Inspectors 3 IP 81815, Access Authorization Inspection Procedures IP 81820, Information Security Enclosure