ML22186A114
| ML22186A114 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/12/2018 |
| From: | Randy Baker NRC/RGN-III/DRS/OLB |
| To: | FirstEnergy Nuclear Operating Co |
| Baker R | |
| Shared Package | |
| ML17068A442 | List: |
| References | |
| Download: ML22186A114 (1) | |
Text
Page 1 of 1 DRAFT OUTLINE COMMENTS Facility: DAVIS-BESSE NUCLEAR POWER STATION First Exam Date:
FEBRUARY 5 - 16, 2018 Written Exam Outline (Prepared by NRC)
Comment Resolution 1
Several KAs needed to be replaced due to inapplicability and/or inability to write an operationally valid question at the appropriate license level.
Replacement KAs were randomly selected within the applicable category and approved by the Chief Examiner. (See ES-401-4) 2 Administrative JPM Outline (11/08/2017)
Comment Resolution 1 Ensure RO A3 is New JPM since same KA used on 2016 Exam (2.3.7-JPM 298)
RO A3 will be new 2 Ensure SRO A2 is an SRO Only job task for performing S/D Safety Assmt.
Verified S/D Safety Assessment is an SRO-only Job Task 3
Control Room / In-Plant System JPM Outline (11/08/2017)
Comment Resolution 1 Ensure S1 and S2 are both New JPMs. Both will be new 2 S6 has been replaced with a New JPM.
Simulator Scenario Outline Comments (11/08/2017)
Comment Resolution 1 How to determine at least 1 scenario is new or significantly modified?
> or = 2 events are not repeated from the previous 2 NRC exams.
2 3
4 5