2018 DB Ile Outline Comments
ML22186A114
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/12/2018
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
FirstEnergy Nuclear Operating Co
Baker R
Shared Package
ML17068A442 List:
References
Download: ML22186A114 (1)


Text

Page 1 of 1 DRAFT OUTLINE COMMENTS Facility: DAVIS-BESSE NUCLEAR POWER STATION First Exam Date:

FEBRUARY 5 - 16, 2018 Written Exam Outline (Prepared by NRC)

Comment Resolution 1

Several KAs needed to be replaced due to inapplicability and/or inability to write an operationally valid question at the appropriate license level.

Replacement KAs were randomly selected within the applicable category and approved by the Chief Examiner. (See ES-401-4) 2 Administrative JPM Outline (11/08/2017)

Comment Resolution 1 Ensure RO A3 is New JPM since same KA used on 2016 Exam (2.3.7-JPM 298)

RO A3 will be new 2 Ensure SRO A2 is an SRO Only job task for performing S/D Safety Assmt.

Verified S/D Safety Assessment is an SRO-only Job Task 3

Control Room / In-Plant System JPM Outline (11/08/2017)

Comment Resolution 1 Ensure S1 and S2 are both New JPMs. Both will be new 2 S6 has been replaced with a New JPM.

Simulator Scenario Outline Comments (11/08/2017)

Comment Resolution 1 How to determine at least 1 scenario is new or significantly modified?

> or = 2 events are not repeated from the previous 2 NRC exams.

2 3