Entergy Nuclear Operations, Inc., Entergy Nuclear Palisades, LLC - License Transfer to Holtec Palisades, LLC and Holtec Decommissioning International, LLC
ML22182A482
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/24/2022
From: Curtis R
Nuclear Electric Insurance, Ltd
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML22182A482 (1)


Text

June 24, 2022 ATTN: Document Control Desk Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-00()1 Nuclear Electric Insurance Limited 1201 N Market St Suite 1200 Wilmington, DE 19801 Re.: Entergy Nuclear Operations, Inc., Entergy Nuclear Palisades, LLC - License Transfer to Holtec Palisades, LLC and Holtec Decommissioning International, LLC To whom it may concern:

This letter confirms that Nuclear Electric Insurance Limited is willing to write a Nuclear Liability and Decontamination Insurance Policy for Holtec Palisades, LLC as 100% owner and Holtec Decommissioning, International, LLC as licensee of the Big Rock Point Nuclear Power Station, subject to the payment of premium. A Nuclear Liability and Decontamination Insurance Policy will be effective upon close of the transfer of the facility license from Entergy Nuclear Operations, Inc.,

Entergy Nuclear Palisades, LLC.

The limits on the above referenced policy will satisfy the NRC required minimum insurance limit of $50 million for this site.

This commitment to write a Nuclear Liability and Decontamination Insurance Policy for Holtec Palisades, LLC and Holtec Decommissioning International, LLC for a twelve-month policy period remains valid through July 28, 2022. If the asset transfer takes place after that date, we will review the circumstances before re-stating our commitment.

Sincerely, Robert Curtis Vice President - Chief Underwriting Officer cc:

Kate Fowler (Marsh USA)

Jon Levis (NEIL)

Scott Lauchlan (NEIL)

Ken Manne (NEIL)

Peter Cavanaugh (NEIL)