ML22181A048
| ML22181A048 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 06/30/2022 |
| From: | Welt H Constellation Energy Generation |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML22181A047 | List: |
| References | |
| BYRON 2022-0039 | |
| Download: ML22181A048 (1) | |
Text
Constellation June 30, 2022 L TR:
BYRON 2022-0039 File:
1.10.0101 (1D.101) 2.01.0300 (5A.101)
United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station Units 1 and 2 Constellation Energy Generation. LLC (CEG)
Byron Station 4450 N. German Church Road Byron, IL 61010-9794 www. constellatronenergy. com Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455
Subject:
Byron Station Unit 1 Cycle 25 Core Operating Limits Report and Byron Station Unit 2 Cycle 24 Core Operating Limits Report In accordance with Technical Specification 5.6.5, "Core Operating Limits Report (COLR),"
we are submitting the Unit 1 COLR, Revision 17, for Cycle 25, and the Unit 2 COLR, Revision 14, for Cycle 24 Core Operating Limits Report.
The COLRs for Byron Units 1 and 2 were updated for consistency with the Byron Technical Specification Amendment 227 that was approved via NRC Safety Evaluation, "Issuance of Amendments Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066),"
dated March 22, 2022.
Should you have any questions concerning this report, please contact Ms. Zoe Cox, Regulatory Assurance Manager, at (815) 406-2800.
Respectfully,
/1-2)~,u--
Harris Welt Site Vice President Byron Generating Station Attachments: 1. Byron Station Unit 1 Cycle 25, COLR, Revision 17
- 2. Byron Station Unit 2 Cycle 24, COLR, Revision 14 HW/ZC/mf cc:
Regional Administrator-NRC Region Ill NRC Senior Resident Inspector - Byron Generating Station