July 28, 2022

Mr. James Barstow Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A-C Chattanooga, TN 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT, UNITS 2 AND 3 - CORRECTION OF ERRORS INCURRED DURING ISSUANCE OF LICENSE AMENDMENT NOS. 338 AND 298

Dear Mr. Barstow:

The purpose of this letter is to issue corrections to the Browns Ferry Nuclear Plant (Browns Ferry), Units 2 and 3, Renewed Facility Operating License Nos. DPR-52, and DPR-68.

During the U.S. Nuclear Regulatory Commission (NRC) issuance of the subject amendments (Agencywide Documents and Management System (ADAMS) Accession No. ML21041A489) on April 8, 2021, it issued technical specification (TS) pages with additional punctuation that was not requested by Tennessee Valley Authority. On Browns Ferry, Unit 2, TS page 3.5-11a, and Browns Ferry, Unit 3, TS pages 3.6-2, 3.6-8, and 3.7-5, a period was placed after the words In accordance with the Surveillance Frequency Control Program in the FREQUENCY column.

The NRC concludes that these corrections are entirely editorial in nature and do not change the staffs previous conclusion in the safety evaluation for issuance of Amendment Nos. 338 and 298, nor do they affect the no significant hazards considerations, as published in the Federal Register on June 2, 2020 (85 FR 33752).

Enclosed, please find corrected TS page 3.5-11a for Unit 2, and TS pages 3.6-2, 3.6-8, and 3.7-5 for Unit 3.

J. Barstow

If you have any questions regarding this matter, please contact me at (301) 415-1627 or by email at Kimberly.Green@nrc.gov.

Sincerely,

/RA/

Kimberly J. Green, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket Nos. 50-260 and 50-296

Enclosure:

Correction to Amendment No. 338 Correction to Amendment No. 298

cc: Listserv

ENCLOSURE

BROWNS FERRY NUCLEAR PLANT, UNIT NOS. 2 AND 3

DOCKET NOS. 50-260 AND 50-296

CORRECTED LICENSE AMENDMENT NOS. 338 AND 298 UNIT 2 TECHNICAL SPECIFICATION PAGE 3.5-11A UNIT 3 TECHNICAL SPECIFICATION PAGES 3.6-2, 3.6-8, AND 3.7-5

RPV Water Inventory Control 3.5.2

SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY

SR 3.5.2.7 -----------------------------NOTE------------------------

Vessel injection/spray may be excluded.

Verify the required ECCS injection/spray In accordance subsystem can be manually operated. with the Surveillance Frequency Control Program

BFN-UNIT 2 3.5-11a Amendment No. 000 3ULPDU\\&RQWDLQPHQW



6859(,//$1&(5(48,5(0(176

6859(,//$1&( )5(48(1&<

65  3HUIRUPUHTXLUHGYLVXDOH[DPLQDWLRQVDQG,QDFFRUGDQFH

OHDNDJHUDWHWHVWLQJH[FHSWIRUSULPDU\\ZLWKWKH3ULPDU\\

FRQWDLQPHQWDLUORFNWHVWLQJ LQDFFRUGDQFH&RQWDLQPHQW

ZLWKWKH3ULPDU\\&RQWDLQPHQW/HDNDJH5DWH/HDNDJH5DWH

7HVWLQJ3URJUDP  7HVWLQJ3URJUDP

65  9HULI\\GU\\ZHOOWRVXSSUHVVLRQFKDPEHU,QDFFRUGDQFH

GLIIHUHQWLDOSUHVVXUHGRHVQRWGHFUHDVHDWDZLWKWKH

UDWH! LQFKZDWHUJDXJHSHUPLQXWHRYHU6XUYHLOODQFH

D PLQXWHSHULRGDWDQLQLWLDOGLIIHUHQWLDO)UHTXHQF\\

SUHVVXUHRI SVLG  &RQWURO3URJUDP

%)1 81,7  $PHQGPHQW1R  298 

3ULPDU\\&RQWDLQPHQW$LU/RFN



6859(,//$1&(5(48,5(0(176

6859(,//$1&( )5(48(1&<

65  127(6 

$QLQRSHUDEOHDLUORFNGRRUGRHVQRW LQYDOLGDWHWKHSUHYLRXVVXFFHVVIXO SHUIRUPDQFHRIWKHRYHUDOODLUORFNOHDNDJH WHVW 5HVXOWVVKDOOEHHYDOXDWHGDJDLQVW DFFHSWDQFHFULWHULDDSSOLFDEOHWR 65



3HUIRUPUHTXLUHGSULPDU\\FRQWDLQPHQWDLUORFN,QDFFRUGDQFH

OHDNDJHUDWHWHVWLQJLQDFFRUGDQFHZLWKWKHZLWKWKH3ULPDU\\

3ULPDU\\&RQWDLQPHQW/HDNDJH5DWH7HVWLQJ&RQWDLQPHQW

3URJUDP  /HDNDJH5DWH

7HVWLQJ3URJUDP

65  9HULI\\RQO\\RQHGRRULQWKHSULPDU\\,QDFFRUGDQFH

FRQWDLQPHQWDLUORFNFDQEHRSHQHGDWDWLPH ZLWKWKH

6XUYHLOODQFH

)UHTXHQF\\

&RQWURO3URJUDP

%)1 81,7  $PHQGPHQW1R  298 

RHRSW System 3.7.1

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY

SR 3.7.1.1 Verify each RHRSW manual and power In accordance operated valve in the flow path, that is not with the locked, sealed, or otherwise secured in Surveillance position, is in the correct position or can be Frequency aligned to the correct position. Control Program

BFN-UNIT 3 3.7-5 Amendment No. 214, 283, 298000

ML22180A239 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME KGreen RButler DWrona KGreen DATE 6/29/22 6/30/22 7/27/22 7/28/22