ML22179A256

From kanterella
Jump to navigation Jump to search
2018 Prairie Island Ile Post-Exam Package Submittal Letter
ML22179A256
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 09/29/2018
From: Sharp S
Nuclear Management Co
To: Randy Baker
NRC/RGN-III
Baker R
Shared Package
ML17165A317 List:
References
Download: ML22179A256 (2)


Text

'* j J

1717 Wakonade Drive Welch, MN 55089 (l Xcel Energy*

RESP ON SIB LE BY NATURE~

800.895.4999 xcelenergy.com L-Pl-18-058 SEP 2 9 2018 NUREG 1021 Regional Administrator, Region Ill U.S. Nuclear Regulatory Commission ATTN: Randal Baker 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 Renewed License Nos. DPR-42 and DPR-60 2018 Reactor Operator (RO) and Senior Reactor Operator (SRO) Written Examination Post-Examination Comments Reference 1: NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11.

Pursuant to the requirements of Reference 1, Section ES-501, "Initial Post-Examination Activities," the Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), is providing the NRG with the required post-examination documentation. The post-examination documentation was developed as a result of the completion of the NSPM grading and reviews of the Reactor Operator and Senior Reactor Operator License written examinations completed on September 21, 2018 at the Prairie Island Nuclear Generating Plant.

NSPM submits the following information as enclosures: graded written examinations, master examination and answer key, questions asked by and answers given to the applicants during the written examination, post-examination applicant comments, the written examination seating chart, a completed form ES-403-1, "Written Examination Grading Quality Checklist," and the written examination performance analysis.

Form ES-201-3, "Examination Security Agreement," is not fully completed at this time.

NSPM will submit the completed original form ES-201-3, "Examination Security Agreement," in accordance with NUREG 1021, Section ES-501.

OCT 2 2018

Regional Administrator, Region Ill Page 2 Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

/v~~

Scott Sharp 7 v1.r Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure (7) cc: Randal Baker, US NRG Region Ill, with enclosures Robert Orlikowski, US NRG Region Ill, without enclosures OCT 2 2018