ML22173A019

From kanterella
Jump to navigation Jump to search
Bwd 2018 Ile ES-201-1
ML22173A019
Person / Time
Site: Braidwood  
Issue date: 06/27/2018
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Baker R
Shared Package
ML17164A319 List:
References
Download: ML22173A019 (1)


Text

ES-201 Facility:

Date of Examination:

Developed:

Written:

Facility:

NRC:

// Operating: Facility:

NRC:

Days from Exam Target Date*

Chief Examiner's Initials

-240 10/01/2017 RDB 8/4/2017

-210 10/31/2017 RDB 10/2/2017

-210 10/31/2017 RDB 10/4/2017

-210 10/31/2017 N/A

-210 10/31/2017 RDB 11/28/2017

-195 11/15/2017 RDB 10/23/2017

-150 12/30/2017 RDB 1/20/2018

-136 01/13/2018 RDB 2/22/2018

-75 03/15/2018 RDB 3/26/2018 (CE Delayed)

-75 03/15/2018 N/A

-60 03/30/2018 RDB 3/30/2018

-50 04/09/2018 RDB 4/13/2018

-35 04/24/2018 RDB 4/24/2018

-30 04/29/2018 RDB 4/27/2018

-14 05/15/2018 RDB 5/15/2018

-7 05/22/2018 RDB 5/22/2018

-7 05/22/2018 RDB 5/22/2018

-7 05/22/2018 RDB 5/22/2018

-7 05/22/2018 RDB 5/22/2018

-7 05/22/2018 RDB 5/22/2018 Exam Date:

05/29/2018

17. Request facility licensee management feedback on the examination (C.2.l).
18. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; Attachment 5; ES-202, C.3.j; ES-204).
19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k).
20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i).
  • Target dates are based on facility prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted on a case by case basis in coordination with the facility licensee.
12. Written exam and operating test reviews completed (C.3.f).
13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l; C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week.
14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due (C.1.m; C.2.i; ES-202).
15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and Form ES-201-4 prepared (C.1.m; C.2.k; ES-202).
16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h).
7. Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e).
8. Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h; C.3.d-e).
9. Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3); supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).
10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for facility licensee review (C.1.i; C.2.h; C.3.f-g).
11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202).

Task Description (Reference)

1. Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3).

Form ES-201-1 May 29 - June 8, 2018 BRAIDWOOD UNITS 1 & 2 Examination Preparation Checklist

2. NRC examiners and facility contact assigned (C.1.d; C.2.f).
3. Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facilitys prescreening process (ES-401, D.1.b).
4. Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3).
5. Corporate notification letter sent (C.2.e).
6. NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; C.3.d-e).