ML22161B013
| ML22161B013 | |
| Person / Time | |
|---|---|
| Site: | Hermes File:Kairos Power icon.png |
| Issue date: | 06/10/2022 |
| From: | Hastings P Kairos Power |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML22161B012 | List: |
| References | |
| KP‐NRC‐2206‐002 | |
| Download: ML22161B013 (1) | |
Text
KPNRC2206002
June10,2022 DocketNo.507513
USNuclearRegulatoryCommission ATTN:DocumentControlDesk Washington,DC205550001
Subject:
KairosPowerLLC
TransmittalofChangestoPreliminarySafetyAnalysisReportChapter7
References:
- 1. Letter,KairosPowerLLCtoDocumentControlDesk,SubmittalofthePreliminary SafetyAnalysisReportfortheKairosPowerFluorideSaltCooled,HighTemperature NonPowerReactor(Hermes),September29,2021(ML21272A376)
- 2. AuditPlan,NuclearRegulatoryCommission,PlanforaGeneralAuditoftheHermes ConstructionPermitApplication,February10,2022(ML22039A336)
InSeptember2021,KairosPowersubmittedaPreliminarySafetyAnalysisReport(PSAR)(Reference1)as partoftheConstructionPermitApplication(CPA)fortheHermesnonpowerreactor.Thisletter transmitschangestothepagesofthePSARtoaddressNRCfeedbackintheGeneralAudit(Reference2) relatedtotheInstrumentationandControlSysteminChapter7ofthePSAR.Changestothepagesof thePSARareprovidedinEnclosure1.KairosPowerrequestsNRCreviewofthesechangesaspartofthe continuedreviewoftheHermesCPA.
Ifyouhaveanyquestionsorneedanyadditionalinformation,pleasecontactMargaretEllensonat ellenson@kairospower.comor(510)7551861,orDarrellGardneratgardner@kairospower.comor (704)7691226.
Ideclareunderpenaltyofperjurythattheforegoingistrueandcorrect.
ExecutedonJune10,2022
PeterHastings,PE VicePresident,RegulatoryAffairsandQuality
- ChangestoHermesPSARChapter7
xc(w/enclosure):
WilliamKennedy,ActingChief,NRR,AdvancedReactorLicensingBranch BenjaminBeasley,ProjectManager,NRR,AdvancedReactorLicensingBranch EdwardHelvenston,ProjectManager,NRRAdvancedReactorLicensingBranch