ML22161A990

From kanterella
Jump to navigation Jump to search
TCEQ Cross Reference 2020-3
ML22161A990
Person / Time
Issue date: 06/07/2022
From:
Office of Nuclear Material Safety and Safeguards
To:
Beardsley M
Shared Package
ML22151A971 List:
References
Download: ML22161A990 (7)


Text

Enclosure 2 Miscellaneous Corrections 10 CFR Parts 1, 2, 19, 20, 21, 30, 34, 35, 40, 50, 51, 52, 60, 61, 62, 63, 70, 71, 72, 73, 74, 75, 76, 110, and 140 (85 FR 65656)

RATS ID: 2020-3 Effective Date: November 16, 2020 Date Due for State Adoption: November 16, 2023 Change to NRC Section Title State Section Compatibility Category Summary of Change to CFR Difference Yes/No Significant Yes/No If Difference, Why or Why Not Was a Comment Generated

§ 19.8(b)

Information collection requirements:

OMB approval NA D

Revised to read as follows:

(b) The approved information collection requirements contained in this part appear in

§§ 19.12, 19.13, 19.16, and 19.31.

NA

§ 20.1906(d)

Procedures for receiving and opening packages 336.330 (d)

H&S Revised to read as follows:

(d) The licensee shall immediately notify the final delivery carrier and the NRC Headquarters Operations Center by telephone at the numbers specified in appendix A to part 73 of this chapter, when NA TCEQ rules do not have the NRC contact information and thus does not need to be changed.

§ 20.2201(a)(2)

(ii)

Reports of theft or loss of licensed material 336.350 (a)(1)

C Revised to read as follows:

(a) *

(2) *

(ii) All other licensees shall make reports by telephone to the NRC Headquarters Operations Center NA TCEQ rules do not have the NRC contact information and thus does

2 Change to NRC Section Title State Section Compatibility Category Summary of Change to CFR Difference Yes/No Significant Yes/No If Difference, Why or Why Not Was a Comment Generated at the numbers specified in appendix A to part 73 of this chapter.

not need to be changed.

§ 20.2202(d)(2)

Notification of incidents 336.335 (a)

C Revised to read as follows:

(d) *

(2) All other licensees shall make the reports required by paragraphs (a) and (b) of this section by telephone to the NRC Headquarters Operations Center at the numbers specified in appendix A to part 73 of this chapter.

NA TCEQ rules do not have the NRC contact information and thus does not need to be changed.

Appendix D to Part 20 United States Nuclear Regulatory Commission Offices NA D

In the first row of the table in appendix D to part 20, remove the title Division of Incident Response Operations and add in its place Division of Preparedness and Response and remove the email H001@nrc.gov and add in its place Hoo.Hoc@nrc.gov.

NA TCEQ rules do not have the NRC contact information and thus does not need to be changed.

§ 30.50(c)(1)

Reporting requirements 336.335 C

Revised to read as follows:

(c) *

(1) Licensees shall make reports required by paragraphs (a) and NA TCEQ rules do not have the NRC contact information and thus does

3 Change to NRC Section Title State Section Compatibility Category Summary of Change to CFR Difference Yes/No Significant Yes/No If Difference, Why or Why Not Was a Comment Generated (b) of this section by telephone to the NRC Headquarters Operations Center at the numbers specified in appendix A to part 73 of this chapter.

not need to be changed.

§ 34.8(b)

Information collection requirements:

OMB approval NA D

In § 34.8(b), add 34.111, in numerical order.

NA Texas Department of State Health Services (TX DSHS) responsibility

§ 35.390(a)(1)

Training for use of unsealed byproduct material for which a written directive is required NA B

In § 35.390(a)(1), remove Committee on Post-Graduate Training and add in its place Council on Postdoctoral Training.

NA TX DSHS responsibility

§ 35.490 Training for use of manual brachytherapy sources NA B

In § 35.490, in paragraph (a)(1),

remove Committee on Post-Graduate Training and add in its place Council on Postdoctoral Training; And in paragraph (b)(2), remove Committee on Postdoctoral and add in its place Council on Postdoctoral.

NA TX DSHS responsibility

4 Change to NRC Section Title State Section Compatibility Category Summary of Change to CFR Difference Yes/No Significant Yes/No If Difference, Why or Why Not Was a Comment Generated

§ 35.690 Training for use of remote afterloader

units, teletherapy units, and gamma stereotactic radiosurgery units NA B

In § 35.690, in paragraph (a)(1),

remove Committee on Post-Graduate Training and add in its place Council on Postdoctoral Training; And in paragraph (b)(2), remove Committee on Postdoctoral and add in its place Council on Postdoctoral.

NA TX DSHS responsibility

§ 40.8(b)

Information collection requirements:

OMB approval NA D

In § 40.8, in paragraph (b) add 40.14, in numerical order, and in paragraph (c)(3) remove Forms N-71 and associated forms and add in its place IAEA Design Information Questionnaire forms.

NA This information is not part of TCEQ rules.

§ 40.31(g)(1)

Application for specific licenses NA D

In § 40.31(g)(1), remove Form N-71 and associated forms and add in its place IAEA Design Information Questionnaire forms.

NA This information is not part of TCEQ rules.

§ 40.60(c)(1)

Reporting requirements 336.111 3(2) and (3)

C Revised to read as follows:

(c) *

(1) Licensees shall make reports required by paragraphs (a) and (b) of this section by telephone to the NRC Headquarters Operations Center at the numbers specified in appendix A to part 73 of this chapter.

NA TCEQ rules do not have the NRC contact information and thus does not need to be changed.

5 Change to NRC Section Title State Section Compatibility Category Summary of Change to CFR Difference Yes/No Significant Yes/No If Difference, Why or Why Not Was a Comment Generated

§40.67(c) and (d)

Requirement for advance notice for importation of natural uranium from countries that are not party to the Convention on the Physical Protection of Nuclear Material.

NA NRC Revised to read as follows:

(c) The licensee shall notify the Director, Office of Nuclear Security and Incident Response, by telephone at the numbers for the NRC Headquarters Operations Center specified in appendix A to part 73 of this chapter when the shipment is received in the receiving facility.

(d) A licensee who needs to amend a notification shall notify the Director, Office of Nuclear Security and Incident Response, by telephone at the numbers specified for the NRC Headquarters Operations Center in appendix A to part 73 of this chapter.

NA

§ 61.8(c)

Information collection requirements:

OMB approval NA D

In § 61.8(c), remove Form N-71 and associated forms and add in its place IAEA Design Information Questionnaire forms.

NA This information is not part of TCEQ rules.

6 Change to NRC Section Title State Section Compatibility Category Summary of Change to CFR Difference Yes/No Significant Yes/No If Difference, Why or Why Not Was a Comment Generated

§ 61.32(a)

Facility information and verification NA D

In § 61.32(a), remove Form N-71 and associated forms and add in its place IAEA Design Information Questionnaire forms.

NA This information is not part of TCEQ rules.

§ 70.8(c)(1)

Information collection requirements:

OMB approval NA D

In § 70.8(c)(1), remove Form N-71 and associated forms and add in its place IAEA Design Information Questionnaire forms.

NA This information is not part of TCEQ rules.

§ 70.21(g)(1)

Filing NA NRC In § 70.21(g)(1), remove Form N-71 and associated forms and add in its place IAEA Design Information Questionnaire forms.

NA

§ 70.50(c)(1)

Reporting requirements NA C

Revised to read as follows:

(c) *

(1) Licensees shall make reports required by paragraphs (a) and (b) of this section, and by

§ 70.74 and appendix A of this part, if applicable, by telephone to the NRC Headquarters Operations Center at the numbers specified in appendix A to part 73 of this chapter. *

  • NA This information is not part of TCEQ rules.

7 Change to NRC Section Title State Section Compatibility Category Summary of Change to CFR Difference Yes/No Significant Yes/No If Difference, Why or Why Not Was a Comment Generated

§ 70.52(a)

Reports of accidental criticality NA NRC Revised to read as follows:

(a) Each licensee shall notify the NRC Headquarters Operations Center by telephone at the numbers specified in appendix A to part 73 of this chapter within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after discovery of any case of accidental criticality.

NA This information is not part of TCEQ rules.

§ 71.97(c)(3)(i)

Advance notification of shipment of irradiated reactor fuel and nuclear waste NA B

In § 71.97, remove and reserve paragraph (c)(3)(i):

[A list of the names and mailing addresses of the governors designees receiving advance notification of transportation of nuclear waste was published in the FEDERAL REGISTER on June 30, 1995, 60 FR 34306]

NA TX DSHS responsibility Appendix A to Part 71, Table A-1 A1 and A2 Values for Radionuclides Exempt Material Activity Concentrations and Exempt Consignment Activity Limits for Radionuclides NA

[B]

In Appendix A to part 71, in Table A-1, amend the entry radionuclide Sm-147, by removing 8.5 x 101 and adding in its place 8.5 x 1010.

NA TX DSHS responsibility