ML22147A181

From kanterella
Jump to navigation Jump to search
04 Draft Operating Test Comments.Pdf
ML22147A181
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/13/2022
From: Heather Gepford
Operations Branch IV
To:
Entergy Operations
References
Download: ML22147A181 (4)


Text

ANO1 Unit 1 Draft Operating Test Comments NOTE: This summary is being provided in lieu of Form 2.3-3, Operating Test Review Worksheet, because the licensees operating test submittal was reviewed and overall deemed SATISFACTORY.

Scenario 1:

Event 1: Complete BOP actions for starting P14A First TS; add functions 3,4 and 5. Add one hour actions to bypass A + give BOP credit Event 3: Obtain final resolution on expectations for SU2 position for 143-1,143-2 D1 and Page 22: MSLI NOT a critical task Scenario 2:

Narrative should be 95% power Align page numbers Retest/validate event 1 TS table add functional level requirements Event 4 - verify/validate the need for SG level control to be in hand Scenario 3:

Events 1 & 2: resolve ARTS reset (lightbulb issue)

Events 3 & 5: Verify TS calls Delete Event 6B (no actions required)

Scenario 4: N/A JPM S1 (a):

Task standard appears structured well to critical tasks Upgrade candidate JPM S-2 (b):

Change validation time to 3 minutes Upgrade candidate

JPM S-3 (c):

Step 3 not critical Change validation time to 6 minutes End JPM after bay level rising Perform with (f); (f) first and staggered JPM S-4 (d):

No comments JPM S-5 (e):

Delete what the procedure states in the initial conditions Change validation time to 5 minutes JPM S-6 (f):

Change validation time to 6 minutes Perform with (c); (f) first and staggered JPM S-7 (g):

Change validation time to 8 minutes Three handouts make three different colors Delete per step 13.0 of Reactor Trip 1202.01 JPM S-8 (h):

Change validation time to 5 minutes FOR ALL INPLANT JPMs Ensure personnel available to ensure sufficient transfer of applicants Ensure RP and Shift Manager informed exam taking place Upgrades AM; ROs pm; all applicants perform RCA JPMs first to ensure total time in RCA minimized JPM P-1 (i):

Change validation time to 7 minutes Note steps 1-3; 4-5 can be performed in any order

JPM P-2 (j):

Change validation time to 8 minutes Add procedural steps in examiner guide Step 2 - Breaker D21-30 cued by examiner JPM P-3(k):

Change validation time to 13 minutes 3.3.1 should be 8.3.1 on cue sheet JPM A-1:

Discussed GPM margin to ensure appropriate JPM A-2:

Discussed methodology for margins and determination of critical steps Modified to shorten redundant tasks JPM A-3:

Discussed what additional tags may be allowed above the minimum and still be satisfactory JPM A-4:

Discussed margins 2.10 to 2.14 in task standard JPM A-5:

Discussed methodology for determining critical steps Change validation time to 10 minutes JPM A-6:

Modify examiner note (if turned in after first error identified) to ask applicant to identify all errors associated with the document Modified to shorten redundant tasks

JPM A-7:

A-6 and A-7 should probably be administered on separate days JPM A-8:

Unsat JPM (replaced satisfactorily)

JPM A-9:

No comment