ANO1 Unit 1 Draft Operating Test Comments NOTE: This summary is being provided in lieu of Form 2.3-3, Operating Test Review Worksheet, because the licensees operating test submittal was reviewed and overall deemed SATISFACTORY.
Scenario 1:
Event 1: Complete BOP actions for starting P14A First TS; add functions 3,4 and 5. Add one hour actions to bypass A + give BOP credit Event 3: Obtain final resolution on expectations for SU2 position for 143-1,143-2 D1 and Page 22: MSLI NOT a critical task Scenario 2:
Narrative should be 95% power Align page numbers Retest/validate event 1 TS table add functional level requirements Event 4 - verify/validate the need for SG level control to be in hand Scenario 3:
Events 1 & 2: resolve ARTS reset (lightbulb issue)
Events 3 & 5: Verify TS calls Delete Event 6B (no actions required)
Scenario 4: N/A JPM S1 (a):
Task standard appears structured well to critical tasks Upgrade candidate JPM S-2 (b):
Change validation time to 3 minutes Upgrade candidate
JPM S-3 (c):
Step 3 not critical Change validation time to 6 minutes End JPM after bay level rising Perform with (f); (f) first and staggered JPM S-4 (d):
No comments JPM S-5 (e):
Delete what the procedure states in the initial conditions Change validation time to 5 minutes JPM S-6 (f):
Change validation time to 6 minutes Perform with (c); (f) first and staggered JPM S-7 (g):
Change validation time to 8 minutes Three handouts make three different colors Delete per step 13.0 of Reactor Trip 1202.01 JPM S-8 (h):
Change validation time to 5 minutes FOR ALL INPLANT JPMs Ensure personnel available to ensure sufficient transfer of applicants Ensure RP and Shift Manager informed exam taking place Upgrades AM; ROs pm; all applicants perform RCA JPMs first to ensure total time in RCA minimized JPM P-1 (i):
Change validation time to 7 minutes Note steps 1-3; 4-5 can be performed in any order
JPM P-2 (j):
Change validation time to 8 minutes Add procedural steps in examiner guide Step 2 - Breaker D21-30 cued by examiner JPM P-3(k):
Change validation time to 13 minutes 3.3.1 should be 8.3.1 on cue sheet JPM A-1:
Discussed GPM margin to ensure appropriate JPM A-2:
Discussed methodology for margins and determination of critical steps Modified to shorten redundant tasks JPM A-3:
Discussed what additional tags may be allowed above the minimum and still be satisfactory JPM A-4:
Discussed margins 2.10 to 2.14 in task standard JPM A-5:
Discussed methodology for determining critical steps Change validation time to 10 minutes JPM A-6:
Modify examiner note (if turned in after first error identified) to ask applicant to identify all errors associated with the document Modified to shorten redundant tasks
JPM A-7:
A-6 and A-7 should probably be administered on separate days JPM A-8:
Unsat JPM (replaced satisfactorily)
JPM A-9:
No comment