ML22139A055

From kanterella
Jump to navigation Jump to search
GEH BWRX-300 SMR - Verification of the GEH BWRX-300 LTR NEDC-33911P-A, Revision 3, BWRX- 300 Containment Performance
ML22139A055
Person / Time
Site: 99900003
Issue date: 05/19/2022
From:
NRC
To:
NRC/NRR/DNRL/NRLB
References
Download: ML22139A055 (3)


Text

From:

Shea, James Sent:

Thursday, May 19, 2022 8:29 AM To:

Schichlein, Lisa (GE Power Portfolio); Diaz-Quiroz, Jesus G. (GE Power Portfolio); GEH-BWRX-300DocsPEm Resource Cc:

Wadkins, George (GE Power Portfolio); Schiller, Alina; Dudek, Michael; Wittick, Brian; Li, Chang

Subject:

Verification of the GEH BWRX-300 LTR NEDC-33911P-A, Revision 3, BWRX-300 Containment Performance Attachments:

NRC 896 A TR Verification GEH BWRX-300 LTR NEDC-33911P-A Revision 3 Containment Performance MID & BW.pdf Lisa & Jesús In a Letter dated May 12, 2022 (NRC Verification Letter ADAMS ML22131A193 linked below), the staff has verified that the submitted -A, Revision 3 version is acceptable and is approved for referencing in future licensing applications for the BWRX-300 to the extent specified and under the limitations delineated. In addition the signed NRC LTR Verification Form 896 is attached.

NRC Staff Verification Letter for GEH BWRX-300 LTR Containment Performance, Approved Revision 3(ML22131A193)

Also The Public -A, Revision 3, version will be linked on the NRC BWRX-300 public website.

https://www.nrc.gov/reactors/new-reactors/smr/bwrx-300.html James Shea Senior Project Manager phone: (301)415-1388 james.shea@nrc.gov U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop O-7D21 Washington, DC, 20555-0001

Hearing Identifier:

GEH_BWRX300_Docs_Public Email Number:

15 Mail Envelope Properties (BLAPR09MB6899FFD6F55FE2836F1E6A2694D09)

Subject:

Verification of the GEH BWRX-300 LTR NEDC-33911P-A, Revision 3, BWRX-300 Containment Performance Sent Date:

5/19/2022 8:29:00 AM Received Date:

5/19/2022 8:29:04 AM From:

Shea, James Created By:

James.Shea@nrc.gov Recipients:

"Wadkins, George (GE Power Portfolio)" <George.Wadkins@ge.com>

Tracking Status: None "Schiller, Alina" <Alina.Schiller@nrc.gov>

Tracking Status: None "Dudek, Michael" <Michael.Dudek@nrc.gov>

Tracking Status: None "Wittick, Brian" <Brian.Wittick@nrc.gov>

Tracking Status: None "Li, Chang" <Chang.Li2@nrc.gov>

Tracking Status: None "Schichlein, Lisa (GE Power Portfolio)" <lisa.schichlein@ge.com>

Tracking Status: None "Diaz-Quiroz, Jesus G. (GE Power Portfolio)" <Jesus.Diaz-Quiroz@ge.com>

Tracking Status: None "GEH-BWRX-300DocsPEm Resource" <GEH-BWRX-300DocsPEm.Resource@usnrc.onmicrosoft.com>

Tracking Status: None Post Office:

BLAPR09MB6899.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1197 5/19/2022 8:29:04 AM NRC 896 A TR Verification GEH BWRX-300 LTR NEDC-33911P-A Revision 3 Containment Performance MID & BW.pdf 1312231 Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

NRC FORM 896 (01-2021)

-A Topical Report Verification U.S. NUCLEAR REGULATORY COMMISSION NRC FORM 896 (01-2021)

Page 1 of 1 Topical Report Information Report Number:

NEDC-33911P-A, REVISION 3

Title:

BWRX-300 CONTAINMENT PERFORMANCE ADAMS Accession Number:

PKG ML22007A021 EPID:

EPID: L-2020-TOP-0015 Docket Number:

99900003 (GEH Wilmington)

Review Information Office/Division/

Branch:

NRR/DSS/SCPB Lead Reviewers Project Manager:

James Shea Reviewers:

Chang Li, Lead Angelo Stubbs, Second Lead Staff Verification Determination ADAMS Accession Numbers for this Review Package: ML22131A196 E-mail: ML This Form: ML22131A193

The NRC staff has determined that the topical report is acceptable to the extent delineated in the NRC staff's safety evaluation dated:

March 12, 2021 ADAMS Accession No.: ML21008A370 Based on its review of the changes documented in the topical report, the NRC staff has determined that the -

A report is not acceptable for referencing in licensing actions.

Basis for Denial:

Approvals Technical Branch Chief Projects Branch Chief Brian D. Wittick Digitally signed by Brian D. Wittick Date: 2022.05.12 13:49:56 -04'00' Michael I. Dudek Digitally signed by Michael I. Dudek Date: 2022.05.12 13:29:15 -04'00'