B. Beasley UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 MEMORANDUM TO:
William B. Kennedy, Acting Chief Advanced Reactor Licensing Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:
Lucieann Vechioli, Project Manager Advanced Reactor Licensing Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF THE MARCH 8, 2022, PUBLIC MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND X ENERGY LLC REGARDING THE XE-100 PROJECT AT WNP-1 SITE - SUBSURFACE INVESTIGATION APPROACH On March 8, 2022, the U.S. Nuclear Regulatory Commission (NRC) staff held a virtual open to the public meeting with representatives from X Energy LLC (X-energy) and Energy Northwest (ENW) regarding the Xe-100 Reactor Design Subsurface Investigation Approach at the former WNP-1 site. X-energy and ENW presented about this topic with the intention of identifying any NRC staff initial concerns and address them. The meeting notice can be located at Agencywide Documents Access and Management System (ADAMS) Accession No. ML22060A101 and the presentation slides at ADAMS Accession No. ML22049A036. The Enclosure provides the list of meeting attendees.
The meeting began with a discussion about the NRC regulatory requirements for subsurface investigation. Milton Gorden, X-energy, and other representatives from X-energy and ENW, presented the options that are currently available as possible paths for the Department of Energy to authorize the conduct of subsurface investigation at WNP-1. The subsurface investigation is one of the initial and critical activities to support a construction permit application.
CONTACT: Lucieann Vechioli, NRR/DANU (301)415-6035 May 26, 2022 Signed by Vechioli, Lucieann on 05/26/22
W. Kennedy The discussion included the WNP-1 site geologic and hydrologic investigations historical data which could be used for the Xe-100 application. X-energy and ENW plan to supplement the historical data with onsite field studies that are currently in progress. The supporting reports will also include cultural resources review. There is supplemental site-specific data that is not yet available due to the current U. S. Department of Energy restrictions on subsurface investigation under the current site lease agreement. The supplemental studies that have been done and are in progress are being conducted under the current lease agreement terms of use.
The overall discussion outlined the numerous historical and recent evaluations from the site region and vicinity areas that X-energy plans to use to support Xe-100 construction permit application. X-energy plan for the operating license to follow the construction permit submittal and hence it will incorporate any other information that is necessary for the National Environmental Policy Act review.
At the end of the meeting the NRC staff acknowledged that X-energys descriptions of the available data and the plan for supplemental investigation of the groundwater in the area seemed reasonable and adequate for the preapplication stage. Also, assuming the WNP-1 site is the site selected to proceed with the Xe-100 application, the NRC staff noted that the description provided in the presentation appears to include sufficient data points to support review and analysis by the NRC staff if submitted in an application for a construction permit.
However, understanding the extent of monitoring requires further information because the project was formally terminated almost three decades ago (May 1994). Another issue pointed out by the NRC staff was that new and significant information would be part of the review and this may be affected as more time passes between the application submittals.
X-energy and ENW representatives acknowledged these observations, and although the ideal scenario is to limit the new and significant information, they plan to address this issue as necessary when appropriate.
Project No.99902071
Enclosure:
List of Attendees
ML22124A211 NRC-001 OFFICE NRR/DANU/UAL1/PM NRR/DANU/UAL1/LA NRR/DANU/UAL1/BC (A) NRR/DANU/UAL1/PM NAME LVechioli DGreene WKennedy LVechioli DATE 5/17/2022 5/20/2022 5/25/2022 5/26/2022
Enclosure List of Attendees Public Meeting between the U.S. Nuclear Regulatory Commission Staff and X Energy LLC Tuesday, March 8, 2022 Name Organization Ian Jung U.S. Nuclear Regulatory Commission (NRC)
William Kennedy NRC Hosung Ahn NRC Zuhan Xi NRC Lucieann Vechioli NRC Patricia Vokoun NRC Joseph Giacinto NRC Michael Orenak NRC Clifford Munson NRC Kenneth Erwin NRC Gerry Stirewalt NRC Eric Oesterle NRC Joseph Sebrosky NRC Travis Chapman X Energy LLC (X-energy)
Milton Gorden X-energy Paul Ouellette X-energy Ingrid Nordby X-energy Jason Redd X-energy Tom Braudt X-energy Roy Lindengren X-energy Ian Davis X-energy Alan Campbell X-energy Chip Moon X-energy Nathan Clarke X-energy Maury Pressburger X-energy Ian Gifford X-energy Karen Boulware X-energy David Dempsey X-energy Peter Carusona X-energy Bill Elzinga X-energy Kathleen Goodman X-energy Don Gregoire X-energy Dave Lanier X-energy Stephen Moen X-energy Jessica Hansen X-energy Sandra Jannetty X-energy Russell Light X-energy Lisa Matis X-energy Lloyd Philpot X-energy