ML22115A205

From kanterella
Jump to navigation Jump to search
Kairos Power, LLC, Transmittal of Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes Environmental Report
ML22115A205
Person / Time
Site: Hermes
Issue date: 04/22/2022
From: Hastings P
Kairos Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML2211A204 List:
References
KP-NRC-2204-005
Download: ML22115A205 (2)


Text

KP-NRC-2204-005 April 22, 2022 Docket No. 50-7513 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Kairos Power LLC Transmittal of Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes Environmental Report

References:

1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), October 31, 2021 (ML21306A131)
2. Email, Nuclear Regulatory Commission, Tamsen Dozier to Kairos Power LLC, Kairos Power, LLC Hermes Environmental Report Audit Plan, February 2, 2022
3. Email, Tamsen Dozier (NRC Environmental Project Manager) to Darrell Gardner (Kairos Power Licensing Director), Requests for Confirmation of Information for the Environmental Review of the Kairos Hermes Construction Permit Application, March 31, 2022 By letter dated October 31, 2021 (Reference 1), Kairos Power LLC submitted its Environmental Report (ER) in support of the construction permit application (CPA) for the Hermes test reactor. In Reference 2, the Nuclear Regulatory Commission (NR) staff provided the Hermes Environmental Audit Plan. As a result of that audit, the NRC staff provided 22 requests for confirmation of information (RCIs, Reference 3).

The enclosure to this letter provides Kairos Powers confirmation of each RCI. Kairos Power requests NRC review of this information in support of continued review of the Hermes non-power test reactor CPA.

If you have any questions or need any additional information, please contact Marty Bryan at bryan@kairospower.com or at (865) 369-1136, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on April 22, 2022.

Peter Hastings, PE Vice President, Regulatory Affairs and Quality Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211

KP-NRC-2204-005 Page 2

Enclosures:

1) Kairos Power Response to NRC Requests for Confirmation of Information for the Review of the Hermes Environmental Report xc (w/enclosure):

William Kennedy, Acting Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor Licensing Branch Tamsen Dozier, Environmental Project Manager, NMSS, Environmental Review Branch Daniel Barnhurst, Environmental Project Manager, NMSS, Environmental Review Branch