ML22102A199

From kanterella
Jump to navigation Jump to search
BWXT Nuclear Operations Group, Inc. - Material Control and Accounting Program Inspection Report 07000027/2022402 (Cover Letter)
ML22102A199
Person / Time
Site: BWX Technologies
Issue date: 04/12/2022
From: Eric Michel
NRC/RGN-II/DFFI/FFB2
To: Bittner J
BWXT
References
IR 2022402
Download: ML22102A199 (3)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Mr. James J. Bittner Vice President and General Manager Nuclear Operations Group, Inc.

BWXT Nuclear Operations Group, Inc.

P.O. Box 785 Lynchburg, VA 24505-0785

SUBJECT:

BWXT NUCLEAR OPERATIONS GROUP, INC. - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 07000027/2022402

Dear Mr. Bittner:

This letter refers to the Material Control and Accounting (MC&A) inspection conducted on February 28-March 3 and March 14, 2022, at your BWXT Nuclear Operations Group, Inc.

facility (Inspection Report No 07000027/2022402 enclosed). The enclosed report presents the results of this inspection.

This inspection examined activities conducted under your license as they relate to public health and safety, the common defense and security, and to confirm compliance with the Commission's rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel.

Based on the results of this inspection, the NRC has determined that two Severity Level IV violations of NRC requirements occurred. Because BWXT Nuclear Operations Group identified the issues, restored compliance, entered them into the corrective action program, and the issues were not repetitive or willful, these violations are being treated as Non-Cited Violations (NCVs), consistent with Section 2.3.2 of the Enforcement Policy. These NCVs are described in the subject inspection report. If you contest the violation(s) or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to: (1) the Regional Administrator, Region II; (2) the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and (3) the resident inspector at the facility.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.April 12, 2022 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION J. Bittner 2 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATIONHowever, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If Security Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).] In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely, Eric C. Michel, Chief Projects Branch 2 Division of Fuel Facility Inspection Docket No. 07000027 License No. SNM-42

Enclosure:

As stated cc w/o encl: Distribution via LISTSERV Signed by Michel, Eric on 04/12/22

ML22102A199 (Cover letter)

Cover Letter Only: x Non-Sensitive x Publicly Available x SUNSI Review Sensitive Non-Publicly Available OFFICE RII/DFFI RII/DFFI NAME M. Romano E. Michel DATE 04/12/2022 04/12/2022