ML22101A203

From kanterella
Jump to navigation Jump to search
Enclosure 5: Rev. 1 to XE-FUEL-RPT-0015, Physical Security Plan - Redacted
ML22101A203
Person / Time
Site: Triso-X
Issue date: 03/31/2022
From: Wheeler J
TRISO-X
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML22101A200 List:
References
TX0-LTR-0001 XE-FUEL-RPT-0015
Download: ML22101A203 (4)


Text

TX0-LTR-0001

-SAFEGUARDS-INF-eRMA. TION ENCLOSURES PHYSICAL SECURITY PLAN SAFEGUARDS SAFEGUARD~ INFOID\\Y.... TIQN WHEN DETACHED - HANDLE THIS PAGE AS DECONTROLLED

)tenergy SAfE6UARDS INFORMATION TRISO TRISO-X Fuel Fabrication Facility Physical Security Plan Configuration Number XE-FUEL-RPT-0015 Revision 1

Status Approved Date 31-March-2022 Project FUEL NRC Docket 70-7027 Safeguards Information determination Made by:

XE-FUEL-RPT-0015 Revision: 1 Violation of Section 147 of the Atomic Energy Act, "Safeguards Information" is subject to Civil And Criminal penalties.

Name/Title: Jennifer-Wheeler. Director. Regulatory Affairs Organization: X-Energy Date: March 31. 2022 Basis: DG-SGl-1

,.. r s;gnature:. ~*'ti M-----:7 Date: 30-March-2022

.,

  • SAFEGUARDS INFORMATION Page 1 of 81

\\

l

)tenergy Rev.

Date SAFEGUAR9SalNFORMATIQN -.*

CONFIGURATION CONTROL Document Change History Preparer Section or Page Affected Changes XE-FUEL-RPT-0015

. Revision: 1 1

30-March-2022 Joe Rivers All Original document Document Approval

,f Action Designation Name Signature Security Consultant

~~-1--.

- 3/30/2022 Author Joe Rivers Rivers Security Services, LLC Reviewer Safeguards Manager Gerard Couture ~~/r,-/101.t, Approver Director, Regulatory Affairs Jennifer Wheeler ~~y/~3~q2m

(

Date: 30-March-2022

'SAFE6UARDS INFORMATION Page 2 of 81

)(energy

--SAFEGUARDS INFORMAT-teN--

Physical Security Plan f/,.t,t/ I~ /1/tnH )tt:k Jtf 2 $ I t-D/ T;,Jo-X J.7 ma If I} arf /~-/I March-2022 TRISO-X, LLC Oak Ridge, Tennessee 37830 Date: 30-March-2022 SAFE6UARDS INFORMATION XE-FUEL-RPT-0015 Revision: 1 Page 3 of 81