Reactor Pressure Vessel Inservice Inspection Requirements in the U.S.

Michael L. Benson U.S. Nuclear Regulatory Commission International ISI Workshop April 11-14, 2022 Virtual Workshop ML22096A006

Regulations vs. Consensus Standards

  • Inservice inspection requirements for U.S. nuclear power plants are set forth in Title 10 of the Code of Federal Regulations 50.55a (10 CFR 50.55a)
  • American Society of Mechanical Engineers (ASME) Boiler

& Pressure Vessel Code,Section XI, Division 1 (BPV XI) is incorporated by reference (IBR) in 10 CFR 50.55a

Rules of BPV XI, Subsection IWA (2021 Edition)

  • General requirements applicable to all examination activities under BPV XI
  • Programmatic in nature
  • IWA-2400 requires an inservice inspection (ISI) program consisting of plans and schedules
  • Interval dates and inspection periods
  • Applicable Edition and Addenda of BPV XI
  • An ISI interval is a time period during which all the examination requirements of BPV XI must be met (see IWA-2430(a))
  • The current BPV XI ISI interval is 10 years 4/12/2022 3

Rules of BPV XI, Subsection IWB (2021 Edition)

  • Table IWB-2500-1 provides a complete listing of components in scope of BPV XI and defines required method, extent, and frequency of the exam.
  • Organized according to Examination Categories
  • Each category is organized according to Item Numbers
  • Figures in IWB illustrate applicable weld geometries and exam volumes 4/12/2022 4

Rules of BPV XI, Subsection IWB (2021 Edition)

  • Examination Category B-A, Pressure Retaining Welds in Reactor Vessel
  • Item Nos. B1.10-B1.12: vessel shell welds
  • Item Nos. B1.20-B1.22: vessel head welds
  • Item No. B1.30: shell-to-flange weld
  • Item No. B1.40: head-to-flange weld
  • Item No. B1.50-B1.51: repair welds 4/12/2022 5

Rules of BPV XI, Subsection IWB (2021 Edition)

  • Examination Category B-D, Full Penetration Welded Nozzles in Vessels
  • Item Nos. B3.90: nozzle-to-vessel welds
  • Item Nos. B3.100: nozzle inner radius section 4/12/2022 6

BPV XI Rules for Items B1.10-B1.12 (2021 Edition)

  • Circumferential and longitudinal reactor vessel shell welds
  • Method: Volumetric exam
  • Frequency: Once during the first ISI interval and each successive interval
  • Extent: All welds, essentially 100% of defined volume
  • Essentially 100%: IWA-2200(c) - greater than 90% of the defined volume 4/12/2022 7

BPV XI Rules for Items B1.20-B1.22 (2021 Edition)

  • Circumferential and meridional reactor vessel head welds
  • Method: Volumetric exam
  • Frequency: Once during the first ISI interval and each successive interval
  • Extent: Accessible length of all welds, essentially 100% of defined volume 4/12/2022 8

BPV XI Rules for Item B1.30 (2021 Edition)

  • Reactor vessel shell-to-flange weld
  • Method: Volumetric exam
  • Frequency: Once during the first ISI interval and each successive interval
  • Extent: Essentially 100% of the defined volume 4/12/2022 9

BPV XI Rules for Item B1.40 (2021 Edition)

  • Reactor vessel head-to-flange weld
  • Method: Volumetric and surface exam
  • Surface exam only may be used if a pervious volumetric exam did not detect a flaw that exceeds acceptance criteria
  • Frequency: Once during the first ISI interval and each successive interval
  • Extent: Essentially 100% of the defined volume 4/12/2022 10

BPV XI Rules for Items B1.50-B1.51 (2021 Edition)

  • Repair welds exceeding 10% of the nominal wall thickness
  • Method: Volumetric and surface exam
  • Surface exam only may be used if a previous volumetric exam did not detect a flaw that exceeds acceptance criteria
  • Frequency: Once during the first ISI interval and each successive interval
  • Extent: Essentially 100% of the defined volume 4/12/2022 11

BPV XI Rules for Item B3.90 (2021 Edition)

  • Nozzle-to-vessel welds
  • Method: Volumetric
  • Frequency: Once during the first ISI interval and each successive interval
  • Extent: All nozzles, essentially 100% of the defined volume
  • IWB-2500(f) allows 25% sample, as opposed to all nozzles 4/12/2022 12

BPV XI Rules for Item B3.100 (2021 Edition)

  • Reactor vessel nozzle inside radius
  • Method: Volumetric
  • Frequency: Once during the first ISI interval and each successive interval
  • Extent: All nozzles, essentially 100% of the defined volume
  • IWB-2500(f) allows 25% sample, as opposed to all nozzles
  • IWB-2500(g) allows visual exam in lieu of the volumetric exam, under certain conditions 4/12/2022 13

Related Conditions in 10 CFR 50.55a(b)(2)

  • (xxi)(B) conditions on use of IWB-2500(f) and (g)
  • Requires a plant-specific evaluation
  • Not permitted for plants with a renewed license
  • Not permitted for newer plants licensed under 10 CFR 52 4/12/2022 14

Summary

  • ASME BPV XI, Subsection IWB, Categories B-A and B-D
  • Related items