ML22088A250

From kanterella
Jump to navigation Jump to search
Special Report 2022-002 Inoperable Radiation Monitoring Instrumentation Channel
ML22088A250
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/29/2022
From: Lippard G
Dominion Energy South Carolina
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
22-097
Download: ML22088A250 (1)


Text

V.C. Summer Nuclear Station Bradham Blvd & Hwy 215, Jenkinsville, SC 29065 Mailing Address:

P.O. Box 88, Jenkinsville, SC 29065 DominionEnergy.com Attn: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 March 29, 2022 DOMINION ENERGY SOUTH CAROLINA (DESC)

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 SPECIAL REPORT 2022-002

~

Dominion

~

Energy Serial No.22-097 VCS LIC/HK/Rev 0 Docket No. 50-395 License No. NPF-12 INOPERABLE RADIATION MONITORING INSTRUMENTATION CHANNEL Dominion Energy South Carolina, Inc. (DESC) hereby submits Special Report 2022-002 pursuant to the requirements of Technical Specification (TS) 6.9.2, as required by Action 30 of TS 3.3.3.1.b, Table 3.3-6, RADIATION MONITORING INSTRUMENTATION, Item 2.d.iii.

Purge Exhaust Effluent High Range Radiation Monitor, RM-A 14, was declared inoperable on March 16, 2022, at 1607, due to erratic spiking indications. Upon declaring RM-A 14 inoperable, VCSNS implemented a preplanned alternate method of monitoring in accordance with the requirements of Action 30 of TS Table 3.3-6. A replacement for the failed radiation monitor has been ordered and is scheduled to be on site approximately mid-April 2022.

RM-A14 provides radiation monitoring for the Reactor Building Purge Exhaust System as described within Final Safety Analysis Report (FSAR) section 9.4.8.2.2 Reactor Building Purge Supply and Exhaust System, FSAR Figure 9.4-28, and FSAR section 11.4 Process and Effluent Radiological Monitoring Systems.

Should you have any questions, please call Michael S. Moore at (803) 345-4752.

Sincerely,

~Lipp 0

ard Site Vice President V.C. Summer Nuclear Station Commitments contained in this letter: None cc:

G. J. Lindamood - Santee Cooper L. Dudes - NRC Region 11 G. Miller - NRC Project Manager NRC Resident Inspector