ML22083A154

From kanterella
Jump to navigation Jump to search
Licensee Performance Review Presentation NRC 2022 Final
ML22083A154
Person / Time
Issue date: 04/13/2022
From:
Office of Nuclear Security and Incident Response
To:
References
Download: ML22083A154 (19)


Text

Licensee Performance Review https://www.nrc.gov/about-nrc/contactus.html Honeywell Inc.

Metropolis Facility April 13, 2022 10:00 a.m. (EDT)

ML22083A154

Agenda https://www.nrc.gov/about-nrc/contactus.html NRC Our Mission NRC How We Regulate NRC Performance Review Results Honeywell Honeywell Remarks NRC Adjourn Business Portion NRC Question & Answer with Public NRC Adjourn Meeting 2

Our Mission https://www.nrc.gov/about-nrc/contactus.html 3

How We Regulate Inspections Investigations Allegations Incident

Response

Enforcement Performance Assessment https://www.nrc.gov/about-nrc/regulatory.html 4

IMC 2600 - Fuel Cycle Facility Operational Safety and Safeguards Inspection Program Baseline (Core)

Reactive Supplemental 12 Inspection Areas for Category III Facilities https://www.nrc.gov/about-nrc/contactus.html Inspection Program 5

https://www.nrc.gov/about-nrc/contactus.html 2020 &

2021 Inspection Summary 2020 &

2021 Inspection Summary 3

On-site Inspections 3

On-site Inspections 8

Modules 8

Modules 5

Inspectors 5

Inspectors 57 On-Site Hours 57 On-Site Hours 0

Events 0

Events 0

Violations 0

Violations 9

Licensee Performance Review Process https://www.nrc.gov/about-nrc/contactus.html Plant Events Safety Significance Assessment Reactive Inspections Inspection Follow-up Emergent Performance or Generic Safety Issues Assessment Inspection Program Adjustment Inputs NRC Review Results NRC Response Other NRC Actions

  • Enforcement Actions
  • Previous Performance
  • Safety Significance
  • Performance Trends
  • Cross Cutting Issues
  • Corrective Actions No Performance Issues
  • Core Insp. Program
  • Inform the Public Area Needing Improvement (ANI)
  • Insp. Program Changes
  • LPR Frequency
  • Inform the Public Or LPR = Licensee Performance Review Performance Areas 7

LPR Results https://www.nrc.gov/about-nrc/contactus.html 2-Year Assessment Period January 1, 2020 - December 31, 2021 8

Inspection Results https://www.nrc.gov/about-nrc/contactus.html SAFETY OPERATIONS No violations FACILITY SUPPORT No violations SAFEGUARDS No violations RADIOLOGICAL CONTROLS No violations OTHER AREAS No violations 10

LPR RESULTS No program adjustment warranted or ANI identified No NRC Identified Violations Performance Areas No cross-cutting issues No need for additional focus by the licensee or NRC at this time NRC Follow-up No safety-significant issues No security-significant issues 11 https://www.nrc.gov/about-nrc/contactus.html

https://www.nrc.gov/about-nrc/contactus.html LPR SUMARY

  • Honeywell conducted activities safely and securely
  • No Violations of Regulatory Compliance were identified
  • NRC will return to a standard core (routine) inspection program in the next performance assessment cycle (January 1, 2022 - December 31, 2023) 13

https://www.nrc.gov/about-nrc/contactus.html Honeywell Restart Activities

  • In 2021, Honeywell informed the NRC of their intent to resume full operations with an anticipated return to production in 2023.
  • Although some restart activities occurred in 2021, most activities will occur late 2022 and into 2023.
  • The NRC plans to return to the normal core inspection program for calendar years 2022 and 2023. In addition, supplemental inspections have been scheduled in 2022 to support restart activities.

13

Honeywell Remarks https://www.nrc.gov/about-nrc/contactus.html

NRC Response to Mission Critical Functions:

Monitoring plant activities remotely/on-site through inspections and oversight Maintaining emergency response capabilities with Regional IRCs and HQ Limiting and risk-informing on-site inspections for region-based inspectors https://www.nrc.gov/about-nrc/contactus.html

Additional Actions:

Expanded use of telework Ongoing Review of Continuity of Operations Plan Coordinating actions with industry to minimize inspection schedule impacts while protecting inspectors and plant staff NRC Response to https://www.nrc.gov/about-nrc/contactus.html

Informal Question and Answer Session between the NRC and the Public https://www.nrc.gov/about-nrc/contactus.html

Closing Remarks https://www.nrc.gov/about-nrc/contactus.html

Feedback Forms https://www.nrc.gov/about-nrc/contactus.html Feedback forms will be sent out to those members of the public who registered/

An e-mail address is necessary to receive a feedback form. Upon completion, please submit feedback by e-mailing:

Thomas.Vukovinsky@nrc.gov or Nicholas.Peterka@nrc.gov

List of Publicly Available Documents https://www.nrc.gov/about-nrc/contactus.html

  • License Performance Review report 2022-005
  • Idle-ready adjustment letter Inspection Report 2020-005 (ADAMS Accession No. ML20062K159)