ML22066A446

From kanterella
Jump to navigation Jump to search
2021 Annual Report of Emergency Core Cooling System Errors and Model Changes
ML22066A446
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/04/2022
From: Penfield R
Energy Harbor Nuclear Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-22-036
Download: ML22066A446 (3)


Text

energy harbor Perry Nuclear Power Plant IO Center Road P.O. Box 97 Perry, Ohio 44081 Rod L. Penfield 440-280-5382 Site Vice President, Perry Nuclear March 4, 2022 L-22-036 10 CFR 50.46 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 2021 Annual Report of Emergency Core Cooling System Errors and Model Changes Attached is the 2021 Annual Report of Emergency Core Cooling System Errors and Model Changes for the Perry Nuclear Power Plant (PNPP). Energy Harbor Nuclear Corp. is submitting this report to the Nuclear Regulatory Commission (NRC) in accordance with 10 CFR 50.46(a)(3)(ii).

In the previous cycle (within the last 36 months), PNPP's reactor core included both the GE14 and GNF2 fuel types. The last of the GE14 fuel was discharged from the reactor core during the refueling outage that ended in April 2019. 10 CFR 50.46 notifications issued up to April 2022 are evaluated for impact to both the GE14 and GNF2 record of analysis.

There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Manager- Fleet Licensing, at (330) 696-7208.

5.incerely, . .. . 1/)

t:b.Kllv Rod L. Penfi~y*

Perry Nuclear Power Plant L-22-036 Page 2

Attachment:

2021 Annual Report of Emergency Core Cooling System Errors and Model Changes cc: NRC Region Ill Administrator NRC Resident Inspector NRC Project Manager

Attachment L-22-036 2021 Annual Report of Emergency Core Cooling System Errors and Model Changes Page 1 of 1 New Errors and Changes:

Change in an acceptable evaluation model or application of such model:

None.

Errors:

10 CFR 50.46 Notification Letter 2021-01, Error in Fuel Pellet to Plenum Spring Conductance (Condition Report 2021-01110). This notification is applicable to both GNF14 and GNF2 fuel in use at Perry.

10 CFR 50.46 Notification Letter 2021-02, Discrepancy in Inner Cladding Surface Roughness (Condition Report 2021-01110). This notification is applicable to both GNF14 and GNF2 fuel in use at Perry.

In the previous cycle (within the last 36 months), PNPP's reactor core included both the GE14 and GNF2 fuel types. The last of the GE14 fuel was discharged from the reactor core during the refueling outage that ended in April 2019.

10 CFR 50.46 notifications issued up to April 2022 are evaluated for impact to both the GE14 and GNF2 record of analysis.

Report Summary:

The changes to and errors in the PNPP emergency core cooling system (ECCS) evaluation model in 2021 are summarized in the following table:

Perrv Nuclear Power Plant, Unit 1 GE14 fuel GNF2 fuel PCT or PCT PCT or PCT change change Licensing Basis PCT at BEGINNING of 1555°F 1610°F 2021 2021 Activity EM errors Notification 2021-01 0°F 0°F EM errors Notification 2021-02 0°F 0°F EM Changes None None None Licensing Basis PCT at END of 2021 1555°F 1610°F