KP-NRC-2203-006 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 March 3, 2022 Docket No. 50-7513 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Transmittal of Reponses to NRC Questions 1, 2, and 5 on PSAR Section 3.1 on Hermes Construction Permit Application
References:
- 1. Email, Nuclear Regulatory Commission, Edward Helvenston to Darrell Gardner, Drew Peebles, Martin Bryan, NRC Questions for February 9 Public Meeting, February 3, 2022. (ML22034A991)
NRC questions 1, 2, and 5 provided in Reference 1 on the Kairos Power Hermes Test Reactor Preliminary Safety Analysis Report (PSAR) identified typographical errors in Section 3.1 of the PSAR. This letter transmits the associated PSAR changes. Kairos Power requests NRC review of the response in support of continued review of the Hermes non-power test reactor construction permit application.
Changes to the PSAR which correct these errors are provided in Enclosure 1.
If you have any questions or need any additional information, please contact James Tomkins at tomkins@kairospower.com or at (805) 215-6129, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on March 3, 2022.
Peter Hastings, PE Vice President, Regulatory Affairs and Quality
Enclosure:
Changes to PSAR Section 3.1
KP-NRC-2203-006 Page 2 xc (w/enclosure):
William Kennedy, Acting Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor and Licensing Branch Edward Helvenston, Project Manager, Non-Power Production and Utilization Facility Licensing Branch