ML22062B676

From kanterella
Jump to navigation Jump to search
Kairos Power, LLC - Transmittal of Reponses to NRC Questions 1, 2, and 5 on PSAR Section 3.1 on Hermes Construction Permit Application
ML22062B676
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 03/03/2022
From: Hastings P
Kairos Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML22062B675 List:
References
KP-NRC-2203-006
Download: ML22062B676 (2)


Text

KP-NRC-2 203-0 06

March 3, 2022 Docket No. 50-7513

US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Kairos Power LLC Transmittal of Reponses to NRC Questions 1, 2, and 5 on PSAR Section 3.1 on Hermes Construction Permit Application

References:

1. Email, Nuclear Regulatory Commission, Edward Helvenston to Darrell Gardner, Drew Peebles, Martin Bryan, NRC Questions for February 9 Public Meeting, February 3, 2022. (ML22034A991)

NRC questions 1, 2, and 5 provided i n Reference 1 on the Kairos Power Hermes Test Reactor Preliminary Safety Analysis Report (PSAR) identified typographical errors in Section 3.1 of the PSAR. This letter transmits the associated PSAR changes. Kairos Power requests NRC review of the response in support of continued review of the Hermes non-power test reactor construction permit application.

Changes to the PSAR which correct these errors are provided in Enclosure 1.

If you have any questions or need any additional information, please contact James Tomkins at tomkins@kairospower.com or at (805) 215-6 129, or Darrell Gardner at gardner@kairospower.com or (704) 769-1 226.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on March 3, 2022.

Peter Hastings, PE Vice President, Regulatory Affairs and Quality

Enclosure:

Changes to PSAR Section 3.1

Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2 203-0 06 Page 2

xc (w/enclosure):

William Kennedy, Acting Chief, NRR Advanced Re actor L icensing B ranch Benjamin Beasley, Project Manager, NRR Advanced R eactor an d Licensing Branch Edward Helvenston, Project Manager, N on-Power P roduction and U tilization Facility Licensing B ranch