ML22062B303
| ML22062B303 | |
| Person / Time | |
|---|---|
| Site: | Hermes File:Kairos Power icon.png |
| Issue date: | 03/02/2022 |
| From: | Hastings P Kairos Power |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML22062B302 | List: |
| References | |
| KP-NRC-2203-003 | |
| Download: ML22062B303 (2) | |
Text
KP-NRC-2203-003 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 March 2, 2022 Docket No. 50-7513 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Transmittal of Reponses to NRC Questions 2-3-22-Q17 on Hermes Preliminary Safety Analysis Report
References:
- 1. Email, Nuclear Regulatory Commission, Edward Helvenston to Darrell Gardner, NRC Questions for February 9 Public Meeting, February 22, 2022, ML22034A991 This letter transmits a response to NRC question 17 provided in Reference 1 on the Kairos Power Hermes Test Reactor Preliminary Safety Analysis Report. Kairos Power requests NRC review of the response in support of continued review of the Hermes non-power test reactor construction permit application.
The response is provided as Enclosure 1 to this letter.
If you have any questions or need any additional information, please contact Margaret Ellenson at ellenson@kairospower.com or at (510) 755-1861, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on March 2, 2022.
Peter Hastings, PE Vice President, Regulatory Affairs and Quality
Enclosures:
- 1) Kairos Power Response to NRC Question Q17
KP-NRC-2203-003 Page 2 xc (w/enclosure):
William Kennedy, Acting Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor and Licensing Branch Edward Helvenston, Project Manager, Non-Power Production and Utilization Facility Licensing Branch