ML22062B303

From kanterella
Jump to navigation Jump to search
Kairos Power LLC, Transmittal of Reponses to NRC Questions 2-3-22-Q17 on Hermes Preliminary Safety Analysis Report
ML22062B303
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 03/02/2022
From: Hastings P
Kairos Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML22062B302 List:
References
KP-NRC-2203-003
Download: ML22062B303 (2)


Text

KP-NRC-2203- 003

March 2, 2022 Docket No. 50- 7513

US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Kairos Power LLC Transmittal of Reponses to NRC Questions 2 22-Q17 on Hermes Preliminary Safety Analysis Report

References:

1. Email, Nuclear Regulatory Commission, Edward Helvenston to Darrell Gardner, NRC Questions for February 9 Public Meeting, February 22, 2022, ML22034A991

This letter transmits a response to NRC question 17 provided in Reference 1 on the Kairos Power Hermes Test Reactor Preliminary Safety Analysis Report. Kairos Power requests NRC review of the response in support of continued review of the Hermes non -power test reactor construction permit application.

The response is provided as Enclosure 1 to this letter.

If you have any questions or need any additional information, please contact Margaret Ellenson at ellenson@kairospower.com or at (510) 755 -1861, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on March 2, 2022.

Peter Hastings, PE Vice President, Regulatory Affairs and Quality

Enclosures:

1) Kairos Power Response to NRC Question Q17

Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211

KP-NRC-2203- 003 Page 2

xc (w/enclosure):

William Kennedy, Acting Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor and Licensing Branch Edward Helvenston, Project Manager, Non-Power Production and Utilization Facility Licensing Branch