ML22049B544

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation (ISFSI) Annual Effluent Report, January Through December 2021
ML22049B544
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/18/2022
From: Domingos C
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
L-Pl-22-006
Download: ML22049B544 (2)


Text

fl Xcel Energy

  • 17 17 Wakon ade Drive We lc h, MN 55 08 9

February 18, 2022 L-Pl-22-006 10 CFR 72.44(d)(3)

ISFSI Tech Spec 5.3 ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60

Prairie Island Independent Spent Fuel Storage Installation Docket No. 72-10 Materials License No. SNM-2506

Independent Spent Fuel Storage Installation (ISFSI) Annual Effluent Report, January through December 2021

Pursuant to the requirements of 10 CFR 72.44(d)(3) and the Prairie Island Nuclear Generating Plant ISFSI Technical Specifications, Section 5.3, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM "), submits the enclosed ISFSI Annual Effluent Report for the period of January through December 2021.

Summary of Commitments

~ ~ new comm r~ and no revisions to existing commitments.

Christopher P. Domingos Site Vice President, Monticello and Prairie Island Nuclear Generating Plants Northern States Power Company - Minnesota

Enclosure

cc : Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC State of Minnesota, Department of Commerce ENCLOSURE

PRAIRIE ISLAND NUCLEAR GENERATING PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

ANNUAL EFFLUENT REPORT, JANUARY THROUGH DECEMBER 2021

Independent Spent Fuel Storage Installation 47 Total Casks

During the 2021 calendar year, there were zero (0) additional casks loaded and placed in the Prairie Island ISFSI. At the end of the 2021 calendar year, there remains a total of forty-seven (47) casks loaded in the Prairie Island ISFSI.

Airborne Effluent Releases from the ISFSI 0.00E+00 Ci

There was no airborne effluent release from the Prairie Island ISFSI during the calendar year 2020.

Liquid Effluent Releases from the ISFSI O.00E+00 Ci

There was no liquid effluent release from the Prairie Island ISFSI during the calendar year 2020.

Dose to Individuals Due to ISFSI Effluent Releases 0.00E+00 mrem

Page 1 of 1