Kairos Power LLC, Response to NRC Questions 2.4-1, 2.4-2, and 2.4-3 for PSAR Section 2.4 on Hermes Construction Permit Application
ML22040A141
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 02/08/2022
From: Hastings P
Kairos Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML22040A140 List:
References
KP-NRC-2202-001
Download: ML22040A141 (2)


Text

KP-NRC-2202- 001

February 8, 2022 Docket No. 50- 7513

US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Kairos Power LLC Kairos Power Response to NRC Question s 2.4-1, 2.4-2, and 2.4-3 for PSAR Section 2.4 on Hermes Construction Permit Application

References:

1. Email, Nuclear Regulatory Commission, Benjamin Beasley to Darrell Gardner, Preliminary question on the Hermes PSAR, email #1, January 10, 2022.

This letter provides a response to NRC questions 2.4-1, 2.4.2 and 2.4-3 provided in Reference 1 on the Kairos Power Hermes Test Reactor Preliminary Safety Analysis Report Section 2.4, Hydrology. Kairos Power requests NRC review of the response in support of continued review of the Hermes non -power test reactor construction permit application.

The response is provided as Enclosure 1 to this letter.

If you have any questions or need any additional information, please contact Marty Bryan at bryan@kairospower.com or at (704) 317-7278, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on February 8, 2022

Sincerely,

Peter Hastings, PE Vice President, Regulatory Affairs and Quality

Enclosures:

1) Kairos Power Response to NRC Questions 2.4-1, 2.4-2 and 2.4-3

Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211

KP-NRC-2202- 001 Page 2

xc (w/enclosure):

William Kennedy, Acting Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor and Licensing Branch