KP-NRC-2202-001 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 February 8, 2022 Docket No. 50-7513 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Kairos Power Response to NRC Questions 2.4-1, 2.4-2, and 2.4-3 for PSAR Section 2.4 on Hermes Construction Permit Application
References:
- 1. Email, Nuclear Regulatory Commission, Benjamin Beasley to Darrell Gardner, Preliminary question on the Hermes PSAR, email #1, January 10, 2022.
This letter provides a response to NRC questions 2.4-1, 2.4.2 and 2.4-3 provided in Reference 1 on the Kairos Power Hermes Test Reactor Preliminary Safety Analysis Report Section 2.4, Hydrology. Kairos Power requests NRC review of the response in support of continued review of the Hermes non-power test reactor construction permit application.
The response is provided as Enclosure 1 to this letter.
If you have any questions or need any additional information, please contact Marty Bryan at bryan@kairospower.com or at (704) 317-7278, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on February 8, 2022 Sincerely, Peter Hastings, PE Vice President, Regulatory Affairs and Quality
Enclosures:
- 1) Kairos Power Response to NRC Questions 2.4-1, 2.4-2 and 2.4-3
KP-NRC-2202-001 Page 2 xc (w/enclosure):
William Kennedy, Acting Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor and Licensing Branch