ML22038A209
ML22038A209 | |
Person / Time | |
---|---|
Issue date: | 02/14/2022 |
From: | Scott Moore Advisory Committee on Reactor Safeguards |
To: | Dan Dorman NRC/EDO |
Burkhart L | |
References | |
Download: ML22038A209 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, DC 20555 - 0001 February 14, 2022 MEMORANDUM TO: Daniel H. Dorman Executive Director for Operations Signed by Moore, Scott FROM: Scott W. Moore, Executive Director on 02/14/22 Advisory Committee on Reactor Safeguards
SUBJECT:
REGULATORY GUIDES AND INTERIM STAFF GUIDANCE During the 692nd meeting of the Advisory Committee on Reactor Safeguards (ACRS),
February 2-4, 2022, the Committee considered the following regulatory guides and interim staff guidance. No response to this memorandum is required.
REGULATORY GUIDES AND INTERIM STAFF GUIDANCE Draft Guide (DG)-1290 (Revision 3 to Regulatory Guide (RG) 1.59), Design Basis Floods for Nuclear Power Plants (ML19289E458). The Committee requests a review after resolution of public comments.
DG-4030 (new RG 1.249), Use of Arcon Methodology for Calculation of Accident-Related Offsite Atmospheric Dispersion Factors (ML21165A003). The Committee requests an information briefing and will arrange a Subcommittee meeting.
Draft Interim Staff Guidance (ISG), Safety Review of Light-Water Power Reactor Construction Permit Application (ML21165A157). The Committee requests a review after resolution of public comments.
cc: A. Vietti-Cook, SECY D. Johnson, OEDO S. Miotla, OEDO L. Lund, RES M. Rahimi, RES H. Karagiannis, RES CONTACT: L. Burkhart, ACRS 301-287-3775
UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, DC 20555 - 0001 February 14, 2022 MEMORANDUM TO: Daniel H. Dorman Executive Director for Operations FROM: Scott W. Moore, Executive Director Advisory Committee on Reactor Safeguards
SUBJECT:
REGULATORY GUIDES AND INTERIM STAFF GUIDANCE During the 692nd meeting of the Advisory Committee on Reactor Safeguards (ACRS),
February 2-4, 2022, the Committee considered the following regulatory guides and interim staff guidance. No response to this memorandum is required.
REGULATORY GUIDES AND INTERIM STAFF GUIDANCE Draft Guide (DG)-1290 (Revision 3 to Regulatory Guide (RG) 1.59), Design Basis Floods for Nuclear Power Plants (ML19289E458). The Committee requests a review after resolution of public comments.
DG-4030 (new RG 1.249), Use of Arcon Methodology for Calculation of Accident-Related Offsite Atmospheric Dispersion Factors (ML21165A003). The Committee requests an information briefing and will arrange a Subcommittee meeting.
Draft Interim Staff Guidance (ISG), Safety Review of Light-Water Power Reactor Construction Permit Application, (ML21165A157). The Committee requests a review after resolution of public comments.
cc: A. Vietti-Cook, SECY D. Johnson, OEDO S. Miotla, OEDO L. Lund, RES M. Rahimi, RES H. Karagiannis, RES CONTACT: L. Burkhart, ACRS 301-287-3775 Accession No: ML22038A209 Publicly Available Y Sensitive N Viewing Rights: NRC Users or ACRS Only or See Restricted distribution OFFICE ACRS/TSB SUNSI Review ACRS NAME LBurkhart LBurkhart SMoore (SWM)
DATE 2/7/2021 2/7/2021 2/11/2021 OFFICIAL RECORD COPY