Submittal of Technical Specification Bases Pages
ML22032A268
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 01/28/2022
From: Armstrong L
Dominion Energy Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML22032A267 List:
References
22-022
Download: ML22032A268 (2)


Text

Dominion Energy Nuclear Connecticut, Inc.

Millstone Power Station 314 Rope Ferry Road, Waterford, CT 06385 i/;i Dominion

iiiii"' Energy DominionEnergy.com JAN 2 8 2022 U.S. Nuclear Regulatory Commission Serial No.22-022 Attention
Document Control Desk MPS Lie/JAR RO Washington, DC 20555 Docket No: 50-336 50-423 License Nos. DPR-65 NPF-49 DOMINION ENERGY NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 2 & 3 TECHNICAL SPECIFICATION BASES PAGES In accordance with the requirements of Millstone Power Station Unit 2 (MPS2)

Technical Specification (TS) 6.23.d and Millstone Power Station Unit 3 (MPS3) TS 6.18.d, Dominion Energy Nuclear Connecticut, Inc. (DENC) is providing the Nuclear Regulatory Commission (NRC) with a current copy of the MPS2 and MPS3 TS Bases pages. DENC is submitting a complete copy of the TS Bases for both MPS2 and MPS3 with the incorporation of changes made since DENC's last annual submittal. These TS Bases are provided for information only. Any changes to the Bases sections were made in accordance with the provisions of 10 CFR 50.59. These changes have been reviewed and approved by the Facility Safety Review Committee.

Attachments 1 and 2 provide the TS Bases in their entirety for MPS2 and MPS3, respectively.

If you have any questions or require additional information, please contact Daniel C.

Beachy at (860) 444-5718.

Sincerely,

~-~~

Lori. J. Armstrong Director, Nuclear Station Safety and Licensing

Serial No.22-022 Docket Nos. 50-336 and 50-423 MPS2 and MPS3 Technical Specification Bases Pages Page 2 of 2 Attachments:

1. MPS2 Technical Specification Bases Pages
2. MPS3 Technical Specification Bases Pages Commitments made in this letter: None.

cc: U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 Richard V. Guzman NRC Senior Project Manager U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station